Road Transport and Highways Government Departments Closing in 0 days TDR #45148288

Tender For Construction Of Road From Mrl03-Kotto Pmgsy Road To Tungma Via Naringwa

Issued by Government Departments · East Kameng, Arunachal Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Sep 2024
0 days left
EMD
15.08 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
East Kameng → Arunachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Road From Mrl03-Kotto Pmgsy Road To Tungma Via Naringwa Setting Out , Widening, Shoulder, Gsb, Wbm- Iii Prime Coat , Tack Coat, Mss, Protection Works, Cds, Side Drain And Road Furniture

BOQ

Name of Work: - MRL03-Kotto PMGSY Road to Tungma Via Naringwa.
Sl. No. Item Description
1a. Excavation inSoil in hilly area by manual means including cutting and trimming of side slope and disposing of excavated earth with a lift upto 1.5 mtr and lead upto 20 mtr as per technical specification clause 1603.1
2b. Excavation inSoil in hilly area by mechanical means including cutting and trimming of side slope and disposing of excavated earth with a lift upto 1.5 mtr and lead upto 20 mtr as per technical specification clause 1603.1
3Providingconcrete for plain/reinforced concrete in open foundations as drawing and technical specifications clause 802,803,1202 and 1203.(i) Ordinary soil up to 3 metre depth
4(ii) Ordinary rock (not requiring blasting)
5Providingconcrete for plain/reinforced concrete in open foundations as drawing and technical specifications clause 802,803,1202 and 1203. PCC grade M15 1:3:6(Hand Mixing)
6Stone masonry work in cement morter in foundation complete excluding pointing and plaster as per drawing and technical specifications and clauses 702,704,1202and 1203.(i) Course rubble masonry ( 1st sort) In 1:4 cementmorter
7(ii) Course rubble masonry ( 2nd sort) In 1:4 cementmorter
8Providing and Laying reinforced cement concrete in superstructure as per drawing and technical specifications clause 800,1205.4 and 1205.5RCC M25(1:1.5:3)
9Providing and layingconcrete for plain/reinforced cement concrete in Superstructure as per drawing and technical specifications Clause-800,1205.4,1205.5 (1:2:4) hand mixing.
10Supplying fitting,and placing HYSD bar reinforcement in superstructure as per drawing and technical specification Clauses 1002,1010 and 1202
11Providing and laying reinforced cement concrete in Substructure as per drawing and technical specifications clauses 800,1205.4,1205.5 1:2.5:5(Hand Mixing) Abutment Capping.
12Back filing behind the Abutment, wing wall and return wall complete as per drawing and technical specifications ,clause 1204.3.8
13Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
14Granular Sub-base with Well Graded Material (Table 400.1) (i) Using naturally occuring gravels
15Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN in static roller in stages to proper grade and camber, applying and brooming, stone screening to fill-up the intersties of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405
16Providing andapplyingofprime coat with bitumen emulsion(SS-1) on prepared surface of granular base i/c clearing of base surface and spraying emulsion at the rate of 1.2 - 1.5 kg per sqm. using mechanical means as per technical specification clause 502 (high porosity).
17Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
18Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
19Construction of earthen shoulder with approved material obtained from borrow pit with all lifts and leads transforting to site spreading grading to required slopes and compacted to meet requirements
20Construction of CRM side drain 15cm thick both side wall height 0.32cm in 1:4 CM with hardstone, cc base in M10(cc 1:3:6) 15cm thick i/c inside pointing in cement morter 1:4 i/c earthwork complete as per drawing and direction of engineer incharge.i)pucca side drain U shspe.
21ii) Pucca Side drain V Shape.
22Providing and Fixing PMGSY Logo Board at starting point Providing and fixing of typical PMGSY Logo board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx260cm above G.L.),(Size of board 1x 85cmx85cmx7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved qualityready mix paint.
23Providing and Fixing Title information Board of PMGSY Project(RCC).Providing and fixing of typical PMGSY Logo board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx260cm above G.L.),(Size of board 1x 85cmx85cmx7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved qualityready mix paint
24Providing and Fixing Citizen information Board of PMGSY Project(RCC)\"A\" Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx245cm above G.L.),(Size of board 2x 90cmx80cmx7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved qualityready mix paint.
25Providing and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thickwith areanot exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
26Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone, approach transition zone, working zone and terminal transition zone with a minimum distance of 2-3 m from the edge of the carriageway. The bottom edge of the lowest sign plate to be not less than 2 m above the road level, fixed on 600 mm x 600 mm x 6 mm angle iron post, founded and installed as per approved design and drawings, removed and disposed of after completion of construction work, all as per IRC:SP:55-2001. Diversion one km ahead
27Road ahead closed
28Men at Work
29Road closed
30Stop
31Slow
32Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703.i) 5th kilometre Stone(Precast)
33ii) Ordinary kilometre Stone(Precast)
34iii) 1 km reference banchmark and working benchmark.
35iv)Reference Pillar
36Referance pillar/Back Pillar/Banchmark/job pillar as per drawing and specification.
37Routine Maintenance
38First Year
39Second Year
40Third Year
41Fourth Year
42Fifth Year
43GST
44Add GST @ 18%

AI Tender Summary

OUR REF NO 45148288
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 24-09-2024
Authority
Authority Name Pradhan Mantri Gram Sadak Yojana
Work Description Construction Of Road From Mrl03-Kotto Pmgsy Road To Tungma Via Naringwa Setting Out , Widening, Shoulder, Gsb, Wbm- Iii Prime Coat , Tack Coat, Mss, Protection Works, Cds, Side Drain And Road Furniture
Basic Detail
Tender No AR0302006
Bidding Type Tender
Location
City East Kameng
State Arunachal Pradesh
Key Dates
Publish Date 09 Sep 2024
Submission Date 24 Sep 2024
Open Date 25 Sep 2024
Finance
Tender Value Ref. Documents
Tender Fee 10000
EMD 15.08 Lakhs
Exemption Not Available
Document List
45632b16-df60-4226-a1b2-7918932393a9.html
BOQ_213520.xls
SBDTungma.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 09, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 24, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 25, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

45632b16-df60-4226-a1b2-7918932393a9.html

xls

BOQ_213520.xls

pdf

SBDTungma.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender