| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 4 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 5 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel propsand removal of formwork for upto floor five level for :Walls (any thickness) including attached pilasters, buttresses plinth and stringcourse. |
| 6 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (\"Original producers\" who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)Thermo-mechanically Treated bars (Conforming of relevent IS code) |
| 7 | Providing and laying in position specified grade ofcement concrete forall RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.M20 grade Nominal Mix / Design Mix |
| 8 | Random Rubble stone masonry with hard stone in superstructure aboveplinth level and upto five levelabove 30cm. thick walls in :Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 9 | Add extra for Random Rubble stone masonry with hard stone in Square or Rectangular pillars |
| 10 | Providing&fixingprecastcementconcretecoping1:2:4mix50mmthickcompleteas per specification : |
| 11 | Pointingonstonemasonryincementsandmortar 1:3 (1 cement : 3 sand) :Raised and cut pointing. |
| 12 | Plaster on new surface on walls in cement sand mortar 1:4 including rackingofjointsetc. complete fine finish :20mm thick . |
| 13 | Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding.New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ). |
| 14 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide. |
| 15 | Add or deduct for each wire line over basic item |