Housing Urban and Rular Development Government Departments Closing in 0 days TDR #45108230

Tender For To Select An Agency For Establishment& Commissioning Of Material Recovery Facility (Mrf) & Waste To Compost Plant (W2c), Athaflong, Assam

Issued by Government Departments · haflong, Assam
Tender Value
1.58 Crore
Estimated cost
Bid Submission
27 Sep 2024
0 days left
EMD
3.17 Lakhs
Bank guarantee accepted
Document Fee
4000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
haflong → Assam
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For To Select an Agency for Establishment& Commissioning of Material Recovery Facility (MRF) & Waste to Compost Plant (W2C), atHAFLONG, ASSAM

BOQ

Name of Work: To Select an Agency for Establishment& Commissioning of Material Recovery Facility (MRF) & Waste to Compost Plant (W2C), atHAFLONG, ASSAM
Sl. No. Item Description
1Construction of Shed for Composting plant and MRF (20.00m x 30.00m)
2Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.All kinds of soil
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
5Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete
6Lintels, beams, plinth beams, girders, bressumers and cantilevers
7Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources)
8Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
9Above Plinth LevelCentering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts
10Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
11Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
12Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)
13Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub
14Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
15Providing and laying in position ready mixed or site batched design mixcement concrete for reinforced cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, PortlandPozzolana / Ordinary Portland /Portland Slag cement, admixtures inrecommended proportions as per IS: 9103 to accelerate / retard settingof concrete, to improve durability and workability without impairingstrength; including pumping of concrete to site of laying, curing, carriagefor all leads; but excluding the cost of centering, shuttering, finishingand reinforcement as per direction of the engineer-in-charge; for thefollowing grades of concrete.Concrete of M30 grade with minimum cementcontent of 350 kg /cum
16Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
17Centering and shuttering including strutting, propping etc. and removal of form forSuspended floors, roofs, landings, balconies and access platform
18Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.63 mm thick with zinc coating not less than 275 gm/ m²
19Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete.0.63 mm thick with zinc coating not less than 275 gm/m²
20Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (150x150x5 mm SHS)
21Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes (SHS-50 X 50 X 5 mm)
22Construction of Shed for Windrow (14.00m x 14.00m)
23Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All Kind of soil
24Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
25Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone- III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
26Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete
27Lintels, beams, plinth beams, girders, bressumers and cantilevers
28Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
29Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
30Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts
31Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
32Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
33Brick work with common burnt clayF.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in allshapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)
34Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub
35Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
36Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/ m²
37Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumenwashers complete. 0.63 mm thick with zinc coating not less than 275 gm/m²
38Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (200x200x5 mm SHS)
39Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, includingwelding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes
40Construction of Tipping Floor (10.00m x 20.00m)
41Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
42Centering and shuttering including strutting, propping etc. and removal of form forSuspended floors, roofs, landings, balconies and access platform
43Construction of Windrow Pad (14.00m x 14.00m)
44Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
45Centering and shuttering including strutting, propping etc. and removal of form forSuspended floors, roofs, landings, balconies and access platform
46Separation room/chamber (15.00m X 4.00m)
47Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
48Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm
49Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
50GI sheet 0.8 mm thick confirming to IS 277:1992 for bottom
51Mild steel plates 2mm thick for front open lid
52Welding by gas or electric plant including transportation of plant at site etc. complete.
53Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete 50x37x1.50 mm
54Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete :100x10 mm
55Supply, installation & Commissioning of following machines/equipments -
56Conveyor Belt cum Sorting Table10m x 1m
57Feed Conveyor BeltFor material transportation to Windrow5m x 1.2m
58Conveyor BeltFor stabilized waste material transportation to 35mm Trommel7m x 1.2m
59Shredder cum Chopper700 Kg per hr capacity.
60Trommel 35mm, 16mm, 6mm5m xDia. - 2m
61Hydraulic Bailing Press Machine50Tons Capacity
62Miscellaneous
63Annual Maintenance Cost (AMC)
64AMC for the Period of (5) years for the supplied technologies, machineries, tools & equipment.
65Operation and Maintenance (O&M)
66O & M for the Period of (5) years for the entire project

AI Tender Summary

OUR REF NO 45108230
AUTHORITY Government Departments
TENDER VALUE 1.58 Crore
LAST DATE 27-09-2024
Authority
Authority Name Urban Development Department
Work Description Tender For To Select an Agency for Establishment& Commissioning of Material Recovery Facility (MRF) & Waste to Compost Plant (W2C), atHAFLONG, ASSAM
Basic Detail
Tender No XVII/1 SBM Tender/2024-25/2154-64
Bidding Type Tender
Location
City haflong
State Assam
Key Dates
Publish Date 06 Sep 2024
Submission Date 27 Sep 2024
Open Date 28 Sep 2024
Finance
Tender Value 1.58 Crore
Tender Fee 4000
EMD 3.17 Lakhs
Exemption Available
Document List
21695a8a-90f7-450f-a3c7-62468714dae4.html
BOQ_62999.xls
Tendernotice_1.pdf
Bid_document.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 06, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 27, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 28, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

21695a8a-90f7-450f-a3c7-62468714dae4.html

xls

BOQ_62999.xls

pdf

Tendernotice_1.pdf

pdf

Bid_document.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders