Power Government Departments Closing in 0 days TDR #45231025

Tender For Installation/ Enhancement Of 5 Mva In Kidwai Nagar, 8 Mva In Sarvoday Nagar, And 8-10 Mva In Ratanpur Division, Kesco, Kanpur, 1 Loading Carriadge Of Stp Pole 2 Erection Of Double Pole Including All Fitting. 3 Erection Of Single Pole In

Issued by Government Departments · kanpur, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Sep 2024
0 days left
EMD
29500
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kanpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Installation/ Enhancement Of 5 Mva In Kidwai Nagar, 8 Mva In Sarvoday Nagar, And 8-10 Mva In Ratanpur Division, Kesco, Kanpur, 1 Loading Carriadge of STP Pole 2 Erection of Double pole including all fitting. 3 Erection of Single pole including all fitting. 4 Grouting of pole with cement brick ballast and coarse sand as per standard specification. 5 Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. 6 Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paintincluding cost of Ist Class enamel paint. 7 Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications. 8 Erection and grouting of Stay Rod 9 Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. 10 10/8/6 MVA, 33/11/6.6 KV T/Fwith 2 No crane &trolla 11 5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane&trolla 12 Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer. 13 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane 14 5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane 15 Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work. 16 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane 17 5/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane 18 Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking. 19 10/8/6 MVA, 33/11/6.6 KV T/F with help of 2 no of crane 20 Loading, Carriage and unloading of 33 KV VCB/OCB (including old & used) from store to work site or vice versa 21 Making Plinth of V.C.B. including cost of Civil Material 22 Erection and Grouting of 33 KV VCB Structure on Plinth 23 Erection of 33 KV VCB on erected structure with the help of Crane. 24 Wiring, Testing and commissioning of newly erected 33 KV VCB and all related work. 25 Loading, Carriage and Unloading of 33 kV single CRP from store to site and vice versa 26 Erection of 33 KV Control Relay Panel 27 Laying of control cable including all related civil work 28 Contruction of control cable trench and 33 kV cable trench as per standard specification including all material. 29 Loading, Carriage and unloading of 11 KV VCB/LT ACB from Kesco store work site or vice-versa. 30 Shifting of 11 KV VCB from unloading site to meter room/Control room. 31 Erection and grouting of 11 KV VCB in meter room/control room. 32 Wiring, Testing and commissioning of newly erected 11 KV VCB and all related work. 33 Connecting of 11 KV Cable box on newly erected 11 KV VCB after erection work. 34 Connection of earthing of 11 VCB/ S/G Panels. 35 Erection Battery and Battery Charger 36 Loading, Carriage and Unloading of 33 KV C.T/P.T. /LA from store to site and vice versa 37 Erection of O/D 33 KV PT 38 Erection of O/D 33 KV CT 39 Erection of CT/PT Junction Box 40 Erection of lighting aresstor 41 Taking out 33 KV/11 KV cable from drum/complete drum of cable from store its loading carriage and safe unloading by truck/bullock cart at site of work or vice-versa. 42 Digging of Trench for laying of 11 KV and 33 KV cable in Normal soil in size of 30 cm. wide and 1 to 1.5 meter deep. 43 Digging of Trench for laying of 11 KV and 33 KV cable in Khadanja soil in size of 30 cm. wide and 1 to 1.5 meter deep. 44 Laying of 11 KV and 33 KVXLPE cable in above digged trench covering with bricks and back filling and proper ramming up to pole 45 Making indoor/outdoor joints of 33 KV/11KV XLPE Cable where the cable is being laid. 46 Mounting of all types of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends with pipe provided by KESCo 47 Loding carriadge of isolaotor 48 Fabrication of isolator structure as per standard design. 49 Erection and grouting of Isolator structure in proper alignment and making plinth 15 Cm. above ground level with smooth finish. 50 Erection of 33 kV Line Isolator / Bus Isolator 51 Erection and welding of cable support structure with the help of welding including earthing of support in proper alignment and all related work. 52 Erection & welding of neutral support structure with the help of welding including earthing in proper alignment and all related work and fixing of flexible copper bond. 53 Earthing of T/F at two points by extending the existing M.S. Flat with main earthmate by welding. 54 Shifting of existing cable support /post insulator structure/ isolator structure and its re-installation of mention above at site. 55 Fabrication of neutral support structure with M.S. Angle and M.S. Flat. 56 Erection and grouting of neutral support structure with 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish. 57 Disconnecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. 58 Connecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. 59 Construction of power T/F plinth suitable for 5/10 MVA 33 KV T/F in size of 3 x 3 x 1.5 Mtr. Digging of pit in size of 3.5 x 3.5 x 1.2 Mtr. Of CC work at bottom in size of 3.5 x 3.5 x .15 Mtr. With ratio of 1:4:8 its proper ramming and curing thereafter brick work in size of 3 x 3 x 0.8 Mtr. with 1 : 6 CC Sand ratio, thereafter CC work on top in size of 3 x 3 x .25 Mtr. thereafter plastering all around the open portion, grouting of rail and M.S. Angle in top CC work and its proper curing. 60 Mounting of 11 KV Pin Insulator /LT Insulator 61 Mounting of 11 kV B&S type Disc Insulator 62 Fitting of 3 mtr. Long 2 No. rail pole on power T/F plinth during erection of power transformer. 63 T/F Flexible copper bond 30mm vide 30 Cm long & connecting with neutral support to T/F neutral bushing & proper tightening. 64 Filling of soil in newly constructed S/S Yard 65 Leveling of Yard 66 Erection of Busbar Gantry 67 Fabrication of Busbar Gantry 68 Erection charge of lower bus bar with ACSR Panther conductor 69 Erection charge of upper bus bar with ACSR Panther conductor 70 Fabrication of various structures with MS Material 71 Erection and grouting of various M.S. Structdure 72 Laying of First class bricks after propoer ramming of soil including cost of material 73 Painting of various M.S. Structure 74 Mat/Mess Earth Work in S/S 75 80 Feet GI PIPE deep Bore Earthing of Power TF with supply of 50x6 MS Strip for newly installed Power Tf 76 Loading carriage and unloading ACSR Dog/ Panther Conductor 77 Laying of ACSR Dog conductor 78 Fixing of V-Type cross arm on erected/existing double/try/four pole. 79 Arrangement of requirment of material for wiring and testing of panels and T/Fs 80 Dismentalling of Rail Pole 81 Carriage Charge of all items not covered above

