Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #45232287

Tender For Rectification Of Defects On Risk And Cost Of M/S Rcc Infra Ventures Pvt Ltd Under Ca No Cewac/Amb-23/2018-19 Under Ge (P)(Af) Ambala

Issued by Statutory Bodies & Commissions/Committees · ambala, Haryana
Tender Value
15.46 Lakhs
Estimated cost
Bid Submission
17 Oct 2024
0 days left
EMD
30920
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
ambala → Haryana
EMD Exemption
Not Available
Quantity
Not Available

Project Description

RECTIFICATION OF DEFECTS ON RISK AND COST OF M/S RCC INFRA VENTURES PVT LTD UNDER CA NO CEWAC/AMB-23/2018-19 UNDER GE (P)(AF) AMBALA- 1 Cleaning and Removal :-M&L for cleaning and removal of all loose material if any laying on surface mechanically by suitable cleaning eqpt as per site requirement.Repairing and Surface Preparation :-Repairing of damaged areas, doing reviting and changing old screws whereever reqd to fix the sheets in actual position, removing rust if found anywhere and treated properly with rust removing chemicals and convertors.Filling overlap of panel gaps with highly flexible PU sealant/Tar Plastic sealant, whrereever sheets are very weak to be found after joint inspection.Tarfelt APP with release film cold applied performed membrane 1 mtr 8 x 20 mtr :-Apply APP synthetic rubberised adhesive on prepared surface at the rate of 3 Sqm per K brush/Roller.Allow the adhesive solvent to evaporate.When the adhesive layer becomes tack free start pasting/fixing.Tarfelt APP non woven polyster based pliable membrane after removing its reease film by roller/Towel with presurebly cutting 3 Sqm sheet from roll.Maintain overlap of 4-Tarfelt APP sheet overlap while pasting Tarfelt APP membrane on sheet metal surface. Please nte on overlaps of sheet metal profile and particularly at Ridge Areas double layer superimposed Trafelt sheets with 150 mm width to be used for better waterproofing membrane shall be finally coated with two coats of aluminium point for non traficalbe roof & for giving heat reflective coating to reduce some temperature inside also all as per manufacturers complete all as specified and directed. 2 Racking out of old existing sealant compound, back up rod and filler board of the existing joints by special tools like racker/cutting blades/machines, widening of joints by 2mm by using joint cutting blades of appropriate size straight and smooth edges. Joint cleaned throughly with application of compressed air, Joint shall be made dry, vacum cleaned and freed of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the filler board and pouring the sealant. thereafter filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified, over it filled with closed cell, medium density, corss linked plyethyene foam backup rod of 30 mm dia for complete ength of the joint. Finally filled with polyurethene joint sealant meeting the requirements mentioned in BS-5212, BS4254 and EN-141875-2003 with minimum movement accommodation factor MAF of +/-30% complete all as specified and directed. 3 M&L for Non - skid coloured Ceramic tiles 7 to 8 mm thick of size 300mm x 300 mm, jointless as in floors set and jointed in neat cement slurry and pointed in coloured cement to match complete all specified and directed. 4 M&L for glazed ceramic tiles in vertical surface 350x250x7mm thick set and jointed in neat cement slurry and pointed in coloured cement to match, complete all as specified and directed. 5 M&L for repair of bubble in PU flooring in Maint Hangar and PBL hangar surface preparation, 6mm EPU ESD flooring system consists of primer, screed copper tape conductive primer.ESD EPU top coat and application of joint filling with polyurethane sealant in construction, dummy and expansion joint with same colour with existing flooring, complete all as specified and directed. 6 Taking down unservieable corroded earthing complete with copper earth electrode 17.2 mm dia of length 10 ft including all accessories complete. 7 Taking down corroded earth continuity GIAluminium/copper strip fixed to wall on batten or any other indicated situation with porcelain vitreous white seperators complete. 8 Material and labour for reconditioning of chemical earthing with earth electrode 17.2 mm dia copper cladded rod with 250 micron of copper cladding. The length is 10 ft (option of two pcs 05 ft each with a coupler is availabe). The copper setion of rod will have a strip of 25x2 mm 200 mm brazed just 150 mm below the top. This will have two holes of 9 mm on each side four strip of 25x2 mm 1.5 mtr length are provided with each rod is supported with two bag of 25 kg each ASEM CB is recommended for use in sandy/rocky soil. A poly-plastic pit cover is provided with one system, in places where the deep digging is cost prohibitive the electrodes can be mounted plate is pre-fixed with top section for load calculation and to achieve the result less than 01 Ohm on completion of job. 9 M&L for porcelain vitreous white seperators and fixiing screws etc to be refixing alongwith the pole and wall with existing copper strip all as specified and directed. 10 M&L for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or ixed to poles or any other indicated situation for loop earthing incluing porcelain vitreous white sperators and fixing screws with brazing at each possible joint etc. as required 20x3 mm copper strip complete al as specified and directed. 11 S&F sheet metal enclousers suitable for MCCB, TPN, 08 ways with 200 Amps rated bus bar, 415 volts double door type complete all as specified and directed. 12 For Credit Schedule refer tender documents. The amount of credit schedule shall be deducted from total quoted amount of BOQ to arrive contract sum.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 27-Sep-2024 GE(P)(AF)/AMB-02/2024-25 Date Date 10-Oct-2024
2 01-Oct-2024 BOQ BOQ 10-Oct-2024
3 10-Oct-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 17-Oct-2024

BOQ

NAME OF WORK : RECTIFICATION OF DEFECTS ON RISK AND COST OF M/S RCC INFRA VENTURES PVT LTD UNDER CA NO CEWAC/AMB-23/2018-19 UNDER GE (P)(AF) AMBALA
Sl. No. Item Description
1Cleaning and Removal :-M&L for cleaning and removal of all loose material if any laying on surface mechanically by suitable cleaning eqpt as per site requirement.Repairing and Surface Preparation :-Repairing of damaged areas, doing reviting and changing old screws whereever reqd to fix the sheets in actual position, removing rust if found anywhere and treated properly with rust removing chemicals and convertors.Filling overlap of panel gaps with highly flexible PU sealant/Tar Plastic sealant, whrereever sheets are very weak to be found after joint inspection.Tarfelt APP with release film cold applied performed membrane 1 mtr 8 x 20 mtr :-Apply APP synthetic rubberised adhesive on prepared surface at the rate of 3 Sqm per K brush/Roller.Allow the adhesive solvent to evaporate.When the adhesive layer becomes tack free start pasting/fixing.Tarfelt APP non woven polyster based pliable membrane after removing its reease film by roller/Towel with presurebly cutting 3 Sqm sheet from roll.Maintain overlap of 4-Tarfelt APP sheet overlap while pasting Tarfelt APP membrane on sheet metal surface. Please nte on overlaps of sheet metal profile and particularly at Ridge Areas double layer superimposed Trafelt sheets with 150 mm width to be used for better waterproofing membrane shall be finally coated with two coats of aluminium point for non traficalbe roof & for giving heat reflective coating to reduce some temperature inside also all as per manufacturers complete all as specified and directed.
2Racking out of old existing sealant compound, back up rod and filler board of the existing joints by special tools like racker/cutting blades/machines, widening of joints by 2mm by using joint cutting blades of appropriate size straight and smooth edges. Joint cleaned throughly with application of compressed air, Joint shall be made dry, vacum cleaned and freed of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the filler board and pouring the sealant. thereafter filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified, over it filled with closed cell, medium density, corss linked plyethyene foam backup rod of 30 mm dia for complete ength of the joint. Finally filled with polyurethene joint sealant meeting the requirements mentioned in BS-5212, BS4254 and EN-141875-2003 with minimum movement accommodation factor MAF of +/-30% complete all as specified and directed.
3M&L for Non - skid coloured Ceramic tiles 7 to 8 mm thick of size 300mm x 300 mm, jointless as in floors set and jointed in neat cement slurry and pointed in coloured cement to match complete all specified and directed.
4M&L for glazed ceramic tiles in vertical surface 350x250x7mm thick set and jointed in neat cement slurry and pointed in coloured cement to match, complete all as specified and directed.
5M&L for repair of bubble in PU flooring in Maint Hangar and PBL hangar surface preparation, 6mm EPU ESD flooring system consists of primer, screed copper tape conductive primer.ESD EPU top coat and application of joint filling with polyurethane sealant in construction, dummy and expansion joint with same colour with existing flooring, complete all as specified and directed.
6Taking down unservieable corroded earthing complete with copper earth electrode 17.2 mm dia of length 10 ft including all accessories complete.
7Taking down corroded earth continuity GIAluminium/copper strip fixed to wall on batten or any other indicated situation with porcelain vitreous white seperators complete.
8Material and labour for reconditioning of chemical earthing with earth electrode 17.2 mm dia copper cladded rod with 250 micron of copper cladding. The length is 10 ft (option of two pcs 05 ft each with a coupler is availabe). The copper setion of rod will have a strip of 25x2 mm 200 mm brazed just 150 mm below the top. This will have two holes of 9 mm on each side four strip of 25x2 mm 1.5 mtr length are provided with each rod is supported with two bag of 25 kg each ASEM CB is recommended for use in sandy/rocky soil. A poly-plastic pit cover is provided with one system, in places where the deep digging is cost prohibitive the electrodes can be mounted plate is pre-fixed with top section for load calculation and to achieve the result less than 01 Ohm on completion of job.
9M&L for porcelain vitreous white seperators and fixiing screws etc to be refixing alongwith the pole and wall with existing copper strip all as specified and directed.
10M&L for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or ixed to poles or any other indicated situation for loop earthing incluing porcelain vitreous white sperators and fixing screws with brazing at each possible joint etc. as required 20x3 mm copper strip complete al as specified and directed.
11S&F sheet metal enclousers suitable for MCCB, TPN, 08 ways with 200 Amps rated bus bar, 415 volts double door type complete all as specified and directed.
12For Credit Schedule refer tender documents. The amount of credit schedule shall be deducted from total quoted amount of BOQ to arrive contract sum.

