| 1 | Loading, Carriage and unloading of poles from store to work site or vice versa or from one site to another |
| 2 | Erection of Single S.T. Poleas per standard specification |
| 3 | Erection of Double pole structure by digging of pit by hydra |
| 4 | Grouting of pole with cement brick ballast and coarse sand as per standard specification. |
| 5 | Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. |
| 6 | Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paintincluding cost of Ist Class enamel paint. |
| 7 | Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications. |
| 8 | Fabrication/modification of MS Item as per requirement of site |
| 9 | Fixing of MS Channel (100x50x6 )mm 2.4 / 2.8 mtr. Long/M.S. Angle/LT Bracketand as per Required size |
| 10 | Fixing of danger board on erected poles |
| 11 | Chopping of tree branches lying in the route of existing line touching the tree branches to the phase line conductor making fault to the feeder, for 3” to 18” dia or as per requirement of site. |
| 12 | Fixing of V-Type cross arm on erected/existing double/try/four pole. |
| 13 | Excavation of ST pole (Old & Used) from ground by digging the pit or by cutting with gas cutter and its proper stacking. |
| 14 | Dismentalling of binding wire from insulators and loosening of the ACSR mixed conductor on each pole then lowering down the ACSR mixedconductor & rolling into bundles. |
| 15 | Dismentalling of 33/11 KV V-Type X-arm/M.S Channel/ Guarding Angle/LT Bracket etc. from damage pole. |
| 16 | Loading,Carriage and unloading of ACSR Dog Conductorfrom Store to Work Site or Vice-Versa. |
| 17 | Laying of ACSR Dog Conductor |
| 18 | Laying of G.I. Wire including lacing |
| 19 | Mounting of 11 KV Pin Insulator /LT Insulator |
| 20 | Mounting of 11 kV B&S type Disc Insulator |
| 21 | Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work. |
| 22 | Making of H.T. Jumpers from 3 Phase 3 Wire H.T. O.H. line for erection work. |
| 23 | Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection. |
| 24 | Fitting of Cross bracing on double pole structure and related work. |
| 25 | Fixing of stay rod and its erection and grouting by fitting of stay clamp. Stay wire and its proper binding and tightening etc. |
| 26 | Connecting of newly erected network with KESCo mains including testing, commissioning and energization of the same completely. |
| 27 | Carriage of all concerning stock materialfrom KESCo Store to site or vice-versa. |