|
| 1 | Servicing and Maint of Central Heating System( Oil fired hot glycol based generator) formaintaining inside condition suitable for human comfort includingmaint work such as Disconnecting, dismantling and Strip opening of the plant for repair, de-carbonising and cleaning internally with wire brush and arresting for any leakage by gas welding, spare parts reqd if any cleaning the exhaust pipe, taking out the broken nut bolts and reassembling the plant and testing completefor the following capacity ofplants :-(a) Hot water generator 2.5 lakh K Cal/hr at CMIR Model : WHW-100,Make : Rapidtherm- Set of 3 NosNote : (i)The above quoted rates are also deemed to be included the cost of skilled technician from reputed company andfor repair to major parts ,replacement of minor parts such as filters,nut bolts, control panel with conventional controls, indication lamps, for smooth functioning of oil fired hot glycol generators. |
| 2 | Disconnecting, dismantling and taking out the burner assy complete and transport of the same toauth company workshop for Servicing and Maintincl repair to burner assy and replacement of spares such asnozziles, electrodes, leakage arresting for its inlet and outlet pipes and testing,cleaningcomplete all as directed for its smooth functioning |
| 3 | M&L for insulation to 500 GItank with 13 mm closed cell electrometric insulation complete al as directed. |
| 4 | S&F metal coupling of the CHS pump 3.5HP male/female star coupling as per sample,complete all as specified and directed by Engineer-in-Charge. |
| 5 | M&L for dismantling of the hot water circulating pump motor of 3.5 HP including rewinding with suitable size/gauge of copper wire including replacement of suitable bearing warn out nuts/bolt washer and refixing of same after varnishing, complete all as specified and directed by Engineer-in-Charge. |
| 6 | Supply and fixing in replacement of Ignition transformer suitable for burner. Complete all as specifed and directed by Engineer-in-Charge. |
| 7 | Supply and fixing in replacement of Ignition lead suitable for burner . Complete all as specifed and directed by Engineer-in-Charge. |
| 8 | Supply and fixing in replacement of photo cell suitable for burner. Complete all as specifed and directed by Engineer-in-Charge. |
| 9 | Supply and fixing in replacement of igniation rod suitable for burner. Complete all as specifed and directed by Engineer-in-Charge |
| 10 | Supply and fixing in replacement of sequence controller suitable for burner. Complete all as specifed and directed by Engineer-in-Charge. |
| 11 | Supply and fixing in replacementinjector nozzles suitable for burner. Complete all as specifed and directed by Engineer-in-Charge. |
| 12 | Labour for servicing of fan coil unit of indoor units, removing dust / other remainswith suitable liquid complete all as specified and directed. |
| 13 | M&L for replacement of fuel pump suitable for 1 lakh kilo calories burner assembly complete all as specified and directed. |
| 14 | S&Fin replacement of reciprocating/rotary scroll compressor including refilling of refrigirant R-404 brazing and bring to be serviceable condition and testing suitable for chiller compressor complete all as specified and directed. |
| 15 | Supply & Fix fuel pipes as per sample for boiler .Model RTS 2.5make Rapid Therm |
| 16 | S&Fin repair of reciprocating /rotary compressor including refilling of refrigirent R-402 a, brazing and bring to be serviceable condition and testing suitable chiller compressor complete all as specified and directed. |
| 17 | S&Fin repair of reciprocating /rotary compressor including refilling of compressor Oil a, brazing and bring to be serviceable condition and testing suitable chiller compressor complete all as specified and directed. |
| 18 | M&Lfor complete rewinding ,servicing and refixing of 415 volts 50 Hz 05 to 07 HP motor and refixingdown at existing same place and testing incl required accessories i.e,nut bolts,washers etc complete all as directed. |
| 19 | M&L for repairing and cleaning of existing fuel Tank Capacity 5000 Ltr complete and directed by Engr-in-charge |
| 20 | M&L for repairing and cleaning of existing fuel Tank Capacity 1000 Ltr complete and directed by Engr-in-charge |
| 21 | Supply and fix in replacement of fuel filter 1 ltr for boiler complete and directed by Engr-in-charge. |
| 22 | Supply and fix in repair of star-delta starter for motor of capacity upto 5 HP to 7 HP 415 volt 50 Hz,3 phase complete and directed by Engr-in-charge. |
| 23 | M&L for repairing and cleaning of existing hepa filter AHU,34 TR complete and directed by Engr-in-charge |
| 24 | S&Fin replacement of reciprocating/rotary scroll compressor including refilling of refrigirant R-404 brazing and bring to be serviceable condition and testing suitable for chiller compressor complete all as specified and directed. |
| 25 | M&L for repairing and cleaning of existing 3 x chiller and Boiler checking of all system for smooth functioning to handedover to operatorcomplete and directed by Engr-in-charge.(Note-Contractor has providedqualified techenicalperson /Engr (i.e-RAC Engineer) visit to plant checkingfor smooth functioning. |
| 26 | Taking up or down GI 50 mm dia with fittings /connections, complete all as specified and as directed |
| 27 | Supply and fixing of GI 50 mm dia with fittings /connections,complete all as specified and as directed |
| 28 | Taking up or down GI 80 mm dia with fittings /connections,complete all as specified and as directed |
| 29 | Supply & Fix GI 80 mm dia with fittings /connections,complete all as specified and as directed |
| 30 | M& L Repairing demaged/broken GI wall pipe of size 80/100mm bore dia including loose collar ,clamp joint required to repairs the demaged/broken pipe to stop the leakage including necessary as per site requirement ,complete all as sepecified and as directed. |
| 31 | Taking out unserviceable pressure gauge & supply and fix pressure gauge with nipple 0-14 kgs rating complete all as specified and as directed . |
| 32 | Routine repair maintenance & Servicing of CENTRAL REVERSE OSMOSIS WATER TREATMENT PLANT Complete with Electrical / Control Panels and all connected Gadgets / Devices including Routine Checking of Metering Equipments like Voltmeter, Ammeter, Flow Meter, Conductivity Meter (TDS Meter) PH Meter, Pressure Meter etc. including removal/replacement of defective parts having capacity of delivering Pure, Safe and Healthy Drinking Water 5000 Ltr/Hr by removing dissolved Solids like Calcium, Magnesium, Sodium Bicarbonate, Chlorides, Sulphides, etc. in Water by 90-95% and reducing Harmful Minerals like Arsenic, Fluorides, Lead, Bacteria, etc. and bring Water Hardness Level to Safe Drinking Water Limits, Skid Mounted type alongwith Routine maintenance ofRO Water Supply Pumping Set 3.0 HP capacity Each, complete all as specified and as directed :- NOTE :-(a) The Contractor shall engage One Experienced Technician who will visit at an interval of EVERY 30 DAYS and/or as and when required/directed by the Engineer-in-Charge to examine and repair maint of complete Plant.The Technician will report to the JE E/M and Engineer-in-Charge for his Every Visit, failing which no Payment will be allowed to the Contractor.(b) The Plant shall not remain Non Operation more than 8 HOURS in any case either due to Break down or Maintenance otherwise a recovery @ Rs. 300.00 PER HOUR shall be charged from the Contractor beyond 8 HOURS for Non Operation of Plant.(c) The Quoted Unit Rate includes Labour Only for replacement of any type of Spares & Filters,as and when required basis.(d) The Quoted Unit Rate includes the Cost of Chemicals as recommended by Manufacturer for Flushing/Cleaning the System.(e) The Quoted Unit Rate is inclusive of Periodical Back Wash or as and when required to maintain as per the Treatment Guideline of Plant including Cleaning.(f) The Quoted Unit Rate includes the replacement of Minor Spares like Washers Nylon/ Lead, Teflon Tape, Bolt & Nuts, Gland Packing, Gasket, etc. other than specifically Priced.(g) Major Spares like Micron Filter, Membrane, MCCB, Contactors, Relays incl all electronics components will be Measured and Paid for separately. |
| 33 | Supply and fixingMicron Filter of size 4 Inch dia x 20 Inch Length with Filter capacity upto 1 micron (as approved) and Fixing-in-repairs, complete all as specified and as directed. |
| 34 | Supply and fixing UV water purifire system/steel fully automatic withwater purifire filter forCentral RO Plant (as approved)any type of filter as per site requirment and Fixing-in-repairs, complete all as specified and as directed. |
| 35 | Supply and fixing water purifire system/steel fully automatic with UV,UF ,TDS water purifire filter forCentral RO Plant (as approved) and Fixing-in-repairs, complete all as specified and as directed. |
| 36 | Removing the defective over load 9 -15A relay range relays and S&F new bi metal over load relay suitable for RO plant motor starter complete all as specified. |
| 37 | Removing the U/S single phase preventor, Supply & Fix Single phase preventor suitable for 3phase pump sets of any capacity. |
| 38 | Supply and fixing of MCCB 63 amps,3 pole,415 volt,50 Hzs,25 KA with necesssary connections with thimbles etc.includingtaking down /out unsv MCCBcomplete all as specified and as directed |
| 39 | Taking down dismantling carefully and transporation for taking electric motor 415 volts 50 Hz 3 phase motor 02 to 03 HP to workshopcomplete all as specified and as directed by Engr-in -charge. |
| 40 | M&L for complete rewinding,servicing and refixing of 415 volts 50 Hz 01 to 02 HP motor and fixing down at existing same place and taking incl required accessories nut bolts washer etc complete all as specified and as directed |
| 41 | M&L for complete rewinding,servicing and refixing of 415 volts 50 Hz 03 to 05 HP motor and fixing down at existing same place and taking incl required accessories nut bolts washer etc complete all as specified and as directed |
| 42 | M&L for complete rewinding,servicing and refixing of 415 volts 50 Hz 12.5 to 15 HP motor and fixing down at existing same place and taking incl required accessories nut bolts washer etc complete all as specified and as directed |
| 43 | M&L for repairing and cleaning of existing water treatment vessel and same as materialcomplete filling in vessel and serviceable condition directed by Engr-in-charge |
| 44 | Suply and fix in replacement of star delta starter for motor of capacity upto 2 to 5 HP 415 Volt 50 Hz 3 phase complete all as specified and as directed byEngr-in-charge |
| 45 | Suply and fix in replacement of star delta starter for motor of capacity upto 12.5 to 15 HP 415 Volt 50 Hz 3 phase complete all as specified and as directed byEngr-in-charge |
| 46 | Supply and laying in replacement of HDPE (High density Polyethylene flexible pipe complete with accessories fix on wall all as specified and as directed byEngr-in-charge |
| 47 | M&L for repairing and cleaning of existing CENTRAL REVERSE OSMOSIS WATER TREATMENT PLANT and check all system for smooth functioning to handed to operatorcomplete and directed by Engr-in-charge(Note-Contractor has provided CENTRAL REVERSE OSMOSIS WATER TREATMENT PLANT qualified techenicalperson /Engr(i.e-Central RO Plant Engineer) visit to plant checkingfor smooth functioning. |
| 48 | Deduct Credit for Demolished/Dismantled material Rs (-) 12,910.00 (Minus) as listed in Schedule \"A\" Sec-II (Credit Schedule)Note :Tenderers will not quote against this item being a tentative amount, to be considered to arrive at the \"Contract Sum\". |