Tender For Defect Rectification On Engineering Systems
Tender Overview
Project Description
Tender For Defect Rectification On Engineering Systems => Limited; 1 Repairs on various engineering systems 2 E-554 :Following equipment canvas cover to be fabricated as per sample: (a) OBM -02 nos. (Size-33’’x28”x17”)(b) Motor driven Diving air compressor-01 no. (Size-48’’x33’’x26’’)(c) Portable DD Pump-02 nos. (Size-26’’x26’’x26’’)(d) Electric Non-Submersible Pump-01 no. (Size-38’’x40’’x28’’) 3 E-555: Port gearbox S/by HP Pump purging line deteriorated. Same to be renewed as per sample. (Mat-Cu-Ni , Size-8mm, Length-200mm) 4 E-556: Both fire & sprinkling pump seal cooling hose deteriorated. Same to be renewed as per sample. (Qty-06) 5 E-557 :Sea water leakage observed from AER Eductor suction line view pin hole at various places. Same to be renewed as per sample and pressure tested up to 05 bar. (Mat:-MS, Dia – 100 mm, L-1 Mtr.). In way job includes removal and fitment of pipeline. 6 E-558: Sea water leakage observed from Fwd bilge & ballast pump suction line view pin hole at various places. Same to be renewed as per sample and pressure tested up to 10 bar. (Mat:-MS, Dia – 100 mm, L-1 Mtr.). In way job includes removal and fitment of pipeline 7 E-559 :Both AC condenser pump discharge valve not holding. Valves to be overhauled and pressure tested up to 07 bar. In way job includes removal and fitment of valves. (SDNR, Dia-125 mm)
BOQ
| Sl. No. | Item Description |
| 1 | Repairs on various engineering systems |
| 2 | E-554 :Following equipment canvas cover to be fabricated as per sample: (a) OBM -02 nos. (Size-33’’x28”x17”)(b) Motor driven Diving air compressor-01 no. (Size-48’’x33’’x26’’)(c) Portable DD Pump-02 nos. (Size-26’’x26’’x26’’)(d) Electric Non-Submersible Pump-01 no. (Size-38’’x40’’x28’’) |
| 3 | E-555: Port gearbox S/by HP Pump purging line deteriorated. Same to be renewed as per sample. (Mat-Cu-Ni , Size-8mm, Length-200mm) |
| 4 | E-556: Both fire & sprinkling pump seal cooling hose deteriorated. Same to be renewed as per sample. (Qty-06) |
| 5 | E-557 :Sea water leakage observed from AER Eductor suction line view pin hole at various places. Same to be renewed as per sample and pressure tested up to 05 bar. (Mat:-MS, Dia – 100 mm, L-1 Mtr.). In way job includes removal and fitment of pipeline. |
| 6 | E-558: Sea water leakage observed from Fwd bilge & ballast pump suction line view pin hole at various places. Same to be renewed as per sample and pressure tested up to 10 bar. (Mat:-MS, Dia – 100 mm, L-1 Mtr.). In way job includes removal and fitment of pipeline |
| 7 | E-559 :Both AC condenser pump discharge valve not holding. Valves to be overhauled and pressure tested up to 07 bar. In way job includes removal and fitment of valves. (SDNR, Dia-125 mm) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender