Name of Work:- Jal nikasee work front of Bal bhavan rain basera ward-78 Zone 01
Sl. No.
Item Description
1
Dismentling of damage cc including stacking dismental material with in 60m distence etc all comp.
2
Earth work in excavation means (hydraulic )excavator/manual means in foundation trenches are drains (not exceeding 1.5 mtr in width or 10swm on plan ), excavation soil and disposal off sarface exavated soil as directed , within lead of 50 m.including dressing of side and ramming of bottoms, lift up to 1.5 m, including getting out the all kinds of soil.
3
construction of a chamber .60x.60x.9 etc all comp.
4
Supply and fixing manhole Rcc colleretc all comp.
5
Supply and fixing manhole cover including all labor material T&P etc all comp.
6
M-150 b/w with 1:4 cement & C.sand mortar etc all comp. Super structure
7
providing and laying in cement conc Concrete 1:4:8(1 Cement4 fine sand and 8cm. gauge stone Ballast)and curing comp including cost of form work in foundation and floorsetc all comp.
8
CC with 1:2:4 cement C.sand 2cm gauge stone grit including etc all comp.
9
Cartage of earth and dismental material upto 3.00km including loading unloading etc all comp.
10
15 mm thickthick cement plaster( of neet cement of cement and marble dust on rough side 1 :4 cement c. sand for celling etc all comp.
11
construction of gully pit as per knn design .60x.60x.75 etc all comp.
12
providing and laying and fixing kerb stone drain etc all comp.
13
Disilting of nala under liqued mud under foul position etc all comp.Open nala
14
cariage of silt under bucket etc all comp.
15
RCC work with cement approved coarse sand and 20mm approved stone ballast in proportion for raft Beam, column and slab1:1.5:3 (1 cemnt 1.5 C. sand 20 mm size stone ballast) including bending binding and fixing of reinfocement in position casting cutting of wall and satisfaction of the engineer in charge but excluding cost of all material centering,shuttring cost of reinforcementetc all complete.including shuttring
16
M.S. or iron in plain work such as reinforcement concrete or reinforced brick work (when not icluding over rate ) wrought torequired shape as necessary including bending for proper complition of the work and including suply of steel its wastage bend hooks and authorized ocerlaping shall be measured up two floor two level (over all rate )
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.