| 1 | Cleaning thick Bushes and thorny jungle without uprootingalso including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 2 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking all lead and lift of material including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 3 | Dismantling existing plaster including disposal of refuse with in distance of 60 meters. including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 4 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including alllift and lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 5 | Laying C.C.(1:3:6) with Cement, coarse sand and Stone ballast 20 to 40mm including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 6 | Laying C.C.(1:1.5:3) with Cement, coarse sand and Stone grit 6 to 12 mm size including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 7 | Random rubble masonary work in (1:4) with Cement, coarse sand and boulder including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 8 | Supplying and laying of Non-Woven Geo Textile Sheet made of 250 GSM 100% polyproplene staple fiber (continuous filament not allowed) also including all cost of material, labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 9 | Providing and laying Dry stone pitching hand packedincluding all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 10 | Class 10 /M-100 brick work in 1:5 cement and sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge. |
| 11 | Cement Plaster in 1:4 on Brick masonary with cement sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge. |
| 12 | First class/M-150 Brick flooring laid flat over 12 mm thick mortar bed 1:4 Cement mortar including preparation of base to proper slope and its ramming and including supply of all materials, labour and T&P etc. required for proper completion of the Work as per Directed by Engineer In Charge. |
| 13 | Cement pointing in 1:3 (Struck deep) on Brick masonary with cement sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge. |
| 14 | Finishing walls with Acrylic smooth exterior paint applied two coatof approved make ofrequired shade on old surface directed by Enginer-In-Charge to give even shade after throughly brushing the surface to remove all dirt and remains of loose powdered material including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 15 | Earth work in embankment by power tranported earth with all lead and lift including excavation, loading, unloading, manual compaction, dressingalso including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 16 | Brick soling with brick laid on edge straight over burnt bricks laid flat and dry including prepration of sub-grade to prescribed camber and including supply of bricks, filling joints with local earth, spreading blinding coat of 1cm(3/8\") depth of local earth of P.I. 5to7 or sand over the entire surface and also including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |
| 17 | Providing & Dumping boulder 20 to 40 kg. in scoured portion. also including all cost of labour & T&P etc. for proper completion of work as directed by Engineer in charge. |