|
| 1 | Earth work excavation and depositing on bank with in initial leadlift in hard gravellysoilfor foundation etc. complete. |
| 2 | PlainCementconcrete1:4:8mixusing40mmISSmetalincludingallcostandconveyance of all materials to site and all labour charges etc complete. |
| 3 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush |
| 4 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. |
| 5 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cmceter to center |
| 6 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labour charges etc., Complete.( Super Structure) |
| 7 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., |
| 8 | Plastering with cement 1:3-10mm thick includingcost and conveyance of almaterials to site and all labour charges etc complete. |
| 9 | Plastering with cement 1:5-12mm thick includingcost and conveyance of almaterials to site and all labour charges etc complete. |
| 10 | Paving the flooring with special type of flooring tiles Wax finished Quota stone(20mm thick) in CM 1:3,20mm thick |
| 11 | Dadooing walls Plain Galzed tiles of size 150x150x6mm |
| 12 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning andscrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.(The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 13 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 14 | Provision for Elastomeric paint over roof portion |
| 15 | Cost and supply of IWC |
| 16 | Cost and supply of EWC |
| 17 | Cost and supply of wash basin |
| 18 | Cost and supply of Wood plastic composite door |
| 19 | Door D1 0.75 m x 2.1m |
| 20 | Door D 1.20m x 2.10 m |
| 21 | Cost and supply of hand rail 40m dia GI |
| 22 | 110 mm dia pvc pipe |
| 23 | 110 mm dia pvc bend |
| 24 | 110mm PVC TEE |
| 25 | 500 lit HDPE tank |
| 26 | Providing Perforated Stainless Steel sheet(7.50x2.50cm) withFlat bar as border |