| 1 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification over bituminous surfaces MORTH No. 111, 112, 501, 503, 900 |
| 2 | Improvements to Riding Quality at km 3/0 - 4/6 of Kolanalli R.S - Vallipuram road |
| 3 | Bituminous Macadam Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30) transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 of MORTH Specification - Grading II (Table 500-7). MORTH No. 111, 112, 501, 505, 900 |
| 4 | Improvements to Riding Quality at km 3/0 - 4/6 of Kolanalli R.S - Vallipuram road |
| 5 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with Hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to worksite, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No.507 of MORTH Specification complete in all respects-Grading II.MORTH No. 111, 112, 501, 507, 900 |
| 6 | Improvements to Riding Quality at km 3/0 - 4/6 of Kolanalli R.S - Vallipuram road |
| 7 | Excavation for Roadway and drainageExcavation including removal and satisfactory disposal of all materias necessary for theconstructionof roadway and side drains in accordance with the specifications andthe lines, grades and cross sections shown in the drawings or as indicated by the Engineer,as per MORTH Specification Formation of Berms using carted earth with an average lead of 2Km including compation by power roller. |
| 8 | Improvements to Riding Quality at km 3/0 - 4/6 of Kolanalli R.S - Vallipuram road |
| 9 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 10 | Basic cost of value put to tender as per estimate |
| 11 | Add GST at 18% |
| 12 | Total Value put to Tender |
| 13 | Differnce Amount (Excess/Less) |
| 14 | Quoted Amount (Basic Rate Only) |
| 15 | Add GST at 18% of of Quoted Amount |
| 16 | Total Value of Quoted Amount Including 18% of GST |
| 17 | Basic cost of value put to tender as per Estimate |
| 18 | Quoted Rate in Figures (Total Value of Contract Including 18% of GST ) |