Construction of Field Channel of Minor 8 of Distributory No. 10 of TMLC at Chainage 0.43 km in Jalpaiguri district{District- Jalpaiguri, Block- Rajganj, Mouza- Sanyashikata, GP Sanyashikata, JL No. 27, Chainage(km)- 0.43, CCA(in Ha)- 10}. Project ID : WI242520548M000, Sub – Project ID : WI242520548M008
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Lined Field Channel Section A (300 X 425 ) |
| 2 | Earthwork in excavation of foundationtrenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, within a lead on 75m as directed. The item includs necessary trimming the sides of trenches , leveling , dressing and ramming the bottom, bailing out water as required complete.a) Depth of excavationnot exceeding 1500 mm. |
| 3 | Filling in foundation or plinth by Silver sand in layers not exceeding 15 cm. as directed and consolidating the same by thorough saturation with water and ramming complete, including the cost of supply of sand. |
| 4 | Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand |
| 5 | Cement Concrete with 30 mmdown graded shingles excluding shuttering in GF1:3:6 in proportion |
| 6 | 12.5 cm. thick 1st class brickwork in cement mortar (1 : 4) in ground floor including, scaffolding, racking out joints etc. complete |
| 7 | Brick work with 1st class brick in cement mortar( 1:4) in foundtion and plinth . |
| 8 | Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 15 cm. Including watering and ramming etc. layer by layer complete with earth obtained from excavation offoundation. |
| 9 | Fine dressing the crest , side slope bundh etc and turfing with grass sods 5 to 7.5 cm thick including preparation of ground watering ramming etc complete within a lead of 150m and all leads upto 1.5m (land to be arranged by the conctractor by his won cost and measurement to be taken on grown grass complete. |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor. (a) with (1:4) cement mortar.15mm thick |
| 11 | Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete. |
| 12 | Construction of Lined Field Channel Section B (250 X 340 ) |
| 13 | Earthwork in excavation of foundationtrenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or pumping out of water etc. as required complete.Depth of excavation not exceeding 1.5 metre (not required shoring). |
| 14 | Filling in foundation or plintby Silver sand in layers not exceeding 15 cm. as directed and consolidating the same by thorough saturation with water and ramming complete, including the cost of supply of sand. |
| 15 | Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand |
| 16 | Cement Concrete with 30 mmdown graded shingles excluding shuttering in GF1:3:6 in proportion |
| 17 | 12.5 cm. thick 1st class brickwork in cement mortar (1 : 4) in ground floor including, scaffolding, racking out joints etc. complete |
| 18 | Brick work with 1st class brick in cement mortar( 1:4)in foundtion and plinth. |
| 19 | Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 15 cm. Including watering and ramming etc. layer by layer complete with earth obtained from excavation offoundation. |
| 20 | Fine dressing the crest , side slope bundh etc and turfing with grass sods 5 to 7.5 cm thick including preparation of ground watering ramming etc complete within a lead of 150m and all leads upto 1.5m (land to be arranged by the conctractor by his won cost and measurement to be taken on grown grass complete. |
| 21 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor. (a) with (1:4) cement mortar.15mm thick |
| 22 | Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete. |
| 23 | Construction of Unlined field Channel |
| 24 | Earthwork in excavation of foundationtrenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or pumping out of water etc. as required complete.Depth of excavation not exceeding 1.5 metre (not required shoring). |
| 25 | Fine dressing the crest , side slope bundh etc and turfing with grass sods 5 to 7.5 cm thick including preparation of ground watering ramming etc complete within a lead of 150m and all leads upto 1.5m (land to be arranged by the conctractor by his won cost and measurement to be taken on grown grass complete |
| 26 | Construction of Cistern for Field Channel |
| 27 | Earthwork in excavation of foundationtrenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or pumping out of water etc. as required complete.Depth of excavation not exceeding 1.5 metre (not required shoring). |
| 28 | Filling in foundation or plintby Silver sand in layers not exceeding 15 cm. as directed and consolidating the same by thorough saturation with water and ramming complete, including the cost of supply of sand. |
| 29 | Ordinary Cement concrete in all sorts of RCC works with approved graded stone chips 20mm down excluding shuttering and reinorcement if any in GFa) 1:2:4 proportion river bazree |
| 30 | Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand |
| 31 | Brick work with 1st class brick in cement mortar( 1:4) in foundtion and plinth . |
| 32 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor.(a) with (1:4) cement mortar.15mm thick |
| 33 | Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete. |
| 34 | Laying of NP2 Grade Hume pipe 225 mm dia |
| 35 | Earthwork in excavation of foundationtrenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or pumping out of water etc. as required complete.Depth of excavation not exceeding 1.5 metre (not required shoring). |