AI Tender Summary

OUR REF NO 45232287
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 15.46 Lakhs
LAST DATE 17-10-2024
Authority
Authority Name Military Engineer Services
Work Description RECTIFICATION OF DEFECTS ON RISK AND COST OF M/S RCC INFRA VENTURES PVT LTD UNDER CA NO CEWAC/AMB-23/2018-19 UNDER GE (P)(AF) AMBALA- 1 Cleaning and Removal :-M&L for cleaning and removal of all loose material if any laying on surface mechanically by suitable cleaning eqpt as per site requirement.Repairing and Surface Preparation :-Repairing of damaged areas, doing reviting and changing old screws whereever reqd to fix the sheets in actual position, removing rust if found anywhere and treated properly with rust removing chemicals and convertors.Filling overlap of panel gaps with highly flexible PU sealant/Tar Plastic sealant, whrereever sheets are very weak to be found after joint inspection.Tarfelt APP with release film cold applied performed membrane 1 mtr 8 x 20 mtr :-Apply APP synthetic rubberised adhesive on prepared surface at the rate of 3 Sqm per K brush/Roller.Allow the adhesive solvent to evaporate.When the adhesive layer becomes tack free start pasting/fixing.Tarfelt APP non woven polyster based pliable membrane after removing its reease film by roller/Towel with presurebly cutting 3 Sqm sheet from roll.Maintain overlap of 4-Tarfelt APP sheet overlap while pasting Tarfelt APP membrane on sheet metal surface. Please nte on overlaps of sheet metal profile and particularly at Ridge Areas double layer superimposed Trafelt sheets with 150 mm width to be used for better waterproofing membrane shall be finally coated with two coats of aluminium point for non traficalbe roof & for giving heat reflective coating to reduce some temperature inside also all as per manufacturers complete all as specified and directed. 2 Racking out of old existing sealant compound, back up rod and filler board of the existing joints by special tools like racker/cutting blades/machines, widening of joints by 2mm by using joint cutting blades of appropriate size straight and smooth edges. Joint cleaned throughly with application of compressed air, Joint shall be made dry, vacum cleaned and freed of dirt, oil, vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the filler board and pouring the sealant. thereafter filled with pre-molded 25 mm thick compressible polyethylene closed cell type filler board as specified, over it filled with closed cell, medium density, corss linked plyethyene foam backup rod of 30 mm dia for complete ength of the joint. Finally filled with polyurethene joint sealant meeting the requirements mentioned in BS-5212, BS4254 and EN-141875-2003 with minimum movement accommodation factor MAF of +/-30% complete all as specified and directed. 3 M&L for Non - skid coloured Ceramic tiles 7 to 8 mm thick of size 300mm x 300 mm, jointless as in floors set and jointed in neat cement slurry and pointed in coloured cement to match complete all specified and directed. 4 M&L for glazed ceramic tiles in vertical surface 350x250x7mm thick set and jointed in neat cement slurry and pointed in coloured cement to match, complete all as specified and directed. 5 M&L for repair of bubble in PU flooring in Maint Hangar and PBL hangar surface preparation, 6mm EPU ESD flooring system consists of primer, screed copper tape conductive primer.ESD EPU top coat and application of joint filling with polyurethane sealant in construction, dummy and expansion joint with same colour with existing flooring, complete all as specified and directed. 6 Taking down unservieable corroded earthing complete with copper earth electrode 17.2 mm dia of length 10 ft including all accessories complete. 7 Taking down corroded earth continuity GIAluminium/copper strip fixed to wall on batten or any other indicated situation with porcelain vitreous white seperators complete. 8 Material and labour for reconditioning of chemical earthing with earth electrode 17.2 mm dia copper cladded rod with 250 micron of copper cladding. The length is 10 ft (option of two pcs 05 ft each with a coupler is availabe). The copper setion of rod will have a strip of 25x2 mm 200 mm brazed just 150 mm below the top. This will have two holes of 9 mm on each side four strip of 25x2 mm 1.5 mtr length are provided with each rod is supported with two bag of 25 kg each ASEM CB is recommended for use in sandy/rocky soil. A poly-plastic pit cover is provided with one system, in places where the deep digging is cost prohibitive the electrodes can be mounted plate is pre-fixed with top section for load calculation and to achieve the result less than 01 Ohm on completion of job. 9 M&L for porcelain vitreous white seperators and fixiing screws etc to be refixing alongwith the pole and wall with existing copper strip all as specified and directed. 10 M&L for earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or ixed to poles or any other indicated situation for loop earthing incluing porcelain vitreous white sperators and fixing screws with brazing at each possible joint etc. as required 20x3 mm copper strip complete al as specified and directed. 11 S&F sheet metal enclousers suitable for MCCB, TPN, 08 ways with 200 Amps rated bus bar, 415 volts double door type complete all as specified and directed. 12 For Credit Schedule refer tender documents. The amount of credit schedule shall be deducted from total quoted amount of BOQ to arrive contract sum.
Basic Detail
Tender No GE(P)(AF)/AMB-02/2024-25
Bidding Type Tender
Location
City ambala
State Haryana
Key Dates
Publish Date 10 Oct 2024
Submission Date 17 Oct 2024
Open Date 23 Oct 2024
Finance
Tender Value 15.46 Lakhs
Tender Fee 500
EMD 30920
Exemption Not Available
Document List
667290e0-8944-4bdb-909e-c4a8c5cd6c6c.html
BOQ_754090.xls
Tender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 10, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 10, 2024
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 10, 2024
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 17, 2024
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 17, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 23, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

667290e0-8944-4bdb-909e-c4a8c5cd6c6c.html

xls

BOQ_754090.xls

pdf

Tender.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders