| 1 | Material Cost |
| 2 | Supply of RCC Hume Pipe 100mm dia with required no. of collars, for road crossing(100 mm dia NP2 Pipe as per GSR 2020 (Roads) item nn 1910) |
| 3 | Supply of GI Pipe 100mm, class B for nalla crossingand for cable rising on D.P. of DTC |
| 4 | Sand for cushioning of HT underground cables.(Dimesions : - 0.2*0.4*350) |
| 5 | Supply and laying of underground cable protective cover as per specification as given below:PCC Precast cable protective cover of size 480mm x 250mm x 50mm casted by confined mold vibratory cast of concrete mix M30, having strength of 30 N/mm2 at 28 days, |
| 6 | Warning tape. |
| 7 | Supply of 1.1 KV, 3 ½ core, 95 sq.mm, Al conductor, XLPE, insulated, armoured cable(from the transformer) |
| 8 | Cable Route marker RCC Cable route marker (400 x 900 x 100mm) (as per CEE approved drawing, copy enclosed) |
| 9 | Aluminium Crimping Lugs suitable for XLPE Cables, 95 sq.mm |
| 10 | Erection Cost |
| 11 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : Hard Soil(Dimensions : - 0.9*0.4*350) for TRENCH AND RMU |
| 12 | Erection of RCC Hume Pipe 100mm dia with required no. of collars, for road crossing(100 mm dia NP2 Pipe as per GSR 2020 (Roads) item nn 1910) |
| 13 | Erection of GI Pipe 100mm, class B for nalla crossingand for cable rising on D.P. of DTC |
| 14 | Erectionand laying of underground cable protective cover as per specification as given below:PCC Precast cable protective cover of size 480mm x 250mm x 50mm casted by confined mold vibratory cast of concrete mix M30, having strength of 30 N/mm2 at 28 days, |
| 15 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge(Dimesions : - 0.7*0.4*350) |
| 16 | Disposal of earth at a distance of 3000 mts(Dimesions : - 0.2*.4*350) |
| 17 | Rubble packing with hard laterite stone under floors including watering ramming and conolidating etc. in pipeline trenches and otherfoundations complete. For LT and service cable Trench ( 0.2*0.9*0.35)i.e. 0.18 per RM |
| 18 | Erection of 1.1 KV, 3 ½ core, 95 sq.mm, Al conductor, XLPE, insulated, armoured cable(from the transformer) |
| 19 | Cable Route marker RCC Cable route marker (400 x 900 x 100mm) (as per CEE approved drawing, copy enclosed) |
| 20 | Aluminium Crimping Lugs suitable for XLPE Cables, 95 sq.mm |