| 36 | Supply of 225mm dia Class NP2 type RCC spun pipe plus sales tax @ 5% for proposed outlet length 12m. |
| 37 | Supply of matching collar for 225mm dia Class NP2 type RCC spun pipe plus sales tax @ 5% for porposed outlet length 12m. |
| 38 | Labour for loading RCC spun pipe NP 2 into trucks carts etc at lifting points and unloading the materials at destination within a lead of 100m pipe/coller of dia 225-300 mm |
| 39 | Carriage of RC Pipes & collars over pucca road upto 5 km distance (a) Pipe/Collar of dia 225 mm. Extra Rate for carriage of RCC pipeand collar over pucca road beyond 5 KM upto any distance for NP II ,Pipeand collar 225 mm dia Total distance = 45 km, for first 5 km |
| 40 | Carriage of RC Pipes & collars over pucca road upto 5 km distance (a) Pipe/Collar of dia 225 mm. Extra Rate for carriage of RCC pipeand collar over pucca road beyond 5 KM upto any distance for NP II ,Pipeand collar 225 mm dia Total distance = 45 km, for Rest 40 km |
| 41 | Labour charges for laying fitting fixing RC spun pipes with collars (NP2) canal banks, roads,Including caulking the joints of collars as and when necessary, with jute bitumen/ tar & cement mortar 1:3 including preparing subgrade carriage of pipes & collars and other necessary materials including supply and carriage of sand and cement of site, but excluding cost supply of pipe. (c)225 mm dia. |
| 42 | Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 15 cm. Including watering and ramming etc. layer by layer complete with earth obtained from excavation offoundation. |
| 43 | Construction of NP2Grade Hume pipe Culvert 300 mm dia 4 m long |
| 44 | Earthwork in excavation of foundationtrenches or drains in all sorts of soil (including mixed soil but excluding laterite and sand stone), including removing, spreading or stacking the spoils, as directed and including trimming the sides of trenches, levelling, dressing and ramming the bottoms, bailing or pumping out of water etc. as required complete.Depth of excavation not exceeding 1.5 metre (not required shoring). |
| 45 | Filling in foundation or plintby Silver sand in layers not exceeding 15 cm. as directed and consolidating the same by thorough saturation with water and ramming complete, including the cost of supply of sand. |
| 46 | Single brick flat soling of picked Jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. |
| 47 | Cement Concrete with 30 mm down graded shingles excluding shuttering in GF1:3:6 in proportion |
| 48 | Brick work with 1st class brick in cement mortar( 1:4)in foundtion and plinth . |
| 49 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete surface including throating, nosing and drip course as necessary at ground floor.(a) with (1:4) cement mortar.15mm thick |
| 50 | Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete. |
| 51 | Supply of 300mm dia Class NP2 type RCC hume pipe plus sales tax @ 5% for proposed outlet length 4 m. |
| 52 | Supply of matching collar for 300mm dia Class NP2 type RCC hume pipe plus sales tax @ 5% for porposed outlet length 4m. |
| 53 | Labour for loading RCC spun pipe NP 2 into trucks carts etc at lifting points and unloading the materials at destination within a lead of 100m pipe/collar of dia 225-300 mm |
| 54 | Carriage of RC Pipes & collers over pucca road upto 5 km distance (a) Pipe/Coller of dia 300mm. Extra Rate for carriage of RCC pipeand collar over pucca road beyond 5 KM upto any distance for NP II ,Pipeand collar 300 mm dia Total distance 45 Km, for upto 5 km |
| 55 | Carriage of RC Pipes & collers over pucca road upto 5 km distance (a) Pipe/Coller of dia 300mm. Extra Rate for carriage of RCC pipeand collar over pucca road beyond 5 KM upto any distance for NP II ,Pipeand collar 300 mm dia Total distance 45 Km, for next 40 km |
| 56 | Labour charges for laying fitting fixing RC spun pipes with collars (NP2) canal banks, roads,Including caulking the joints of collars as and when necessary, with jute bitumen/ tar& cement mortar 1:3 including preparing subgrade carriage of pipes & collars and other necessary materials including supply and carriage of sand and cement of site, but excluding cost supply of pipe. (d)300 mm dia. |
| 57 | Construction of Name plate. Length of Name plate - 1.4 m, Height of Name plate - 0.6 m, Thickness of Name plate - 0.25 m |
| 58 | Brickwork with1st class bricks in cement mortar (1:4) .(a) In foundation & Plinth |
| 59 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out jointsincluding throating, nosing and drip course, scaffolding /staging wherenecessary( ground floor).[excluding cost of chipping over concrete surface](ii) with (1:4) cement mortar. (b)15mm thick |
| 60 | Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 61 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using approved putty etc. on the surface if necessary: (a) On timber or plastered surface With super gloss (hi-gloss) - (iv) Two coats (with any shade except white) |
| 62 | Painting block letters or digits in Black Japan or any approved paint as per direction. (e) Size above 7.5 cm. and upto 10 cm. |
| 63 | Add GST @ 18% on sum of Item No. 1.01 to 7.05 |
| 64 | Add Labour Cess @ 1% on sum of Item No. 1.01 to 8 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender