| 1 | Scraping of tar road including refusal of dismantled material up to 60.0mtr distance as per directed by engg-in-charge. |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: 2.1.1 All kinds of soil. |
| 3 | Earth work in excavation in trenches or foundation pipes cable etc in ordinary soil including lift upto 1.5m lead upto 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as per directed by Engg. i/c within a lead of 50m. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level : 1:6:12 (1 cement: 6 coarse sand (zone-iii): 12 graded Brick aggregate 40mm (nominal size) |
| 5 | Providing & laying precast cement concrete kerb stone drain etc all complete. |
| 6 | Brick work with common burnt clay (non modular) bricks of class-150 In foundation and plinth in: Cement mortar 1:4 (1 cement: 4 coarse sand) |
| 7 | Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete. |
| 8 | Construction of granular sub base (GSB) by providingcoarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401. |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:2:4 (1 cement: 2 coarse sand (zone-iii): 4 graded stone aggregate 20 mm nominal size) |
| 10 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work. |
| 11 | Raising manhole by dismantling & refixing of manhole cover & frame including dimantling C.C. and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work. |
| 12 | Providing and fixing in position pre-cast R.C.C. manhole cover and frame of required shape and approved quality Circular shape 500 mm Internal diameter |
| 13 | Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work. |
| 14 | Making connection of pipe to the existing manhole/sewer line etc all complete. |
| 15 | Disposal of surplus earth/malwa upto 3.00 km distance including loading/unloading of material with all charge complete. |
| 16 | Add 18 % G.S.T. |