Tender For Black Topping To Pulichakadi Ad Street In Neikuppai Panchayat Km 0/0 - 0/1652.Black Topping To Pulichakadi Ad Street Mayana Salai In Neikuppai Panchayat Km 0/0 - 0/184 3.Construction Of Rcc Pipe Culvert At Annukudi Ad Theru Vaikkal In Neikuppai
Tender Overview
Project Description
Black Topping to Pulichakadi AD street in Neikuppai Panchayat Km 0/0 - 0/1652.Black Topping to Pulichakadi AD street Mayana salai in Neikuppai Panchayat Km 0/0 - 0/184 3.Construction of RCC pipe culvert at Annukudi AD theru Vaikkal in Neikuppai panchayatin Kudavasal Block in Tiruvaur District .Package No: 01/KDL/ ITPHDS /2024 - 25
BOQ
| Sl. No. | Item Description |
| 1 | 1. Black Topping to Pulichakadi AD street Km 0/0 - 0/165 |
| 2 | Picking the existing BT/WBM Surface including cost and conveyance of all materials and all labour charges |
| 3 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrainetc, complete. as per SS20 A |
| 4 | Collection and supply ofGravel from approved quarry including cost and conveyance of all materials and all labour charges to stacking to department gauge for pre measurement etc.,completeGravel |
| 5 | Providing and laying WBM 75mm compacted thickness using Grade II metal using one cubic metre of 75 – 22.40mm IRC size HBG metal with 0.24 cubic metreper 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.S.T.specification. |
| 6 | Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metreper 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.S.T.specification. |
| 7 | Providing and laying tack coat over unprimed WBM surface using 4kg of bitumen binder for 10sqm area including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat bitumen aprayer etc.,complete as per clause 503 of MOST specification. |
| 8 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type \"A\" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete |
| 9 | Provision for Name board charges |
| 10 | 2.Black Topping to Pulichakadi AD street Mayana salai Km 0/0 - 0/184 |
| 11 | Picking the existing BT/WBM Surface including cost and conveyance of all materials and all labour charges |
| 12 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrainetc, complete. as per SS20 A |
| 13 | Collection and supply ofGravel from approved quarry including cost and conveyance of all materials and all labour charges to stacking to department gauge for pre measurement etc.,completeGravel |
| 14 | Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metreper 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.S.T.specification. |
| 15 | Providing and laying tack coat over unprimed WBM surface using 4kg of bitumen binder for 10sqm area including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat bitumen aprayer etc.,complete as per clause 503 of MOST specification. |
| 16 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type \"A\" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete |
| 17 | Provision for Name board charges |
| 18 | Construction of RCC pipe culvert at Annukudi AD theru Vaikkal in Neikuppai panchayat |
| 19 | Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting suchas soft clay mixed sand as per SS 20B |
| 20 | Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for fillingas per standard speecifications |
| 21 | Cement Concrete 1:4:8 using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour and all other incidental charges |
| 22 | C.C. 1:3:6 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete |
| 23 | Supply and erecting centering and shuttering with steel materials including all labour charges etc.,complete |
| 24 | Supply and fixing of 0.600M pipe NP3 |
| 25 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for fillingetc.complete, |
| 26 | Provision for Name board charges |
| 27 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents