| 1 | PROCUREMENT OF MATERIALS:a) Supply of PVCpipes of nominal dia 100 mm , wall thickness 5.0mm , conforming to IS : 12818/1997(casing medium) . |
| 2 | a) Supply of PVCScreen (Ribbed) pipes of nominal dia 100 mm , wall thickness 5mm, conforming to IS : 12818/1997 . |
| 3 | DRILLING & DEVELOP[MENT(Depth of T.W - 60 mtr) : a) Drilling of bore hole of suitable diameter upto required depth by water jet system through any type of soil ncluding hire and labour charges for boring pipes, scaffolding, other tools and plants etc. and taking out the same all complete and other incidental works in this connection. The bore hole should have minimum 65 mm gap in between outside of the tube well pipe and the bore.ii) for Lowering 100 mm dia tube well |
| 4 | Labour charges for lowering of pipe, strainers, blank pipe etc. and fitting, fixing the same including cutting, threading where necessary complete including bucket washing and other incidental works in this connection.i) 100 mm dia PVC Pipe bottom plug with cutter. |
| 5 | ii) 100 mm dia ribbed screen/strainer. |
| 6 | iii)100 mm dia PVC blank pipe. |
| 7 | Supplying and filling up of the annular space between the Well Pipe and the bore hole by coarse sand including watering as necessary as per direction of the Engineer-in-Charge. |
| 8 | Supplying, fitting and fixing including supplying of suitable jointing compound for fixing in position, threading, if necessary etc. all complete. (a) 100 mm. dia. CI cutter piece upto 450 mm. long with socket. |
| 9 | b) 80/100 mm dia M.S. threaded top cap fixed in position |
| 10 | c)250 x 50 x 6 mm thick, 100 mm dia, M S Supporting clamp with 2 nos 12 mm dia 65 mm longbolts,nuts,washer,on each side. |
| 11 | h) 80 mm dia plug of approved make conforming to I.S. Specifications. |
| 12 | Washing and development by pumping with 30 cum per hour capacity pump for a period till sand free water comes out and the discharge is about 30 cum per hour, followed by final yield test; inclusive of all tools, plants and scaffolding and hire charge of centrifugal pump set and other fittings as necessary all complete |
| 13 | Labour charges for testing of 5 H.P. Pump set at site for at least 1 (one) hour including supplying necessary fuels and lubricants. |
| 14 | Charges for Mobilisation of drilling equipments, tools & plants etc and transportation of of departmental materials from any sub divisional store to work site and returning excess departmental materials if any, to the same sub divisional store after complete |
| 15 | GST @ 18% on Sum of Item No 3.00 to 9.00 |
| 16 | Cess @ 1% on Sum of Item No 3.00 to 10.00 |
| 17 | SOLAR PUMPING SYSTEM WITH 3 HP SURFACE PUMP: Solar Module: Supply, transport , installątion and commissioningof ISI marked Solar Modules as per following specification: 1. Cell: Indigenous mono crystalline silicon SPV cells2. Solar Module: Monocrystalline cell with PERC technology/ module with bifacial cell. 3. Standards: ISI marked as per IS 14286and having certification of IEC 61853(1), 61730(1&2),61710 4.ModuIes must qualify to lS 170210 (Part 1)5.Min. Efficiency: 19.5%. 6. Fill factor: More than 75% . 7. Module wattage mismatch in the SPV array: within +/- 3%8. Wattage output warranty: ShouId not be less than 90% at the end of 10 years and 80% at the end of 25 years. 9.The power output of individual PV modules used in the PV array, under STC: minimum300 Wp. Necessary test certificates also to be supplied. c)For 3 HP Off-grid Solar Water Pumping System with Monocrystalline/ Monocrystalline PERC/bifacial SPV modules - 3200-3400 Wp. ( 1 nos. 6 module str.) 335 wp per pannel. |
| 18 | Module Mounting Structure ( For1 HP, 2HP, 3HP, 5HP and 10 HP Solar Water Pumping System): Supply , transportation & installation of G.I manual tracking / Fixed structure made of MS hollow sections, pipes,plates, anglesetc as per IS:4923, IS:1161/1239, IS:1079/2062, to hold min 300 Wp SPV Moduleas perdrawing and technical specification.The steel structure is to be protected withminimum 80 micron galvanisation(hot dip) and provided with fixed arrangementor dual axis manual tracking arrangement for three timesin a day and seasonal tiltingto face the sun optimally.The approximate weight of the Module Mounting Structure given in Clause no.5.1.4 should be followed.( 350 Kg- For 1 no 6 module structure) |
| 19 | Foundation of Module Mounting Structure: Suitable and stable Reinforced Cement Concretefoundation for dual axis manual tracking SPV Modulestructure as perdrawing.For 6 module structure . |
| 20 | Power conditioning unit with enclosure :Supply , transport , installation and commissioning of Solar Power conditioning Unit consisting of following components and features:1) Variable frequency Drive with inbuilt MPPT, voltage range suitable for operatingpump-motor setof 1HP to 20 HP, detail mentioned in Cl.6.1 2) Power input : DC source for 1HP, 2HP and 3HP. 3) Power input : AC / DC source or hybrid for 5HP and above. 4) Incomer: DC MCB 2 Pole 16 amp upto 5 HP, 25 amp for 7.5HP and 10 HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-2 5) Incomer: AC MCB 4 pole 16 amp for 5.0 HP, 25 amp for 7.5HP and 10 HP, 40 amp for 15 to 20 HP as per IS/IEC 60947-2 6) Type II DC SPDof 40 KA. 7) Type II AC SPD of 40 KA for AC/ DC or Hybrid input. 8)Dual input (solar/Grid) 25 amp changeover switchfor 5HP and 7.5 HP, 40 amp for 10 HP, 63 amp for 15 to 20 HP 9)Reverse protection diode 1600 VDC with heat sink. 10) Data Logger. 11) Remote monitoring system. 12) Should have built –in EMC filters . 13)IP 65 glands for cable in and out.14)Min. IP 54 enclosure.For detail features, protections, RMS, Communication architecture, Security, Data storage, tolerance of various parameters, standards to be qualified, etc. please refer to Cl. 6.1 of technical qualification. c) For 3 HP capacity Pump motor set with DC input |
| 21 | Cable and Accessories :Supplying, fitting and fixings of UV rated Copper Cable laid insideHDPE conduit and other accessories as per followings with necessary connection with the Solar PV Module, MPPT etc.i. 4.0 Sq mm single core multi studs - 5m(for 1HP/2HP/3HP) & 20m(for 5/7.5/10/15/17.5/20 HP) ii. Lugs, HDPE Pipe, Flexible Pipe, Saddle, Cable tie etc. b) For 3 HP per structure |
| 22 | Earthing: Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:By ISI-Medium GI pipe including excavation of soil for installation of Earth Electrode and filling & ramming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc. |
| 23 | Connecting the equipments to earth busbar including S & F GI (Hot Dip) wire of 8 swg on wall/floor with staples buried inside wall/floor as required and making connection to equipments with bolts, nuts, washers, cable lugs etc. as required and mending good damages |
| 24 | a) Lighting System at Scheme: (with lighting Pole) :Dusk to dawn lighting arrangement of at 4 mts height above ground level, with Hot dip galvanised 80 mm x 50 mm , medium dutypipe, with 12 V, 15Ah 2-in-1 Lithium ion/ Ferro- Phosphate batterywith in-built7-11watt LED lamp , 50 Wp solar panel (min 19% Eff.) to cover the scheme area. The lighting system should be warranted for 5years from the date of installation. |
| 25 | b) Lightning protection (Pole mounted): Lightning protection with 3\" X 1.5\" G.I pipe of6m + 1 m height with base flange inproper RCCfoundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long GI pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 6 mm thick GI base plate at bottom incl. necessary holes etc.Earthing with 65 mm dia GI pipe (Medium) 3.0 Mts. long and 1 x 19/10 stranded GI (Hot Dip) wire (4 Mts. long), 20 mm dia x 125 mm long galvanized bolt, double nuts, double washers including socketing at both ends of stranded GI (Hot Dip) wire by crimping sockets/ thimbles and S & F65 mm dia GI pipe (ISI-Medium) protection (3 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level to an average depth of 3.65 Mts. including connection toearth electrodes with 25 X 6mm G.I strip. (Provision of one lightning protection for each scheme as per drawing) |
| 26 | Supply and installation of 3 phase AC electromotor pump-motor set with speed of 3000 r.p.m(synchronous speed) suitable for Solar applications and shall have 60 months guarantee for the following conditions including loading, unloading, transportation etc. c) 3 HP3 phase AC surface mounted Monoblock Pump-motor having discharge at required head as below: i) Surface Pump-motor set for STW, as per IS: 9079with discharge of6.50-7.14 Lps at 16 mts. total head with foot valve, required quantity of flexible suction pipe( 15m), clamps, bend, footvalve and all other accessories to complete connection of suction and delivery side . |
| 27 | Testing and commissioning of scheme after completion of all work |
| 28 | Comprehensive maintenance charges for 5 years (which cover monthly inspection, Yearly training to WUA, to attend breakdown within 3 days and to keep the scheme in operationwithout lapse of time). b) For 3 HPSurface pump. Note:1Total comprehensive maintenance charge is to be withheld in addition to Securirty Deposit.Comprehensive maintenance chargeswillbe released@ i) Rs 0.80 for 2 HP, ii) Rs.0.80 for 3 HP, iii) Rs.0.60 for 5 HP / 7.5/ 10 HP / 15HP / 17.5HP and 20 HP Submersible & Surface per Wp per year at the end of each maintenance period i.e.at the end of 1st year, 2nd year, 3rd year, 4th year& 5th year.In case the “Bidder” does not provide service during the warranty & comprehensive maintenance period, the amount so held up will beforfeited. |
| 29 | Insurance @ 2% for Item No. 12, 15, 19 and 21 for a period of 5 years. Note:2Ist year\"sInsurance charge is to be paid on production of Original Receipt of premium payment. Remaining 4 years Insurance payment is to be withheld which will be released during2nd, 3rd , 4th & 5th year on production of Original Receipt of premium payment. |
| 30 | a) Supply, fitting and Fixing ofPump-motor shed of height 0.85m(as per drawing) with Hot dip Galvanised ISA 25X25x3& 1.5mm MS sheet including foundation Base of 0.95m x 0.65m for Pump Unit ( BFS, .075mm 1:2:4 PCC, 100mm 1:1.5:3 CC) - For 2HP and 3HP surface pump. |
| 31 | Supplying, fitting and fixing including transportation of sign board for identifying the exact location of MINI RLI scheme (one at road side and other at site) the board will be made 3 mm thick MS plate of size 300 mm x 600 mm and fitted and fixed on 50 mm GI Pipe of IS 1239/90 (part-1) including cutting, welding LS and writting of both sides of Sign board. Base - Yellow, and words - Red. Both bottom end of the stands pipe will be grouted in 1:2:4 CC on a single brick flat soling. This will include one materials and labour complete as per drawing and direction of E.I.C. |
| 32 | GST @ 18% on Sum of Item No 12.00 to 26.00 |
| 33 | Cess @ 1% on Sum of Item No 12.00 to 27.00 |
| 34 | WUA THROUGH CREATION OF MASS AWARNESS AND CAPACITY BUILDING: Campaining in the command area of clustered STW Sub-projects by community workers for mass awareness, capacity building to achieve sustainability of sub-projects. Cost include wage payment to community workers, transportation, leaflet etc. |
| 35 | Demarcation of command area, selection of beneficiaries and preparation of land schedule within one cluster having CCA 6 Ha. |
| 36 | Meeting Cost for WUA formation, cost including Refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charges |
| 37 | Registration Cost for WUA under suitable act ( Society ) deed writing including registration charge, conveyance cost and opening of bank account etc. |
| 38 | Livelyhood plan / Micro plan formulation cost for minor irrigation scheme, cost including refreshment, training materials, transport local conveyance, wage payment to community worker, remuneration to resource person and incidental charge ( rate on meeting ) |
| 39 | Meeting and onsite demonstration for operation & maintenance of tubewells, water management and mode of collection of water tax, building of corpus fund etc. |
| 40 | IEC Materials ( Leaflet, poster, notebook )= 8 meetings, for SL - 30 and SL - 32 |
| 41 | Documentation Cost for activities of WUA Scheme - by still photography, report booklet etc in both hard and soft copy. |
| 42 | Impact study & monitoring of scheme by site visit of 2 Community workers during 3 years\" period |