| 1 | labour engazed for site clearance |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. (5.1.1+5.1.2 ) |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including\" cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement complacted volume). (5.1.10 ) |
| 4 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. (5.6.3 ) |
| 5 | P/vand lyingin position 1:1.5:3grade of reinforced cementconcrete cement ,excluding the cost of centering ,shuttering,finishing thereinforcement all work up to plinth level. (5.3.9.1 ) |
| 6 | Providing 12mm cement plaster (1:3) with 1.5 MMCementpunningclean coarse sand of F.M. 1.5 including screening, curingwithall leadsand liftsof water, scaffolding taxes and royalty all complete as per building specification and direction of E/l. (5.7.1+5.7.11) |
| 7 | providingtor steel reinforcementof 8 mm.10 mm diabars as per as per approveddesign and drawing TMTFe 500( only validfor tata tiscon,SAIL,JSPL ElectrosteelsteelsLtd Bokaro and VIJAG(RINL) (5.5.4+5.5.5 )8mm dia bars |
| 8 | 10mm dia bars |
| 9 | Providing and layingin position 1:3:6(1 cement :3coarse sand (zone-3 ) :6graded stone aggregate 40mmnominal size ) grade of cement concrete,excludingthe cost ofcentering ,shuttering ,finishing and reinforcement -all work upto plinth level .(5.1.5) |
| 10 | Providing and layingin position 1:1.5:3(1 cement :1.5 coarse sand (zone-3 ) :3graded stone aggregate 20mmnominal size ) grade of cement concrete,excludingthe cost ofcentering ,shuttering ,finishing and reinforcement -all work upto plinth level . |
| 11 | Centeringshuttering including strutting,propping and removal for foundation ,footing,basess of column ,etc for mass concrete . (5.3.17.1 ) |
| 12 | Cement + steel(lead 3 km ) |
| 13 | Sand( lead 5 km ) |
| 14 | Stone Chips( lead30 km) |
| 15 | Bricks ( lead08 km ) |
| 16 | Stone metal(lead 30 km ) |
| 17 | Signboard and photography |
| 18 | ADD GST 18% |
| 19 | ADD 1% LABOUR CESS |