Tender For Special Repair To Lt Panels At 9Brd, Provision Of Fire Alarm Repeater Panel For Satcom Fire Section 9Brd, Provn Of Fire Alarm Repeater Panel For Par At Gca Bldg And Certain Minor Works At 9Brd Afs Pune Under Ge Af Lohegaon
Tender Overview
Project Description
Special Repair To Lt Panels At 9Brd, Provision Of Fire Alarm Repeater Panel For Satcom Fire Section 9Brd, Provn Of Fire Alarm Repeater Panel For Par At Gca Bldg And Certain Minor Works At 9Brd Afs Pune Under Ge Af Lohegaon
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 16-Sep-2024 | REV CRIC DATE | Date | 23-Sep-2024 |
| 2 | 18-Sep-2024 | date rev | Date | 26-Sep-2024 |
| 3 | 21-Sep-2024 | REV BOQ | BOQ | 26-Sep-2024 |
| 4 | 26-Sep-2024 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 03-Oct-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | Taking down old LT panel and Supply install, test and commissioning of Powder coated LTpanel cubical Indoor type floor standing type compartmentalized in construction fabricated from CPRI approved manufacturer specified in particular specification and made out of 3 mm thick CRCA sheet & suitable size to accomodate all accessories / fittings, to accommodate incoming MCCB/ACB and TPN Copper bus bars , incomerand outgoing feeders .The TPN bus bars shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on DMC/epoxy insulator. Thecubicle shallhave bottom frame & dimension as required for panel & stand shall be made out of equal angle iron of size 50mm x 50mm x 6mm height 600mm. A detachable predrilled gland plate of thickness not less than 3 mm thickpowder coated should be used at thebottom for entry of armoured cableof adequate size with glands.The above panel shall be front & back openable lockable /openable by key from both side. Copper extension link shall be provided at incomer & outgoing end of MCCB of rating 63 Amps & above. The panel shall be powder coated with 7 tank process of approved thickness complete including CTs, control wiring by 1.5Sqmm Wire, including taking down of old unsv panel after disconnecting Existing cable & Reconnecting the cables to new panels including providing cable glands, lugs, nut bolts etc, grouting bolts, the panel shall comprise of following and including demolition of existing PCC foundation and making good as per existing, complete all as specified & directed by Engineer in Charge. |
| 2 | a) Copper bus bar 1200 Amps for 4 pole with manual change over switch 800 amp 4pole 415 V -01 Nosb) ACB FP 800 Amps415 Volt 50 KA,Ics =100% Icu microprocessor release Manual draw out type - 1 Nosc) MCCB TP 100 Amps - 415 Volt 16 KA,Ics =100% Icu- 1 Nos d) MCCB TP 400 Amps 415 Volt36 KA,Ics =100% Icu - 3 Nos e)MCCB TP 200 Amps 415 Volt25 KA,Ics =100% Icu - 2 Nosf) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 SetNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 3 | All as per item no 01 but with the following acessoriesa) Copper bus bar 600 Amps for 4 Poleb) MCCB FP 400 Amps 415 Volt35 KA,Ics =100% Icu - 1 Nosc) MCCB TP 200 Amps 415 Volt25 KA,Ics =100% Icu - 8 Nosd) MCCB TP 100 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nose) Change over switch 400 A , 4 pole - 1 Nos f) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 Set h)ML-2 Contactor-1 No i)Digital street light timer-01 Nosj) Auto Manual Selector switch- 01 Nos k) TPN 40 Amp connector-02 Nosl)MCB TPN 40 Amps- 1NosNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 4 | All as per item no 01 but with the following acessoriesa) Copper bus bar 1200 Amps for 4 pole with manual change over switch 800 amp 4pole 415 V -01 Nosb) ACB FP 800 Amps415 Volt 50 KA,Ics =100% Icu - 1 Nosc) MCCB TP 100 Amps - 415 Volt 16 KA,Ics =100% Icu- 2 Nos d) MCCB TP 400 Amps 415 Volt36 KA,Ics =100% Icu - 2 Nos e)MCCB TP 200 Amps 415 Volt25 KA,Ics =100% Icu - 3 Nosf) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 SetNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication.(ii) New PCC work shall be measured and paid separately. |
| 5 | All as per item no 01 but with the following acessoriesa) Copper bus bar 600 Amps for 4 Poleb) MCCB FP 400 Amps 415 Volt35 KA,Ics =100% Icu - 1 Nosc) MCCB TP 200 Amps 415 Volt25 KA,Ics =100% Icu - 7 Nos. d) MCCB TP 100 Amps 415 Volt16 KA,Ics =100% Icu - 4 Nose) Change over switch 400 A , 4 pole - 1 Nos f) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 Seth)ML-2 Contactor-1 No i)Digital street light timer-01 Nosj) Auto Manual Selector switch- 01 Nos k) TPN 40 Amp connector-02 Nosl)MCB TPN 40 Amps- 1NosNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 6 | Taking down old LT panel and Supply install, test and commissioning of Powder coated LTpanel cubical Outdoor type double door, free standing type compartmentalized in construction fabricated from CPRI approved manufacturer specified in particular specification and made out of 3 mm thick CRCA sheet & suitable size to accomodate all accessories / fittings, to accommodate incoming MCCB/ACB and TPN Copper bus bars , incomer ACB/MCCB and outgoing feeders with MCCB/MCB.The TPN bus bars shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on DMC/epoxy insulator. Thecubicle shallhavefree standing bottom frame/stand of height 700mm & dimension as required for panel & shall be made out of equal angle iron of size 50mm x 50mm x 6mm. A detachable predrilled gland plate of thickness not less than 3 mm thickpowder coated should be used at thebottom for entry of armoured cableof adequate size with glands.The above panel shall be front & back openable lockable /openable by key from both side. Copper extension link shall be provided at incomer & outgoing end of MCCB of rating 63 Amps & above. The panel shall be powder coated with 7 Tank Process of approved thickness complete including CTs, control wiring by 1.5Sqmm Wire, including taking down of old unsv panel after disconnecting Existing cable & Reconnecting the cables to new panels including providing cable glands, lugs, nut bolts etc, grouting bolts, the panel shall comprise of following and including demolition of existing PCC foundation and making good as per existing, complete all as specified & directed by Engineer in Charge. |
| 7 | All as per item no 05 but with the following acessoriesa) Copper bus bar 500 Amps for 4 Poleb) MCCB FP 250 Amps 415 Volt25 KA,Ics =100% Icu - 1 Nosc) MCCB TP 125 Amps 415 Volt16 KA,Ics =100% Icu - 2 Nos. d) MCCB TP 63 Amps 415 Volt16 KA,Ics =100% Icu - 6 Nosf) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 Set h)ML-2 Contactor-1 No i)Digital street light timer-01 Nos j) Auto Manual Selector switch- 01 Nos k) TPN 40 Amp connector-02 Nos l)MCB TPN 40 Amps- 1NosNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 8 | All as per item no 05 but with the following acessoriesa) Copper bus bar 200 Amps for 4 Poleb) MCCB FP 100 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nosc) MCB SPN 63 Amps230 Volt10 KA, - 2 Nos. d) MCCB TP 63 Amps 415 Volt16 KA,Ics =100% Icu - 2 Nosf) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 SetNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 9 | All as per item no 05 but with the following acessoriesa) Copper bus bar 400 Amps for 4 Poleb) MCCB FP 250 Amps 415 Volt25 KA,Ics =100% Icu - 1 Nosf) RYB Indicators - 1 Set Note - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 10 | All as per item no 05 but with the following acessoriesa) Copper bus bar 500 Amps for 4 Poleb) MCCB FP 320 Amps 415 Volt25 KA,Ics =100% Icu - 1 Nosf) RYB Indicators - 1 Set Note - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 11 | All as per item no 05 but with the following acessoriesa) Copper bus bar 200 Amps for 4 Poleb) MCCB FP 100 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nos c) MCCB TP 63 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nosd) MCCB TP 32 Amps 415 Volt16 KA,Ics =100% Icu - 3 Nosf) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 Set h)ML-2 Contactor-1 No i)Digital street light timer-01 Nosj) Auto Manual Selector switch- 01 Nos k) TPN 40 Amp connector-02 Nosl)MCB TPN 40 Amps- 1NosNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 12 | All as per item no 05 but with the following acessoriesa) Copper bus bar 200 Amps for 4 Poleb) MCCB FP 63 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nos c) MCB SPN 63 Amps 230 Volt10 KA - 3 Nosd) MCCB TP 32 Amps 415 Volt16 KA,Ics =100% Icu - 3 Nosf) RYB Indicators - 1 Set Note - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication.(ii) New PCC work shall be measured and paid separately. |
| 13 | All as per item no 05 but with the following acessoriesa) Copper bus bar 200 Amps for 4 Poleb) MCCB FP 100 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nosc) MCCB TP 32 Amps 415 Volt16 KA,Ics =100% Icu - 2 Nos. d) MCCB TP 63 Amps 415 Volt16 KA,Ics =100% Icu - 2 Nosf) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 SetNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 14 | All as per item no 05 but with the following acessoriesa) Copper bus bar 500 Amps for 4 Poleb) MCCB FP 250 Amps 415 Volt25 KA,Ics =100% Icu - 1 Nosc) MCCB TP 100 Amps 415 Volt16 KA,Ics =100% Icu - 4 Nos. f) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 SetNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 15 | All as per item no 05 but with the following acessoriesa) Copper bus bar 400 Amps for 4 Poleb) RYB Indicators - 1 Set Note - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 16 | All as per item no 05 but with the following acessoriesa) Copper bus bar 1200 Amps for 4 poleb) ACB FP 800 Amps415 Volt 65 KA,Ics =100% Icu microprocessor release Manual draw out type - 1 Nosc) MCCB TP 250 Amps - 415 Volt 25 KA,Ics =100% Icu- 1 Nos d) MCCB TP 400 Amps 415 Volt36 KA,Ics =100% Icu - 1 Nos e)MCCB TP 100 Amps 415 Volt16 KA,Ics =100% Icu - 4 Nos f)MCCB TP 63 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nos f)MCCB TP 32 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nosf) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 Seth)ML-2 Contactor-1 No i)Digital street light timer-01 Nosj) Auto Manual Selector switch- 01 Nos k) TPN 40 Amp connector-02 Nosl)MCB TPN 40 Amps- 1NosNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 17 | All as per item no 05 but with the following acessoriesa) Copper bus bar 200 Amps for 4 Poleb) MCCB FP 125 Amps 415 Volt16 KA,Ics =100% Icu - 1 Nos c) MCCB TP 63 Amps 415 Volt16 KA,Ics =100% Icu - 5 Nosd) MCCB TP 32 Amps 415 Volt16 KA,Ics =100% Icu - 2 Nos e)MCB SPN 63 Amps 230 Volt10 KA - 2 Nosf) RYB Indicators - 1 Set and g)Digital 3 Phase Amp Meter and Voltmeter with selector switch - 1 SetNote - (i) The lay out drawing of the panel shall be got approved by the contractor before panel fabrication. (ii) New PCC work shall be measured and paid separately. |
| 18 | M&L for earthing complete with Galvanised Iron earth plate electrode 600x 600x 3 mm buried directly in ground with top edge of the plate not less than 1.5 mtrs below normal gound level and connected to earth test point by means of copper Strip of size 32x6 mm all as specified and shown in electric plate No 3 of MES SSR Part-I 2009 including earthwork, PCC chamber, CI cover, protection and watering pipe, funnel, mesh etc all as required at site and all as directed and including taking down of old earthing materials. |
| 19 | Note: (1). 7.5 RM GIstrip in deemed to be included in quoted rates beyond 7.5 RM strip shall be measured and paid separately (2)Rate quoted by the tenderer is deemed to include salt & Charcoal upto & above 450 mm top of Copper plate. |
| 20 | S&F GI strip size 32 x 6 mmall as directed includimng welding brazing and taking down of old earthing strips as required at site |
| 21 | Excavation in trenches not exceeding 1.5 m wide but exceeding 1.5m in depth for erection of poles in any type of soil all as specified and directed by EIC at site |
| 22 | Returning filling in , excavated soil including spreading, leveling and well ramming in layers not exc 25cms each any type of soil. |
| 23 | Supply and laying HDPE DWC pipe 75mm dia SN8 on wall/ along ground/ along channel/ in trench/under roof/ along pillar or as directed complete. |
| 24 | Removing the excavated materials not exc 50mtr and depositingwhere directed at a level not exceeding 1.5 mtr above the staring point all as directed by Engr - in- Charge. |
| 25 | M&L for PCC 1:2:4 using 20 mm aggregate for Foundation for Panel including necessary foam work, grouting of panel, curing all as directed by Engr - in- Charge. |
| 26 | M&L for PCC 1:4:8 for area around panelfor Panel including necessary foam work, curing all as directed by Engr - in- Charge. |
| 27 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 10 sq mm ,4 core, 1100 Volts grade. |
| 28 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 25 sq mm ,3.5 core, 1100 Volts grade. |
| 29 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 35 sq mm ,3.5 core, 1100 Volts grade. |
| 30 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 50 sq mm ,3.5 core, 1100 Volts grade. |
| 31 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 70 sq mm ,3.5 core, 1100 Volts grade. |
| 32 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 95 sq mm ,3.5 core, 1100 Volts grade. |
| 33 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 150 sq mm ,3.5 core, 1100 Volts grade. |
| 34 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 185 sq mm ,3.5 core, 1100 Volts grade. |
| 35 | Supply, laying & testing XLPE insulated, sheathed cable galvanized steel strip or wire armoured, electric cables (Heavy duty) with stranded aluminium conductor of size 300 sq mm ,3.5 core, 1100 Volts grade. |
| 36 | Supply and fix cable jointing kit for 1.1 KVgrade cable for straight through jointcomplete with Jointing material heat Shrinktype and accessories suitable for 3 ½ / 4core XLPE, armoured, Al conductor cableof size 25 to 50 sqmm,Outdoor type |
| 37 | Supply and fix cable jointing kit for 1.1 KVgrade cable for straight through jointcomplete with Jointing material heat Shrinktype and accessories suitable for 3 ½ / 4core XLPE, armoured, Al conductor cableof size 70to 95 sqmm,Outdoor type |
| 38 | Supply and fix cable jointing kit for 1.1 KVgrade cable for straight through jointcomplete with Jointing material heat Shrinktype and accessories suitable for 3 ½ / 4core XLPE, armoured, Al conductor cableof size 120to 150 sqmm,Outdoor type |
| 39 | Supply and fix cable jointing kit for 1.1 KVgrade cable for straight through jointcomplete with Jointing material heat Shrinktype and accessories suitable for 3 ½ / 4core XLPE, armoured, Al conductor cableof size 185to 240 sqmm, Outdoor type |
| 40 | Supply and fix cable jointing kit for 1.1 KVgrade cable for straight through jointcomplete with Jointing material heat Shrinktype and accessories suitable for 3 ½ / 4core XLPE, armoured, Al conductor cableof size 300to 400 sqmm, Outdoor type |
| 41 | Supply & lay FRLS4 core 1.5 sqmm (red Colour) armoured multi stranded copper conductor heavy duty cable saddled in wall/ceiling, truss etc all as specified and directed by engineer-in-charge |
| 42 | SupplyLaying in trench & Fixing on wall/roofwith GI saddle Double wall corrugated pipe of dia 75 mm, SN 8 for cable protectioncomplete all as specifed and directed by Engineer-in-Charge |
| 43 | Supply, Installation Testing & Commissioning of Active Repeater Panel to be integrated via RS485 network card with Fire Alarm Control Panel,larger display Full colour 800 x 480 LCD with resistive touch screen and automatic back-light dimming and the status of any Fire/Fault of Integrated Fire Alarm Panels. The Panel shall have compliant with EN54-2, EN54-4 and complete all as specified and directed by Engr-in-Charge. |
| 44 | Excavation in trenches in soft/loose soil not exceeding 1.5m wide and not exceeding 1.5 metre in depth and not exceeding 10 Sqm on plan for poles, struts, stays etc. and not exceeding 1.5 m in depth and getting out complete all as specified. & direcated by Enger-in-Charge |
| 45 | Excavation in trenches in hard/dense soil not exceeding 1.5m wide and not exceeding 1.5 metre in depth and not exceeding 10 Sqm on plan for poles, struts, stays etc. and not exceeding 1.5 m in depth and getting out complete all as specified. & direcated by Enger-in-Charge |
| 46 | Excavation in trenches in disintegrated rock not exceeding 1.5m wide and not exceeding 1.5 metre in depth and not exceeding 10 Sqm on plan for poles, struts, stays etc. and not exceeding 1.5 m in depth and getting out complete all as specified. & direcated by Enger-in-Charge |
| 47 | M&L for sub mainwiring with threesingle core4 Sqmm PVC insulated FR multistrandedflexible copperconductorcable 660/1100 volts grade with and including stove enamelled steel conduit laid over the surface of structures/wall/ceilingthe cable shall be drawnin throughPVC conuitand connected to DB, equipments, connector, commonearth dolly all as specified in wall, ceiling, steel structures of buildings with necessary saddles & spacers and as directed |
| 48 | S & Fix Switch socket combination 5 Amps, 230 volt, including sunken sttel terminal box & top cover plate |
| 49 | Supply, installing and testing of Fire alarm control panel adressable fire dection and alaram type with capacity of two Loop panel with capacity from 99 detectors & 99 modules up to 200 detectors and modules per each loop,complete with all acessories and battery back up for 48 Hrs in stand by mode and 15 Minutes in alaram condition. Each loop shall support analog/addressable devices maximum capacity and have TCP/IP facility and Qwerty key pad for programming and including relay module, Control Module, Zone Module, Fault Isolator, power supply module addon modules. The panel shall be as per tech specification UL listed RS 232 communication port complete in all respect and all as specified and directed by Enger-in-Charge .Make - GE/Honeywell/Hochiki |
| 50 | Supply and fix adressable smoke Detectors Complying with and type certified to EN-45 type multisensor detector with heat and smoke combination Photoelectric / Optical with base with self built intelligence as per IS: 11360all as specified & direcated by Enger-in-Charge |
| 51 | Supply, install, testing and comissioning of adessable break glass manual call pointincluding sunken boxes, with built in monitor module will all acessories and signal indicator complete as per tech specification and shall be UL listed complete. all as specified. & direcated by Enger-in-Charge |
| 52 | Fire Alarm Sounders / Sirens Electronic type horizontal single stage continous normal operation for atleast 50 minutes with sound level 65 DB to 120 DB measured at 1.5 Mtr with sound output variation of +5 DB 1000 mtrs range with starter and all connected items all as specified. & direcated by Enger-in-Charge |
| 53 | Supply & lay FRLS4 core 1.5 sqmm (red Colour) armoured multi stranded copper conductor heavy duty cable saddled in wall/ceiling, truss etc all as specified and directed by engineer-in-charge |
| 54 | M&L for sub mainwiring with threesingle core4 Sqmm PVC insulated FR multistrandedflexible copperconductorcable 660/1100 volts grade with and including stove enamelled steel conduit laid over the surface of structures/wall/ceilingthe cable shall be drawnin throughPVC conduitand connected to DB, equipments, connector, commonearth dolly all as specified in wall, ceiling, steel structures of buildings with necessary saddles & spacers and as directed |
| 55 | S & Fix Switch socket combination 5 Amps, 230 volt, including sunken terminal box & top cover plate Complete all as speacified & direcated by Enger-in-Charge. |
| 56 | Supply & fix energy saving and environmental friendly long life exclusive innovative flood light luminaries 70 watt 230 V AC outdoor type with thermal management in multiple optics and equipped with IP66 protection, with impact and corrosion resistant with LEDs as light source and lensembedded toughened glass cover and impact resistance of IK07 and electronic driverfixed on high mast poleor any any other place as requird on site incl making all nacessary arrangement for fixing complete with MS flat iron clamps (clamp shall be 40x5 mm MS flat), nuts and bolts and washers complete all as specified and directed. (Note: cost of clamp, nut bolt etc is included in quoted rates.) |
