Corrigendum -1 for extension of closing date for Carrying Out Geotechnical Investigation Three phase Electric Loco Simulator project at Kazipet Telangana.
Date
20-09-2024
Name of Work:Carrying Out Geotechnical Investigation-Three phase Electric Loco Simulator project at Kazipet, Telangana.
Sl. No.
Item Description
1
Carrying out 150 mm diameter boring in all soils other than rock upto refusal strata (N>100) for depth from existing ground level upto 10 m
2
Drilling in rocks of NX size including collection of rock core samples using double tube core barrel for weathered / disintegrated / soft rock (RQD<50%) using Tungsten Carbide bit.
3
Drilling in rocks of NX size including collection of rock core samples using double tube core barrel for Hard rock (RQD>50%) using Diamond bit.
4
Conducting standard penetration test (SPT) at 1 m intervals upto 4 m depth and 1.5 m intervals thereafter or every change in stratum whichever is less, Collection of disturbed and undisturbed samples, Observation of water table and carrying out laboratory tests on undisturbed and disturbed soil samples as listed but not limited to the following:a) Bulk density and Moisture contentb) Grain size analysis (sieve & hydrometer analysis)c) Atterberg / Consistency Limits & Specific Gravityd) One dimensional Consolidation test on Clayey soile) Proctor compaction testf) Unconfined Compression testg) Triaxial Shear test (in case of cohesive & c-φ soils)h) Direct shear test (in case of cohesionless soils)i) Swell pressure and Free swell Index determination j) Vane Shear testk) Chemical analysis of Soil and Water samples (on selective samples per borehole) –pH, Chlorides and Sulphates.
5
Conducting following tests for rock samples:a) Unit weightb) Specific Gravityc) Porosity & water absorption of rock sampled) Unconfined/Uniaxial Compressive Strength (both saturated and unsaturated)e) Point load strength index test (both saturated and at in-situ water content)
6
Conducting test for soil resistivity measurement using four pole fall of potential (Wenner Method) in the vicinity of the building at specified points (1 set) at specified spacings and recommendations for the type of earthing system as per latest IS-3043 (The measurement shall be done preferably in dry condition at least 72 hours after the last rainfall).
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.