Supply Of Material To grey water management Work At Itagi Village Of Itagi Gp Of Kukanoor Tq Wet Land & Sedmentation Tank Work - Cuddapah Slab 4 Cm Thick Shahabad Thandur Blue,Mason Class 2 (With Tools)-,Add Sundries Charges At 2 % On Material.,Broken Stone Aggregate 20 Mm Size,Broken Stone Aggregate 12 Mm To 10 Mm,Coarse Sand (Zone Iii),Portland Cement,Plasticizer/Super Plasticizer,Mixer (Concrete) - 1 Cum Capacity,Hom Of Vibrator 0.71 Days.,Add Watering Charges At 1% On Material.,Add Sundries Charges At 1% On Material,Tmt Bars Fe500,Binding Wire.E,Mixer (Concrete Small Used In Culvert).,Broken Stone Aggregate 40 Mm Size,Jungle Wood Runners And Planks.S,Silver Oak Or Equivalent Planks 38Mm Thick.K,Casurina Poles 100 - 150Mm,Add Handling , Loading And Unloading At 2% On Material,Filter Media Stone Aggregates,Laboratory Asst. (Sslc Passed) Mate Supervisor,Stone Aggregate(Single Size) 40 Mm Nominalsize,Size Stone 20 X 20 X 25 Cms,Bond Stone 20 X 20 X 45 Cm,Mud Mortar,Rcc Pipes Np2 150 Mm Dia Including Collars,Ms Flat 12 X 75 Mm,Cast Iron Ornamental Design,M.S.Square Bright Bars 20 Mm,Expansion Bolt,Providing Electric Welding Using Carbon Electrodes Including Cost Of Welding Machine,Power Charges, Welding Rods, And Labour Charges For Welding Etc., Complete As Per Specification,Add Over Head Charges 15%,Welder Grade I.,Mechanic Class Ll/Mechanic Hmp Grade L/Eme Grade,Hom Of Welding And Grinding Machine,Hom Of Cutting And Grinding Machine,Providing And Applying Enamel Metal Paint Two Coats (Excluding Priming Coat) Over New Steel Or Other Metal Surface Brushing To Give An Even Shade After Cleaning Oil,Grease, Dirt And Other Foreign Matter,Including Cost Of Materials ,Labour, Complete As Per Specifications.,Tools And Plants And Electrical Charges At2%,Water.,Gravel 2.36 Mm / Murrum,Water Tanker.,Vibratory Roller 8 Tonne.,Corbon Electrodes,Add,Ready Mix Primer Paint (Ready Mix Red Lead Paint),Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint,Painter Class I.,Add Providing And Removing Scaffolding At 3% On Labour.,Enamel Metal Paint,Add Brush At 1% On Cost Of Paint,Ms Flat.T,Bolts And Nuts