| 1 | Pantoon Erection Work :Clearing jungle including uprooting of vegetation grass, bush, wood, trees and sapling of girth up to 30cm. Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area. S.I. No.-259 |
| 2 | Cartage of Pantoon below item with proper completion of the work including cost of all material labour and T&P etc. from different places to Kola Ghat in Shahjahanpur.R.S. Joist (Baujhi Ghat) |
| 3 | Sal Sleeper(Baujhi Ghat) |
| 4 | Sal Edging(Baujhi Ghat) |
| 5 | Railing Post(Baujhi Ghat) |
| 6 | Chequerred Plates(Baujhi Ghat) |
| 7 | Supply of empty plastic cement bags including cost of material loading, unloading filled with sand including filling statching & stacking site of works and all other charges and taxes etc. S.I. No.-4 |
| 8 | Supply of 10 mmdia Nariyal rope (Bagai Ban) including cost of material loading, unloading, stacking and all other charges and taxes. S.I. No.-12 |
| 9 | Supply of Mallahi keel including cost of material loading, unloading, stacking and all other charges and taxes. 15 cm to 30 long S.I. No.-15 |
| 10 | Supply of 30 mm dia and 30x300 mm long Nut Boltincluding cost of material loading, unloading, cartage upto site and or other charges inlcluding trade tax.S.I. No.-6 |
| 11 | Supply of 13 and 16 mm dia and 30x150 mm long Nut Boltincluding cost of material loading, unloading, cartage upto site and or other charges inlcluding trade tax. S.I. No.-7 |
| 12 | Supply of 16x300 mm long Nut Boltincluding cost of material loading, unloading, cartage upto site and or other charges inlcluding trade tax. S.I. No.-8 |
| 13 | Supply of M.S. washer of 20-30 mm sizeincluding cost of material loading, unloading, cartage upto site and or other charges inlcluding trade tax. S.I. No.-5 |
| 14 | Supply of P.P rope ISI mark. S.I. No.-39 |
| 15 | Cartage of various item such as 10 mm& 20 mm dia steel wire rope 10 mm & 40 mm dia Niriyal rope, Cullcutta sutali, Mallahi keel, Nut Bolt & M.S. washer etc. including loading unloading and stacking. SI No.-16 |
| 16 | making pair of pantoon & Carrying of pantoon pair from the place of anchoring (down streem side of bridge) to the alignment of bridge in water and fixing the same with other pantoon pair and refixing the same in bridge alignment. SI No.-3 |
| 17 | Carraige and laying of R.S. joist (S mtr. Long) Loading unloading cost of carriage from certral store and placing on side as per direction of E/I SI No.-11 |
| 18 | Local shifting of pantoon with help of crane. |
| 19 | Dragging the pantoon from any bed to river water and achering them in down steem site of pantoon bridge. |
| 20 | Carring of pantoon pair from place of anchoring to alignment of bridge in water and fixing the same in pantoon pair in re-fixing the same the bridge alignment. |
| 21 | During carring of pantoon pair from place of anchoring in the water and then to cross the dry bed/shallow water up to the alignment disconection the pantoon pair & fixing in the alignment after. |
| 22 | Carraige and laying sall sleeper loading unloading cost of carriage from certral store and decking on the bridge as per direction of E/I SI No.-9(i) |
| 23 | Same as above item but as sall wood edging. S. No.-9 (ii) |
| 24 | Fixing of railing post including making hole with the help of drill machine over sleeper and sall edging before fixing the railing post with help of 30-16 mm size bolt of 1.25 mtr. Center to center including completion of work. SI No.-8 |
| 25 | Providing and fixing of railing wire 10 mm dia though hole of railing post due to vertical post maing wire stay of each rows and tighten of the stay clamps including making the hole in vertical ballies labour only. SI No.-16 |
| 26 | Supply of culcutta sutali including cost of material loading, unloading, stacking and all other charges and taxes. S.I. No.-04 |
| 27 | Repair of old pantoon including M.S. Sheet, Welding work, Generator and J.C.B. etc. as direction of E/I. |
| 28 | Supply of Labour for pantoon maintenance |
| 29 | Making stay on both side of pantoon bridge with the help of 20 mm / 10 mm wire rope (labour only . As per S.I. No.-36 |
| 30 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dessing the surface to required levels & slopes & also including 1.5 lift & 30m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the enginee incharge (Excluding Royalty). As pe SI No-253 |
| 31 | Supply of wooden ancher (2.40x1.80 x3.10) with 10 & 15 cm eucalyptus balli. S.I. No.-26a |
| 32 | Cartage of wooden ancher in the river on the upstream/down stream side of the pantoon bridge site including their weaving packing the sand filled bages (av. 90 bags) properly before laying and fixing to pantoon with coir rope/sisall rope excluding cost. S.I. No.-12 |
| 33 | Cartage of pantoon from river sand surface to Haidalpur ghat bridge site area including loading on truck trailer & unloading on site. S.I. No.-1b local shiftting of pantoon within 500 m with the help of crain per no.1b |
| 34 | Supply of eucalyptus ballies 100 mm dia. S.I. No.-35ii for approach section. 100 mm |
| 35 | 120 mm |
| 36 | 150 mm |
| 37 | Two coat painting of railing post. Including paint and labour rate. |
| 38 | Supply of wire nail. |
| 39 | Supply of Begai baan. |
| 40 | Making barrier of both side of pantoon bridge with balli |
| 41 | Dismantling Work : Cartage of various item such as 10 mm& 20 mm dia steel wire rope 10 mm & 40 mm dia Niriyal rope, Cullcutta sutali, Mallahi keel, Nut Bolt & M.S. washer etc. including loading unloading and stacking etc at central store. S.I. No.-16 |
| 42 | Dismantling and carrying of railing post fixed in position including opening of 300x16 mm Nutbolt including loading unloading cartage. S.I. No.-6 |
| 43 | Dismantling and carrying sall wood sleeper decking river the bridge including cleaning the kapasa soil and kanse loading unloading carraige and duly satacked at store. S.I. No.-8 |
| 44 | Dismantling and carrying sall edeging decking river the bridge including cleaning the kapasa soil and kanse loading unloading carraige and duly satacked at store. |
| 45 | Carrying the R.S. joist 5.20 mtr. Long between two pantoon after dismanting of pantoon pair loading unloading carraige and duly satacked at store. S.I. No.-9 |
| 46 | Sinking of pantoons to obtain the proper gradient as laid in dry bed/ shallow water in the aligment of pontoon bridge as per direction of E/I |
| 47 | Cartage of pantoon from Baujhi ghat bridge to Mangtora village site area including loading on truck trailer & unloading on site. S.I. No.-1a |
| 48 | Carrying and laying chequred plates laying in the alignment of road for loading into trache including cost of carriage loading unloading T&P and Duly stacked in store. |
| 49 | Dimantling chequred plates in the alignment of road for loading into trache including cost of carriage loading unloading T&P and Duly stacked in store. |
| 50 | Maintinance of Chequered plates road three row chequered plate road As per SI No-30 |
| 51 | Opening of the MS plate and nut bolt from chequered plate (labour rate only) |
| 52 | Extracting 10 mm dia wire rope railing post and making role etc. S.I. No.-4 |
| 53 | Carrying and spreading of kansa poola 5 cm thick over bridge road way before filling of 7.5 cm thick kapsa soil including cartage of kapsa soil from a distance of 1.00 km, On either side of bridge & spreading ramming and dressing the surface as per direction. As per S.I. No.-5 |
| 54 | Spreading of sand (Labour Rate). As per S.I. No.-30 |
| 55 | Cartage of Pantoon by truck/trailar ofter dismantling bridge to approach Jalalabad Road. |
| 56 | Water Curing of approach road of compaction of sand |
| 57 | Carrying and fixing of sign board |
| 58 | Lettering and painting of sign board of size 4x3\" |