| 1 | 1.SUPPLY OF MATERIAL |
| 2 | 12 InchBENDs (46 Deg to 90 Deg) |
| 3 | 12 InchBENDs (10 Deg to 45 Deg |
| 4 | 2. LAYING OF OFC |
| 5 | Laying of 2No’s ducts thrugh open trench |
| 6 | BLOWING OF OFC |
| 7 | Supply & installation of Inspection chamber (fabricated or readymade) |
| 8 | 3.TEMPORARY PIPE YARD MAINTENANCE |
| 9 | Supply of stone aggregate/moorum |
| 10 | 3.1A 90mm to 45mm size stone aggregate |
| 11 | 3.1B 53mm to 22.4mm size stone aggregate |
| 12 | 3.1CStone screening 11.2mm Type B |
| 13 | 3.1DMoorum |
| 14 | Laying Spreading and compacting stone WBM |
| 15 | Excavating, supplying and filling of local earth |
| 16 | SLEEPERS,WOODEN,10x5x10 IN |
| 17 | Providing and stacking of stitched HDPE sandbag |
| 18 | Assistance for cleaning of Pipe yard |
| 19 | Hiring of Hydra/lifting equipment |
| 20 | Hiring of JCB/excavator |
| 21 | Supply of pipe end cap |
| 22 | 4.SHIFTING OF H-LINE |
| 23 | RETRIEVAL OF H LINE SEGMENT- Evacuation, Excavn, Cutting &Retrieval Evacuation, Excavation, Cutting and retrieval of underground pipeline as per procedure for evacuation, SOP in tender document and as per directions of EIC based on site requirements |
| 24 | RETRIEVAL OF H LINE SEGMENT- Hiring of lifting equipment/Excavator |
| 25 | LAYING OF H LINE SEGMENT- Laying of pipeline incl EGP |
| 26 | LAYING OF H LINE SEGMENT- Laying of pipeline & OFC by HDD |
| 27 | LAYING OF H LINE SEGMENT-Supply and installation of casing pipe & CS conduit by boring/jacking |
| 28 | LAYING OF H LINE SEGMENT-Hydrotesting and vaccume drying |
| 29 | LAYING OF H LINE SEGMENT-Repair of pipe burst during hydrostatic test |
| 30 | LAYING OF H LINE SEGMENT - Well - pointing / bore wells |
| 31 | LAYING OF H LINE SEGMENT-Supply of nitrogen for inertization |
| 32 | LAYING OF H LINE SEGMENT-Hookup & overall commissioning of pipeline |
| 33 | 5.SHIFTING OF C-LINE |
| 34 | RETRIEVAL OF C LINE SEGMENT- Evacuation, Excavn, Cutting &Retrieval Evacuation, Excavation, Cutting and retrieval of underground pipeline as per procedure for evacuation, SOP in tender document and as per directions of EIC based on site requirements |
| 35 | RETRIEVAL OF C LINE SEGMENT- Hiring of lifting equipment/Excavator |
| 36 | LAYING OF C LINE SEGMENT- Laying of pipeline incl EGP |
| 37 | LAYING OF C LINE SEGMENT- Laying of pipeline & OFC by HDD |
| 38 | LAYING OF C LINE SEGMENT-Supply and installation of casing pipe & CS conduit by boring/jacking |
| 39 | LAYING OF C LINE SEGMENT-Hydrotesting and vaccume drying |
| 40 | LAYING OF C LINE SEGMENT-Repair of pipe burst during hydrostatic test |
| 41 | LAYING OF C LINE SEGMENT - Well - pointing / bore wells |
| 42 | LAYING OF C LINE SEGMENT-Supply of nitrogen for inertization |
| 43 | LAYING OF C LINE SEGMENT-Hookup & overall commissioning of pipeline |
| 44 | 5.SHIFTING OF EIPL-LINE |
| 45 | RETRIEVAL O FEIPL LINE SEGMENT- Evacuation, Excavn, Cutting &Retrieval Evacuation, Excavation, Cutting and retrieval of underground pipeline as per procedure for evacuation, SOP in tender document and as per directions of EIC based on site requirements |
| 46 | RETRIEVAL OF EIPL LINE SEGMENT- Hiring of lifting equipment/Excavator |
| 47 | LAYING OF EIPL LINE SEGMENT- Laying of pipeline incl EGP |
| 48 | LAYING OF EIPL LINE SEGMENT- Laying of pipeline & OFC by HDD |
| 49 | LAYING OF EIPL LINE SEGMENT-Supply and installation of casing pipe & CS conduit by boring/jacking |
| 50 | LAYING OF EIPL LINE SEGMENT-Hydrotesting and vaccume drying |
| 51 | LAYING OF EIPLLINE SEGMENT-Repair of pipe burst during hydrostatic test |
| 52 | LAYING OF EIPL LINE SEGMENT - Well - pointing / bore wells |
| 53 | LAYING OF EIPL LINE SEGMENT-Supply of nitrogen for inertization |
| 54 | LAYING OF EIPL LINE SEGMENT-Hookup & overall commissioning of pipeline |