Supply Of Stainless Steel Tubes And Double Ferrulestainless Steel Tubes And Double Ferrule,Stainless Steel Tubes And Double Ferrule Fittings For Lslrd Coaches, As P Er Drawing: Material Schedule No. Icf/Sk-10-2-671, Issue Status-01, Rev-01, Cs-01 And As Per Specification No. Icf/Md/Spec-166, Issue Status-01,Rev-04, Amd-01 & Amd​02. [ Warranty Period : 30 Months After The Date Of Delivery ] ] , Supply,Installation,Commissioning & Testing Of Stainless Steel Tubes And Double Ferrule Fittings For Lhb Hot Buffet Car & Amrit Bharat Lcbnacab Coaches, As Per Drawing: Rcf/Md/Mat Sch/Lwcbac , Ver-00 , Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Shoul D Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Stainless Steel Tubes And Double Ferrule Fittings For Lgs (Lhb-Eog-Gs) Co Aches., As Per Drawing: Icf/Sk-10-2-634, Issue Status-01,Rev-01,Cs-01 & Cs-02 As Per Icf Specifi Cation No. Icf/Md/Spec-166,Issue Status-01,Rev-04, Amd-01 & Amd-02., Packing Instruction: As Pe R Standard Packing. It Should Be Ensured That Item Should Not Rub During Transpo Rtation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Stainless Steel Tubes And Double Ferrule Fittings For Lhb Coach, As Per Dra Wing: Material Schedule No. Icf/Sk-10-2-632,Issue Status-01,Rev-01,Cs-01,Cs-02,Cs-03,Cs0​ 4 & Cs-05 And As Per Icf Specification No.Icf/Md/Spec-166,Issue Status-01,Rev-04,Amd-01 & Am D-02, Packing Instruction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supplier. [ Warranty Period: 30 Months After T He Date Of Delivery ] ] => Limited