|
| 1 | Sifting of Mechanised boring machine to work site |
| 2 | Digging of pit for water collecting (Pit size = 3.0mX3.0mX1.00m = 9.00 m3) as per ID SOR CH- 5 SN-1(b) |
| 3 | Drilling of 200mmx350mm boring by small mechanised rig machine i/c lowering all complete Work as per EE Kanpur Letter NO. 622 dated 24.08.23 |
| 4 | Tractor Charges |
| 5 | Development charge by compressor 365 C.F.M. (100 PSI) |
| 6 | Supply of 150 mm dia PVC C.S. pipe |
| 7 | Supply of 150 mm dia PVC R.M.S. Pipe |
| 8 | supply of Nylon mesh (6+1)*1 |
| 9 | Supply of MS Iron Clamp 150 mm DIA |
| 10 | Supply of 150 mm dia PVC End cap |
| 11 | Pea Gravel |
| 12 | Dismantling of cement concrete or brick or granolithic floor ,including base concrete and including stacking of dismantled material as directed by Engineer in charge with in distance 60m as per ID SOR CH-6 S.N. 3 |
| 13 | E/Wexcavation for boaring pit/reacharge pitin ordinary soil as per ID SOR CH-5 S.N.1(b) |
| 14 | C.C. in 1:4:8 (1 cement:4 fine sand:8 40 mm OBB normal size) and curing complete i/c cost of formwork in foundation and floors as per PWD SOR CH-5 SN-1 (PWD SCH-275 |
| 15 | Class M-150 B/W in 1:4 (cement and coarse sand) mortar in reacharge pit and small chamber at 0.35 m thick wall. As per PWD SOR CH-6 SN- 1(6.1.1) |
| 16 | 12 mm cement plaster of mix (in coarse sand) Id SOR C.H. 10, SN 4 (a) |
| 17 | R.C.C. work in 1:2:4 with cement, coarse sand and 20mm stone ballast for cover slab of reacharge pit, small chamber.As per PWD SOR CH-5 SN 14(5.1.3) |
| 18 | MS Iron work with Material and Labour in RCC as per PWD SOR CH-5 SN-20 (5.22.6) |
| 19 | Supply and laying 40 mm OBB for filter media as per PWD SOR CH.-28 SN-5 (23.5) |
| 20 | Supply and laying of bricks M-150 Flat soilingID SOR CH-9SL No-18 |
| 21 | Supply and laying of Pea-gravel (size 2mm-4mm) in Reacharge pit |
| 22 | Supply and laying of coarse sand in reacharge pit for filter media as per PWD SOR CH.-28 SN-7 (23.7) |
| 23 | Supply of Nylonmesh |
| 24 | Supply of P.V.C. Pipe 110 mm dia I.S.I. Make as per I.D. SOR CH-2 S.N. 17(29) |
| 25 | Supply and ofP.V.C.T 110 mm Dia I.S.I. Marked as per PWD SOR CH- 1 SN 35 (46) |
| 26 | Supply and ofP.V.C. Socket110 mm Dia I.S.I. Marked as per PWD SOR CH- 1 SN 35 (50) |
| 27 | Supply and ofP.V.C. Bend110 mm Dia I.S.I. Marked as per PWD SOR CH- 1 SN 35 (40) |
| 28 | Supply of PVC solution ID SOR CH-2 S.N. 17(39) |
| 29 | Supply of C.I.Jali 110x110 mm Marcket Rate |
| 30 | M.S Clamp For Down Pipe as per PWD Sor CH-1 SN- 31(32) |
| 31 | Supply of Murga Jali for Protection Of Down Pipe as per ID SOR CH- 2 Sn- 16(iii) |
| 32 | Colour washing two coat of white wash new surface with cost of chap 13.5 |
| 33 | Pipe laying and Plumbing i/c other miscelleneous work |
| 34 | Sign board |