|
| 1 | Survey, Design,and Supply of all Material , Skilled and Unskilled Labours / Workers , Tools & Plants, consumables etc for successful execution of following works:- |
| 2 | (A) In-situ Treatment of sewage drainsusing any Proven Open Technology including Topographical survey, Flow measurement by installation of Flow measuring devices and V-Notch and water quality analysis of drains, , package wise networking/Interlinkingof drains for collective Treatment of drains , Designing of the complete treatment system, Procurement, installation, testing and commissioning of the complete plant to meet the treated water as per following output parameters, |
| 3 | I. pH- 6.5-8.5, |
| 4 | II. BOD <= 30 mg/L, |
| 5 | III. COD <= 100 mg/L, |
| 6 | IV. TSS <= 50 mg/L, |
| 7 | V. Fecal Coliform < = 230 MPN/100 mL, |
| 8 | VI. DO > = 5 mg/L |
| 9 | along with Intense oxidation/ozonation system to ensure removal of bad odour, fecal coliform and other pathogens ,increase DO and reduce BOD and COD, Installation of online real time output parameter sensors and share the data across SCADA/OCEMS platform (showing the value of TSS, BOD, COD,Feacal Coliform ,Dissolved Oxygen and Flow) to make it available to employer authorities in real time with all civil, electro mechanical, Electric Connection and energy cost (from the grid or diesel generator sets to ensure 24x7 operation of the plants to meet the project objectives) during the entire project period, Removal of all collected sludge and its disposal to the selected site upto 15 km distance, Operation and maintenance of the complete system and Removal of all infrastructure within one month after Completion of the project period. Note:-1- Any Other small drains. having very less discharge located within Municipal Corporation Prayagraj Limits polluting River Ganga & Yamuna within municipal limits will have to be addressed by making adequate arrangement for treatment as per directions of Engineer-In-Charge.2-The work for treatment of drains will have to be carried out for 180 days or till June 2025 whichever is earlier. |
| 10 | The details drains to be treated along with their dischargeas given below:- |
| 11 | 1- Rajapur Drain- 27.166 MLD |
| 12 | 2- ADA Colony Drain/ Jwala Devi Drain - 4.277 Mld |
| 13 | 3- Jondhwal Drain- 6.753 MLD |
| 14 | 4- Shankar Ghat Drain No. 01 -0.444 MLD |
| 15 | 5- Shankar Ghat Drain No. 02- 0.946 MLD |
| 16 | 6- Shankar Ghat Colony Drain (Near Phaphamau Bridge)- 0.951 MLD |
| 17 | 7- Sadar Bazar Drain -4.787 MLD |
| 18 | 8- Salori Drain(Partially) – 8.783 MLD |
| 19 | 9- Shivkuti Drain No. 05- 0.320 MLD |
| 20 | 10- Shivkuti Drain No. 06- 0.275 MLD |
| 21 | 11- Shivkuti Drain No. 07(East)- 0.767 MLD |
| 22 | 12- Govindpur Colony Drain (Purani Basti)- 0.218 MLD |
| 23 | 13- Govindpur Colony Drain No 1- 0.275 MLD |
| 24 | 14- Govindpur Colony Drain No 2- 0.323 MLD |
| 25 | 15- Govindpur Colony Drain No 3- 0.162 MLD |
| 26 | 16- Govindpur Colony Drain No 4- 0.271 MLD |
| 27 | 17- Shivkuti Drain No 1- 1.192 MLD |
| 28 | 18- Shivkuti Drain No 2- 0.162 MLD |
| 29 | 19- Shivkuti Drain No 3 (North)- 0.218 MLD |
| 30 | 20- Shivkuti Drain No 4- 0.278 MLD |
| 31 | 21- Sasur Khaderi (Tapped but overflow) – 10.950 MLD |
| 32 | TOTAL ANTICIPATED DISCHARGE |
| 33 | (B)- Pumping arrangement forfollowing sewage drains upto 3 MLD flow, including topographical survey, water quality analysis of drains, package wise networking of drains, screening and pumping into nearby STP/SPS/Wet well (upto 100 m distance) as directed by Engineer in Charge with all civil, electro mechanical, Electric Connection and energy cost (from the grid ordiesel generator setsto ensure 24x7 operation of the plants to meet the project objectives) during the entire project period, Removal of all collected sludge and its disposal to the selected site upto 15 km distance, Operation and maintenance of the complete system and Removal of all infrastructure within one month after finishing of the project period.Note:-1- Any Other small drains. having very less discharge located within Municipal Corporation Prayagraj Limits polluting River Ganga & Yamuna within municipal limits will have to be addressed by making adequate arrangement for treatment as per directions of Engineer-In-Charge.2-The work for treatment of drains will have to be carried out for 180 days or till June 2025 whichever is earlier. |
| 34 | (Pumping only) |
| 35 | 1- Dariyabad Kakaraghat Drain Mirapur- 2.113 MLD |
| 36 | 2- Dariyabad Pipalghat Drain- 0.120 MLD |
| 37 | TOTAL ANTICIPATED DISCHARGE |