| 1 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., includingall incidental charges etc., complete as per standard specification . for FoundationsSS 20B |
| 2 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part M.Sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.. |
| 3 | Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).WithoutStrutting |
| 4 | With Strutting |
| 5 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. |
| 6 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M.Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete |
| 7 | SupplyingandFabrication of Steel and placing in position TMT steel Grills for RCC works as per design given including cost of steel and GI binding wire and labour charges for cutting bending tying etc etc,. Complete complying with standard specification in force and as directed by department officials.- TNDSS NO. SS 86 & 86A V,VI, VII (S6) 7,3 |
| 8 | Vibrated RCC1:1½:3 (One cement one point five sand and three aggregates) mix using 20mm gauge hard granite broken stone jellyin all RCC works connected to the work excludingshuttering , Centering and cost of Reinforcement grills butincludingcuring ,finishingetc complete with standard specification and as directed by Engineer incharge.TNDSS NO.28 V,VI S25 |