| 57 | Supply, laying, jointing, testing and commissioning of LT under ground cable 1100 volts grade XLPE(cross linked polythene ) armoured with galvanised round steel wire or steel strip , electric power cable heavy duty, with multi stranded aluminium conductor, laid in trenches, ducts fix on walls/poles with proper size saddles and clamp laid under roads/path/ drain /colverts or enclosed in GI pipe/ fix completecable complete all as specified and directed , for following size:- 10 Sqm2 core |
| 58 | S&Fof PVC insulated 1.5 sqmm copperthree core conductor cable between cable loops box to fitting drawn through the pole complete all as specified and directed |
| 59 | Supply and fixing LT cable junction box shall be insulated and made out of polycarbonate with glass fiber reinforced and size should be not less then 260 x 210 x 116 in mm. the polycarbonate JB shall be environment friendly, recyclable, helogen & silicon free, anti acid & anti corrosive. the JB shall be rated for degree of ingress protection IP 66 in accordance with IEC 60529. The gasket material shall be polyurethane and the gasket shall be internally embedded. the JBs shall be complies with requirement of the standards IEC 60998-1, IEC 60670-22 & IEC 60670 -2-5. the JB colour according to RAL 9011. The manufacturer of JB/ Enclosure shall submit a copy of IEC certificate. for better safety the Polycarbonate encl shall be fire reterdant & self extinguishing in accordance with IEC 60695-2-11, DIN VDE 0304 Part 3, UL subject 94 for flammablity V-2. it should be tested at Glove Wire test for 960 deg. cent. The impact strength of polycarbonate enclosures/ boards i.e. the degree of protection against mechanical load shall be in accordance with EN 50298-98 for IK 08. Manufacturer should submit routine test certificate for CJB/ PJB. |
| 60 | S&F along pole PVC non metallic conduit of dia 20 mm medium grade including MS clamps and nut bolts etc for fixing along the pole complete all as specified and directed |
| 61 | Material and labour for earthing complete with galvanised iron earth plate electrode 600 mm x 600 mm x 6 mm as earthing lead buried directly in ground vertically in a pit of depth not less than 2.25 metre below ground level with the top edge of earth plate at a depth not less than 1.5 m below normal ground level, connected to and including galvanised iron earth lead wire 4 mm dia as earthing lead by means of bolts, nuts, check nuts and washers of galvanised iron or steel, and connected to earthing test point, providing charcoal and common salt all as shown in electrical plate no. 3 of SSR part I, and testing on completion including excavation and earth work in any type of soil, PCC 1:3:6 type C1 earthing chamber, precast slab 50 mm thick in cement concrete 1:2:4 type B1 reinforced with welded steel wire fabric (XPM) weight not less than 4kg/sqm, funnel with wire mesh, watering pipe of 20 mm bore medium grade GI pipe and lugs, earthing wire protected by galvanised iron or steel pipe 15 mm dia medium grade 7.5 metre long complete all as specified and as directed. |
| 62 | Supply and fix microprocessor based fire alarm repeater panel which is compatible with fire alarm control panel and able to communicate with control panel, sounder etc. including electrically connecting and testing complete all as specified and directed by Engr-In-Charge. |
| 63 | Supply, laying, electrical connecting and testing FRLS4 core 1.5 sqmm (red Colour) armoured multi stranded copper conductor heavy duty cable saddled in wall/ceiling, truss, trench etc for fire alarm system all as specified and directed by engineer-in-charge |
| 64 | Material and labour for providing point wiring with two runs of 1.5 Sqmmmulti stranded copper conductor FRLSH PVC insulated single core 1100 volts grade & with one run of 1.5 Sqmm single core multi stranded copper conductor FRLSH PVC insulated 1100 Volts grade wire for continuous earthing complete in and including PVC casing and caping with all fittings/fixture etc and opentype Plastic Enclosure( Plastic Switch Board )ISI Marked for housing switches / sockets all a specified and directed |
| 65 | (a) One light point controlled by one switch . |
| 66 | (b) One Fan point controlled by one regulator/switch. |
| 67 | (d) One 3 pin socket 5 A on independent board. |
| 68 | (e) One 3 pin socket 5 A on the same switch board. |
| 69 | Material and labour for providing point wiring with two runs of 2.5 Sqmmmulti stranded copper conductor FRLSH PVC insulated single core 1100 volts grade & with one run of 2.5 Sqmm single core copper stranded FRLSH PVCinsulated 1100 volts grade wire for continuous earthing complete in and including PVC casing and caping with all fittings / fixture etc and open type Plastic Enclosure (Plastic Switch Board)ISI markedfor housingone 15 A Switch / socketsall a specified and directed |
| 70 | M/L for sub main wiring with two runs of single core 4.0 Sq mmFRLSH PVC insulated unsheathed multi stranded copper conductor1100 V grade with colour code and one run of 4 Sq mmsingle core FRLSH PVC insulated unsheathed multi stranded copper conductor green colour cablefor continuous earthing complete in & including PVC casing & caping with all fttiing & fixtures all as directed and specified.(Note:- Three runs of 4 Sqmm copper cableincluding PVC casing & caping shall be mesured and paid as one length) |
| 71 | M/L for sub main wiring with two runs of single core 6.0Sq mmFRLSH PVC insulated unsheathed multi stranded copper conductor 1100 V grade with colour code and one run of 6.0 Sq mmsingle core FRLSH PVC insulated unsheathed multi stranded copper conductor green colour cable as earth continuity conductor drawn in& including casing & caping all as directed and specified . ( Note:- Three runs of 6 Sqmm copper cableincluding PVC casing & caping shall be measured & paid as one length ) |
| 72 | Supply and fix switch piano flush type 5 Amp one way. (ISI marked) |
| 73 | Supply and fix Socket out let , 3 pin 5 Amp (ISI marked) |
| 74 | Supply and fix switch socket combination 5 / 16 A, 2 in 1, 5 Pin, flush type.(ISI marked) |
| 75 | S/F Fan Regulator electronic step type 100 W complete as directed(ISI marked) |
| 76 | Supply and fix ceiling rose surface type bakelite / PVCthree terminal 65 x 50mm. (ISI marked) |
| 77 | S&F PVC Plug top 6 A rating 3 pin, with earth pin ISI Marked complete all as directed. |
| 78 | Supply and laying of 3 core wire PVC sheathed 1.5 sqmm multistarnded copper conductor FR, 1100 Volt grade, confirming to IS694 complete all as specified and directed. |
| 79 | Supply & fix LED tube light fitting comprising of 20 watt Aluminium T-8 LED tube rod with inbuilt driver and acessories, the tube rod shall have efficacy of 100 Lm/Watt, including providing prewired CRCA box type batten with holders for fixing LED Tube rod along withprovision of 02 no PVC square block for fixing of the fitting with necesary screws,including connecting up with three core 0.5 Sqmm flexible copper conductor cable ceiling rose to fitting terminal complete as specified and directed. |
| 80 | Supply and fixEnergy efficient recess mounted LED panel fitting 36 Watt suitable for 2x2 grid in white colour with high quality diffuser for uniform light & high Efficiency. Made from CRCA sheet, Pre-coated white color. Separate replaceable electronic driver, lumen constant of 6000K colour temperature with current electronic connections as directed. |
| 81 | Supply & fix LED street light fitting Energy saving and environmental friendly long life LED street light fittings 35 Watt made up of pressure die cast aluminium housing with high power LED as lighting source and lens embedded PC cover having IP65 protection and Impact resistance of IK07 with 10KV Built-in Surge Protection Device, Thd<10% including 20/25mm dia bracket 60cm long/ clamp 25x4 mm/ nut bolts etc. The light fittings shall be fixed on pole/bldg withcomplete all as specified. |
| 82 | S&F Vertical double door Distribution board TPN 4 way with nuetral busbarand consisting ofMCCB 4pole 100A 10KA - 1 NO complete including connecting LT cable and outgoing submain wiring etc and testing complete all as specified and directed by Engr-In-charge. (Note : Cost of MCCB 100A, 4pole, 10KA -01 Nos is included in quoted rates) |
| 83 | Supply and fix sheet metal enclosure surface mounted MCB DB double door SPN 12 way 230 V with neutral link and connecting to wiring complete all as specified and directed by Engr-In-charge. |
| 84 | Supply and fix sheet metal enclosure surface mounted MCB DB double door SPN 8 way 230 V with neutral link and connecting to wiring complete all as specified and directed by Engr-In-charge. |
| 85 | Supply and fix sheet metal enclosure surface mounted MCB DB double door SPN 4 way 230 V with neutral link andand connecting to wiring complete all as specified and directed by Engr-In-charge. |
| 86 | Supply and fix MCB SPN 240 V, 32 Amps B Curve. complete all as directed at site. |
| 87 | Supply and fix MCB SP 240 V ,6 to 32 Amps B Curve complete all as directed at site. |
| 88 | Supply and fixing in replacement of Single pole and neutral sheet metal enclosure with a two pin and earth plug and socket, one single pole 20 Amps, 240V MCBcomplaints complete all as specified and directed |
| 89 | Supply and fix wall fanAC single Phase. 230V of size 400 mm sweep complete all as specified and directed. |
| 90 | M/L for sub main wiring with two runs of single core 2.5 Sq mmFRLSH PVC insulated unsheathed multi stranded copper conductor1100 V grade with colour code and one run of 2.5 Sq mmsingle core FRLSH PVC insulated unsheathed multi stranded copper conductor green colour cablefor continuous earthing complete in & including PVC casing & caping with all fttiing & fixtures all as directed and specified.(Note:- Three runs of 2.5 Sqmm copper cableincluding PVC casing & caping and PVC Surface mounted switch board ISI Marked shall be measured and paid as one length) |
| 91 | Supply and fix switch piano flush type 15 Amps complete all as specified and directed. |
| 92 | S&FSub main wiringwith4 X 4 sqmm single core cable PVCinsulated unsheathed of copper multi strandard conductorcable , 1100 votls grade drawnin PVC casing caping and including PVC casing caping and insulated 1X 4 sqmm unsheathed multistranded FR-LS copper conductor cable for earth continuity and connected to common earth dollycomplete all as specified and directed by Engineer-in-charge. (Note:- 4 lengths of 4 Sqmm & 1 length of 4 sqmm cable and PVC casing caping will be measured as one length). |
| 93 | S&F of Sub main wiringwith 4 X 6 sqmm single core cable PVCinsulated unsheathed of copper multi strandard conductorcable , 1100 votls grade drawnin PVC casing caping and including PVC casing caping and insulated 1X 6 sqmm unsheathed multistranded FR-LS copper conductor cable for earth continuity and connected to common earth dollycomplete all as specified and directed by Engineer-in-charge. (Note:- 4 lengths of 6 Sqmm & 1 length of 6 sqmm cable and PVC casing caping will be measured as one length). |
| 94 | Taking down existing VTPN DB grouted in wall and S&F Vertical double door Distribution board TPN 8 way with busbarand consisting ofMCCB 4pole 160A 16KA - 1 NO complete including connecting LT cable and outgoing submain wiring etc and testing complete all as specified and directed by Engr-In-charge. (Note : Cost of MCCB 160A, 4pole, 16KA -01 Nos is included in quoted rates) |
| 95 | Supply and fixing in replacement of Single pole and neutral sheet metal enclosure with a two pin and earth plug and socket, one single pole 20 Amps, 240V MCBcomplaints complete all as specified and directed |
| 96 | M&L for carefully taking out existing split ACsup to 2 TRwith indoor, outdoor unit, cooling piping, stabliser, MS stand complete with proper pump down and shiftingat directed loaction etc compelte all as specified and directed by Engr in Charge |
| 97 | Installation/ Refitting of split units indoor/outdoor complete with piping, connection electric cord, drain water pipe, including refilling of Refrigerant gas all as per site requirement and incl existing MS Stand for outdoor unit fixng and core cutting in stone masonary wall if required for passing of refrigerant piping and cables etc and making good disturbed surfaces matching to existing and final testing of ACcomplete all as specified and directed by Engr-In-Charge |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender