Operation And Maintenance Of Package Acs, Window Acs And Split Acs At Cauvery Basin Refinery, Cbr Township, Muttam Terminal And Muttam Township For Cpcls Cbr Project In Nagapattinam , Operation And Maintenance Of Package Air-Conditioning And Split Air-Conditioning Plants 5.0 Tr And Above As Detailed In The Scope Of Work, Specification And Terms & Conditions In The Bid Document For First Year , Operation And Maintenance Of 4 X 22 Tr Capacity Package Air-Conditioning Plants At Administration Building As Per Scope Of Work - First Year , Operation And Maintenance Of 3 X 7.5 Tr Capacity Package Air-Conditioning Plants At Oms Control Room As Per Scope Of Work - First Year , Operation And Maintenance Of Package Air-Conditioning And Split Air-Conditioning Plants 5.0 Tr And Above As Detailed In The Scope Of Work, Specification And Terms & Conditions In The Bid Document For Second Year , Operation And Maintenance Of 4 X 22 Tr Capacity Package Air-Conditioning Plants At Administration Building As Per Scope Of Work - Second Year , Operation And Maintenance Of 3 X 7.5 Tr Capacity Package Air-Conditioning Plants At Oms Control Room As Per Scope Of Work - Second Year , Maintenance Of Window & Split Acs , Routine, Regular And Breakdown Maintenance Of Wac, Sac, Wc And Cold Storage Of Different Make & Different Capacities. Installed At Various Location Of Refinery Premises, Refinery Township & Air Monitoring Station. Job Includes Attending The Complaints Of Machines As Per The Complaint Register And Instruction Of Site Engineer. Job Includes Checking Of Machines, Identification Of Defect, Repair/Replacement Of Defective Component. Rewinding Of Blower Motor. Replacement Of Thermostat, Blower, Fan Blade, Electrical Switches, Control Knob, Wires. Cleaning Of Air Filter, Removal Of Dust From Cooling Coil & Condenser By Removing The Machine From Location If Required. Attending The Minor/Major Leakage Of Refrigerant Gas R-22/R-12 Arresting The Leak And Recharging The Gas. Repair/Replacement Of Defective Bush/Bearing Of Blower Motor Including Lubrication Of Blower Motor, Tightening Of All The Electrical Connection. Repair/Replacement (By Repaired Compressor) Of Defective Compressor. Job Includes Dismantling Of Defective Compressor Either At Site Or At Workshop After Transportation Of Machine To Workshop, Taking Necessary Gate Pass/Permission From Concerned Authority. , Overhauling And Painting Of Wac, Sac, Wc & Cold Storage Of Different Make & Different Capacities Located At Various Location Within The Refinery Premises, Refinery Township And Iocl Muttam, Job Includes Removal Of Machines From Location, Dismantling, Cleaning, Ashing, Chemical Cleaning Of Condenser & Cooling Coil, Overhauling, Lubrication Of Blower Motor, Checking, Repair/Rectification/Replacement Of Effective Control Component. Painting Of All Metal Part And Chassis Cover Internal Painting With Primer & Outer Painting With Synthetic Enamel Paint. Cleaning Of Coil & Condenser To Be Done With Wire Brush. Defective/Damage Insulation To Be Replaced. All The Electrical Wires Must Be Dressed Properly. Defective Wires To Be Replaced Including Supply Of Wires. Defective/Damage Asbestos Sheet To Be Replaced. Asbestos Sheet Shall Be Provided By The Owner.Cleaning/Replacement Of Filter By Nylon Filter. Re-Assembly Of Machine, Shifting To Location & Testing Of Machine. Job Complete In All Respectdefective Compressor Either At Site Or At Workshop After Transportation Of Machine To Workshop. , Supply & Fixing Of Plywood Sheet In Wac Opening , Supply, Fixing, Gas Charging, Testing And Commissioning Of Following Condenser Or Cooling Coils Suitable For Different Make & Different Capacity Window Air Conditioner. Job Includes Dismantling Of Old Damaged Condenser/Cooling Coil, Supply & Fixing New Condenser/Cooling Coil, Gas Charging, Testing & Commissioning. Job Complete In All Respect With Men & Material Including Refrigerant Gas R-22 And As Per Direction And Instruction Of Site Engineer/Engineer In-Charge. Note : Old Damaged Condenser/Cooling Coil Shall Be Retained By The Department. , Replacement Of Condenser Coil Complete , Replacement Of Cooling Coil Complete , Supply Of Plywood Sheet 4Mm Thick, Cutting To Required Size For Covering The Wac Opening Of Different Make And Fixing With Nails. Job Complete With Men & Material And As Per Direction & Instruction Of The Engineer-In-Charge. , Supply, Fixing, Cutting, Threading Of Gi Pipe Of Following Dia Including Bend, Elbow, Union, For Fixing In Window And Split Acs. Job Complete In All Respect Including Men & Machine & As Per Instruction Of Engineer-In-Charge. , 15 Mm Dia. Nominal Bore , 20 Mm Dia. Nominal Bore , 25 Mm Dia. Nominal Bore , Servicing Of Pcb Board For Window And Split Air Conditioner (1.5 Tr / 2.0 Tr) , Supply And Replacement Of Rotary Compressor For 1.5 Tr Window Air Conditioner , Leak Arresting And Gas Charging Of 1.5 Tr Window Air Conditioner , Leak Arresting And Gas Charging Of 1.5 / 2.0 Tr Split Air Conditioner , Supply And Replacement Of Rotary Compressor For 2.0 Tr Split Air Conditioner , Shifting Of Split Air Conditioner From One Location To Other Location (Dismantling, Installation And Commissioning Including All Accessories Like Copper Pipe, Insulation Foam, Etc.)