BOQ

Name of Work: < Installation/ Enhancement of5 MVA in Kidwai Nagar, 8 MVA in Sarvoday Nagar, and8-10 MVA in Ratanpur Division, Kesco, Kanpur . >
Sl. No. Item Description
1Loading Carriadge of STP Pole
2Erection of Double pole including all fitting.
3Erection of Single pole including all fitting.
4Grouting of pole with cement brick ballast and coarse sand as per standard specification.
5Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.
6Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paintincluding cost of Ist Class enamel paint.
7Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications.
8Erection and grouting of Stay Rod
9Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance.
1010/8/6 MVA, 33/11/6.6 KV T/Fwith 2 No crane &trolla
115/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane&trolla
12Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer.
1310/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane
145/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane
15Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work.
1610/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane
175/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane
18Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking.
1910/8/6 MVA, 33/11/6.6 KV T/F with help of 2 no of crane
20Loading, Carriage and unloading of 33 KV VCB/OCB (including old & used) from store to work site or vice versa
21Making Plinth of V.C.B. including cost of Civil Material
22Erection and Grouting of 33 KV VCB Structure on Plinth
23Erection of 33 KV VCB on erected structure with the help of Crane.
24Wiring, Testing and commissioning of newly erected 33 KV VCB and all related work.
25Loading, Carriage and Unloading of 33 kV single CRP from store to site and vice versa
26Erection of 33 KV Control Relay Panel
27Laying of control cable including all related civil work
28Contruction of control cable trench and 33 kV cable trench as per standard specification including all material.
29Loading, Carriage and unloading of 11 KV VCB/LT ACB from Kesco store work site or vice-versa.
30Shifting of 11 KV VCB from unloading site to meter room/Control room.
31Erection and grouting of 11 KV VCB in meter room/control room.
32Wiring, Testing and commissioning of newly erected 11 KV VCB and all related work.
33Connecting of 11 KV Cable box on newly erected 11 KV VCB after erection work.
34Connection of earthing of 11 VCB/ S/G Panels.
35Erection Battery and Battery Charger
36Loading, Carriage and Unloading of 33 KV C.T/P.T. /LA from store to site and vice versa
37Erection of O/D 33 KV PT
38Erection of O/D 33 KV CT
39Erection of CT/PT Junction Box
40Erection of lighting aresstor
41Taking out 33 KV/11 KV cable from drum/complete drum of cable from store its loading carriage and safe unloading by truck/bullock cart at site of work or vice-versa.
42Digging of Trench for laying of 11 KV and 33 KV cable in Normal soil in size of 30 cm. wide and 1 to 1.5 meter deep.
43Digging of Trench for laying of 11 KV and 33 KV cable in Khadanja soil in size of 30 cm. wide and 1 to 1.5 meter deep.
44Laying of 11 KV and 33 KVXLPE cable in above digged trench covering with bricks and back filling and proper ramming up to pole
45Making indoor/outdoor joints of 33 KV/11KV XLPE Cable where the cable is being laid.
46Mounting of all types of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends with pipe provided by KESCo
47Loding carriadge of isolaotor
48Fabrication of isolator structure as per standard design.
49Erection and grouting of Isolator structure in proper alignment and making plinth 15 Cm. above ground level with smooth finish.
50Erection of 33 kV Line Isolator / Bus Isolator
51Erection and welding of cable support structure with the help of welding including earthing of support in proper alignment and all related work.
52Erection & welding of neutral support structure with the help of welding including earthing in proper alignment and all related work and fixing of flexible copper bond.
53Earthing of T/F at two points by extending the existing M.S. Flat with main earthmate by welding.
54Shifting of existing cable support /post insulator structure/ isolator structure and its re-installation of mention above at site.
55Fabrication of neutral support structure with M.S. Angle and M.S. Flat.
56Erection and grouting of neutral support structure with 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish.
57Disconnecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection.
58Connecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection.
59Construction of power T/F plinth suitable for 5/10 MVA 33 KV T/F in size of 3 x 3 x 1.5 Mtr. Digging of pit in size of 3.5 x 3.5 x 1.2 Mtr. Of CC work at bottom in size of 3.5 x 3.5 x .15 Mtr. With ratio of 1:4:8 its proper ramming and curing thereafter brick work in size of 3 x 3 x 0.8 Mtr. with 1 : 6 CC Sand ratio, thereafter CC work on top in size of 3 x 3 x .25 Mtr. thereafter plastering all around the open portion, grouting of rail and M.S. Angle in top CC work and its proper curing.
60Mounting of 11 KV Pin Insulator /LT Insulator
61Mounting of 11 kV B&S type Disc Insulator
62Fitting of 3 mtr. Long 2 No. rail pole on power T/F plinth during erection of power transformer.
63T/F Flexible copper bond 30mm vide 30 Cm long & connecting with neutral support to T/F neutral bushing & proper tightening.
64Filling of soil in newly constructed S/S Yard
65Leveling of Yard
66Erection of Busbar Gantry
67Fabrication of Busbar Gantry
68Erection charge of lower bus bar with ACSR Panther conductor
69Erection charge of upper bus bar with ACSR Panther conductor
70Fabrication of various structures with MS Material
71Erection and grouting of various M.S. Structdure
72Laying of First class bricks after propoer ramming of soil including cost of material
73Painting of various M.S. Structure
74Mat/Mess Earth Work in S/S
7580 Feet GI PIPE deep Bore Earthing of Power TF with supply of 50x6 MS Strip for newly installed Power Tf
76Loading carriage and unloading ACSR Dog/ Panther Conductor
77Laying of ACSR Dog conductor
78Fixing of V-Type cross arm on erected/existing double/try/four pole.
79Arrangement of requirment of material for wiring and testing of panels and T/Fs
80Dismentalling of Rail Pole
81Carriage Charge of all items not covered above

AI Tender Summary

OUR REF NO 45231025
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 26-09-2024
Authority
Authority Name Kanpur Electricity Supply Co Limited
Work Description Tender For Installation/ Enhancement Of 5 Mva In Kidwai Nagar, 8 Mva In Sarvoday Nagar, And 8-10 Mva In Ratanpur Division, Kesco, Kanpur, 1 Loading Carriadge of STP Pole 2 Erection of Double pole including all fitting. 3 Erection of Single pole including all fitting. 4 Grouting of pole with cement brick ballast and coarse sand as per standard specification. 5 Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials. 6 Painting of S.T. pole with one coat of red oxide and two coats of Aluminium Paintincluding cost of Ist Class enamel paint. 7 Earthing of supports by sagging of M.S. earthing rod 20mm and connecting with earth wire and related works as per standard specifications. 8 Erection and grouting of Stay Rod 9 Loading carriage & unloading of main tank of T/F alongwith radiators &its all accessories & material of following T/F from store to site of work or worksite to store in between 20 Km. distance. 10 10/8/6 MVA, 33/11/6.6 KV T/Fwith 2 No crane &trolla 11 5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane&trolla 12 Shifting of T/F Tank Empty/filled by dragging or by crane of following running/damaged T/F from unloading point to plinth of T/F or from T/F plinth to shifting/loading point distance upto 25 meters and its placing in proper alignment on plinth of Transformer. 13 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane 14 5/4/3 MVA, 33/11/6.6 KV T/Fwith 2 No crane 15 Erection of radiators, conservator tank vent pipe and all other accessories on main tank of following T/F including oil filling and all related work. 16 10/8/6 MVA, 33/11/6.6 KV T/F with 2 No crane 17 5/4/3 MVA, 33/11/6.6 KV T/F with 2 No crane 18 Dismentalling of following power T/F including draining of T/F oil from radiators if necessary dismentalling of all accessories, as Radiators, vent pipe conservator Tank from main Tank of T/F (Either one or all) and its proper stacking. 19 10/8/6 MVA, 33/11/6.6 KV T/F with help of 2 no of crane 20 Loading, Carriage and unloading of 33 KV VCB/OCB (including old & used) from store to work site or vice versa 21 Making Plinth of V.C.B. including cost of Civil Material 22 Erection and Grouting of 33 KV VCB Structure on Plinth 23 Erection of 33 KV VCB on erected structure with the help of Crane. 24 Wiring, Testing and commissioning of newly erected 33 KV VCB and all related work. 25 Loading, Carriage and Unloading of 33 kV single CRP from store to site and vice versa 26 Erection of 33 KV Control Relay Panel 27 Laying of control cable including all related civil work 28 Contruction of control cable trench and 33 kV cable trench as per standard specification including all material. 29 Loading, Carriage and unloading of 11 KV VCB/LT ACB from Kesco store work site or vice-versa. 30 Shifting of 11 KV VCB from unloading site to meter room/Control room. 31 Erection and grouting of 11 KV VCB in meter room/control room. 32 Wiring, Testing and commissioning of newly erected 11 KV VCB and all related work. 33 Connecting of 11 KV Cable box on newly erected 11 KV VCB after erection work. 34 Connection of earthing of 11 VCB/ S/G Panels. 35 Erection Battery and Battery Charger 36 Loading, Carriage and Unloading of 33 KV C.T/P.T. /LA from store to site and vice versa 37 Erection of O/D 33 KV PT 38 Erection of O/D 33 KV CT 39 Erection of CT/PT Junction Box 40 Erection of lighting aresstor 41 Taking out 33 KV/11 KV cable from drum/complete drum of cable from store its loading carriage and safe unloading by truck/bullock cart at site of work or vice-versa. 42 Digging of Trench for laying of 11 KV and 33 KV cable in Normal soil in size of 30 cm. wide and 1 to 1.5 meter deep. 43 Digging of Trench for laying of 11 KV and 33 KV cable in Khadanja soil in size of 30 cm. wide and 1 to 1.5 meter deep. 44 Laying of 11 KV and 33 KVXLPE cable in above digged trench covering with bricks and back filling and proper ramming up to pole 45 Making indoor/outdoor joints of 33 KV/11KV XLPE Cable where the cable is being laid. 46 Mounting of all types of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends with pipe provided by KESCo 47 Loding carriadge of isolaotor 48 Fabrication of isolator structure as per standard design. 49 Erection and grouting of Isolator structure in proper alignment and making plinth 15 Cm. above ground level with smooth finish. 50 Erection of 33 kV Line Isolator / Bus Isolator 51 Erection and welding of cable support structure with the help of welding including earthing of support in proper alignment and all related work. 52 Erection & welding of neutral support structure with the help of welding including earthing in proper alignment and all related work and fixing of flexible copper bond. 53 Earthing of T/F at two points by extending the existing M.S. Flat with main earthmate by welding. 54 Shifting of existing cable support /post insulator structure/ isolator structure and its re-installation of mention above at site. 55 Fabrication of neutral support structure with M.S. Angle and M.S. Flat. 56 Erection and grouting of neutral support structure with 1 : 4 : 8 CC ratio in proper alignment and plinth 15 Cm. above ground level and smooth finish. 57 Disconnecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. 58 Connecting of control cable connection of marshalling box and T/F indication board and connection of Buchholz and all related connection. 59 Construction of power T/F plinth suitable for 5/10 MVA 33 KV T/F in size of 3 x 3 x 1.5 Mtr. Digging of pit in size of 3.5 x 3.5 x 1.2 Mtr. Of CC work at bottom in size of 3.5 x 3.5 x .15 Mtr. With ratio of 1:4:8 its proper ramming and curing thereafter brick work in size of 3 x 3 x 0.8 Mtr. with 1 : 6 CC Sand ratio, thereafter CC work on top in size of 3 x 3 x .25 Mtr. thereafter plastering all around the open portion, grouting of rail and M.S. Angle in top CC work and its proper curing. 60 Mounting of 11 KV Pin Insulator /LT Insulator 61 Mounting of 11 kV B&S type Disc Insulator 62 Fitting of 3 mtr. Long 2 No. rail pole on power T/F plinth during erection of power transformer. 63 T/F Flexible copper bond 30mm vide 30 Cm long & connecting with neutral support to T/F neutral bushing & proper tightening. 64 Filling of soil in newly constructed S/S Yard 65 Leveling of Yard 66 Erection of Busbar Gantry 67 Fabrication of Busbar Gantry 68 Erection charge of lower bus bar with ACSR Panther conductor 69 Erection charge of upper bus bar with ACSR Panther conductor 70 Fabrication of various structures with MS Material 71 Erection and grouting of various M.S. Structdure 72 Laying of First class bricks after propoer ramming of soil including cost of material 73 Painting of various M.S. Structure 74 Mat/Mess Earth Work in S/S 75 80 Feet GI PIPE deep Bore Earthing of Power TF with supply of 50x6 MS Strip for newly installed Power Tf 76 Loading carriage and unloading ACSR Dog/ Panther Conductor 77 Laying of ACSR Dog conductor 78 Fixing of V-Type cross arm on erected/existing double/try/four pole. 79 Arrangement of requirment of material for wiring and testing of panels and T/Fs 80 Dismentalling of Rail Pole 81 Carriage Charge of all items not covered above
Basic Detail
Tender No 10/Const./2024-25
Bidding Type Tender
Location
City kanpur
State Uttar Pradesh
Key Dates
Publish Date 13 Sep 2024
Submission Date 26 Sep 2024
Open Date 26 Sep 2024
Finance
Tender Value Ref. Documents
Tender Fee 3540
EMD 29500
Exemption Not Available
Document List
44173aae-e5c9-4567-9e90-56ab566704cd.html
BOQ_1659459.xls
E-Tender-10-Const.-2024-25.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 13, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 26, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 26, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

44173aae-e5c9-4567-9e90-56ab566704cd.html

xls

BOQ_1659459.xls

-2024-25

E-Tender-10-Const.-2024-25.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders