Tender For Supply Of 5000 Nos Of Back Clamp And Stay Clamp For 9 Mtr Psc Pole
Tender Overview
Project Description
Supply Of 5000 Nos Of Back Clamp And Stay Clamp For 9 Mtr Psc Pole Supply Of 5000 Nos Of Back Clamp And 5000 Pairs Of Stay Clamp For 9 Mtr Psc Pole , Supply Of Silicagel Blue , 0.6Kva Ups , Backclamp Suitable For 9.00Mtr 300Kg Psc Pole , Stay Clamp Suitable For 9.00Mtr 300Kg Psc Pole , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25 X 0.6 X 1.83 Mtr , Lt Brass Bushing Rod 20 Mm , Lt Brass Bushing Rod 30 Mm , Ht Bushing Rod 12 Mm , Stay Pit , In Ordinary Soil [0.95 X 0.6 X 1.2M] , Semi Rocky Soil , Stay Pit In Heavy Rocky Soil Where Blasting/ Cheseling Reqiured [Specific Approval Should Be Obtained From Concerned Ee] , Erection Of Poles & Stays (Including Refilling Of Excavated Earth) , Erection Of 7.5M / 8.0M Poles [Rcc / Psc] , Erection Of 9.00M / 9.14M Rcc / Psc/Rail Pole, Tubular Pole And All Metal Poles , Stay Set , Erection Stay Set Complete , Stay Erection Without Rod And Pit , Replacement Of Stay Rod Only. (Including Stay Pit Excavation & Refilling & Erection) , Replacement Of Guy Shackle Only In Existing Stay , Erection Of Line Materials , Fixing Of Lt 1 Ph X Arm , Fixing Of Lt/Ht Ti Fitting , Fixing Of Lt 3 Ph X Arm , Fixing Of 3[1/2] V` X Arm , Fixing Of4[1/2] V` X Arm , Fixing Of 5 V X Arm , Fixing Of Tapping Channel / Guarding X Arm , Providing Of Line Spacers In Lt Lines 1 Phase , Providing Of Line Spacers In Lt Lines 3 Phase , Erection Of Ab Switch With Pt Insulator & Jumpering Complete , Erection Of Centre Rotating Switch Ab Switch Complete , Fixing Of Ht Pin Insulator / Strain Disc , 11 Kv Pin Insulator With Pin , 11 Kvstrain Disc / Polymer Disc With Hardware , 22 Kv Pin Insulator With Pin , 22 Kv Strain Disc / Polymer Disc With Hardware , 33 Kv Pin Insulator With Pin , 33 Kv Pinstrain Disc/Polymer Discwith Hardware , Fixing Of Lt Pin Insulator With Pin , Lt Shakle With Hardware , Fixing Of Aluminium Knob , Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [Including Transport Of Condutor From Road Side To Work Spot] Per Run , Upto 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Acsr 7/4.09 Mm , Above 7/4.09 Mm Acsr & Dog Conductor , Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit] , Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Throughtubes , Dp Earthing Including All Works [Double Side Earthing] , Erection Of 4Th Earth Pipe Including Earthing , Earthing Of Poles , Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub. , Replacement Of Detoriated Earth Pipe Per Location , Concreting With Mixture 1:3:6 [Including All Materials]. , Mass Concreting For Centre Support For 2 Feet Including All Materials , Mass Concreting For Pole0.6X0.6X1.25M.With Coping , Sleeve Concreting For Pole 0.6 M X 0.6M X 0.3 M With Coping , Sleeve Concreting For Stay Set 0.3 M & 0.75 Long , Erection Of Distribution Transformer Structure Complete , Excavation Of Structure Pole Pits 0.9 X0.9 X 1.83 Mtr , Transporting Of Pole To Pit Location 2 Nos. , Erection Of Poles 2 Nos , Excavation Of Stay Pit 4 Nos , Erection Of Stay Set (4 Sets) , Mass Concreting (Cement:Sand:Jelly Supplied By The Contractor) 2 Nos. , Erection Of 22 Kv Ab Switch , Ttransformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes , Erection Of Top Channel , Bed Channel [2 Nos Channel] Erection , Cross With Stud For Bed Channel Erection , Erection Of Belting Angle / Hg Fuse Angle , Erection Ofhg Fuse Set , Erection Of Ht Las With Jumpering And Earthing , Erection Of Lt Las With Jumbering And Earthing , Erection Of Jumpering [Ht Side] , Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc. , Erection Lt Open Type Fuse Unit Arrangement Single , Erection Lt Open Type Fuse Unit Arrangementdouble , Painting Of Stru. Complete Excluding Dt [Two Coat Of Red Oxide] All Metal Parts(Excluding Cost Of Paint). , Painting Of Stru. Complete Excluding Dt [One Coat Alu Paint, Excluding Cost Of Paint) , Colour Washing Of 2 Numbers Structure Pole [Excluding Cost Of Distember / Snowsem] , Painting Name Of Ss At Seating Channel Including Paint. , Painting Of Dt Alone [Excluding Painting] With Red Oxide And Double Coating Of Aluminium Paint. , Dt Metering Arrangement (Without Materials) , Erection Of Distribution Transformer /Dismantling Of Dt , Upto 100 Kva , Above 100 Kva And Upto 250 Kva , 500 Kva , Colour Washing Of Rcc / Psc Poles , Numbering Of Poles Including Cost Of Paint / Loc [Black Background And Yellow Letters] , Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint. , Service Connection , Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling , Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 Ws.V. Lamp / Mercury Lamp/Led Yard Light Fittingincluding Wiring, Clamping Of Pipe, Serial Board Assembling Etc. , Fixing Of Street Light Fitting With 2 Cfl/ 4 Cfl , Provision Of St. Lt. Switching Arrangements Including Fixing Meters, Wiring, Service Board Etc. , Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot , Erection/Dismantling Of Metering Set 11 Kv / 22 Kv/33 Kv , Fabrication Works. , Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works. , Providing Of Holes. , All Size Angles / Channel Upto 5/8 , All Size Angles / Channel Above 5/8 , Slot Holes In Flat / Angles / Channel Upto 3/4 , Slot Holes In Flat / Angles / Channel Above 3/4 , Fabrication Of Centre Support Only For Dt Structure , Cutting Of Rs Joist / Angles / Ms Channels , Welding Of Rs Joist / Angles / Ms Channels , General , Set Right The Leaning Pole In Both Ht & Lt[ Pin Point ] Location , Set Right The Leaning Pole In Both Ht & Lt[ Cut Point ] Location , Resagging Of Lines For All Sizes Cut Point Location , Converting Pin Point Into Cut Point Ht Lines , Converting Pin Point Into Cut Point Lt Lines , Clearing Tree Branches Ofcoconut Tree , Clearing Tree Branches Of Neem, Tamarind, Countrytree Etc., , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concerting At Site. , Retrieving Grill From Detoriated Pole [Grill Separate From Damaged Pole] , Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe , Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg. 3Nos Earth Pipe ) , Guarding Arrangement :- , Cradle Guarding Including Earthing And Earth Pit Excavation [Railway & P&T Crossing ] , Flat Guarding With 4 Wire , Split Netural Guarding , Loading And Unloading : , Loading Of 7.5 Mtr / 8.0 Mtr Rcc / Psc/ Metal Pole [Per Pole ] , Loading Of [ 9.14 Mtr ] 9.0 Mtr Poles Rcc /Psc Pole / Metal Pole [ Per Pole ] , Unloading Of Psc / Rcc / Metal Poles , Transporting From Road Side To Workspot , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Upto 1.0 Km , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Above Additional 1.0 Km Or Part Thereof[ Certified By Aee ] , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto 1.0 Km , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto Above Additional 1.0 Km Or Part Thereof , Transport Of Line Materials , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Upto 8 Kms , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Above 8 Kms And For Every Addl. 1 Km , Transport Of Equipements , Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimumup To 30 Km , .Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimum Above 30 Km For Every Addl .1 Km , Dismantling Works , Dismantling Of 7.5M / 8.0M Poles [Rcc / Psc] , Dismantling Of 9.00M / 9.14M Rcc / Psc/Rail Pole, Tubular Pole And All Metal Poles , Dismantling Stay Set Complete , Dismantling Of Lt 1 Ph X Arm / Lt/Ht Ti Fitting , Dismantling Of Lt/Ht Ti Fitting , Dismantling Of Lt 3 Ph X Arm , Dismantlingof 3[1/2] V` X Arm , Dismantlingof Tapping Channel And Guarding X Arm , Dismantling Of 11 Kv Strain Disc/Polymer Disc With Hardware , Dismantling Of 22 Kv Pin Insulator With Pin , Dismantling Of 22 Kvstrain Disc With Hardware , Dismantling Of 33 Kv Pin Insulator With Pin , Dismantling Of 33 Kvstrain Disc With Hardware , Dismantlingof Lt Pin Insulator With Pin , Dismantlingof Lt Shackle With Hardware , Dismantling Of Aluminium Knob , Dismantling Of Conductor7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Dismantling Of Conductoracsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Dismantling Of Conductoracsr 7/4.09 Mm , Single Phase Meter &3 Phase Meter , Fixing Of Single Phase Meter , Fixing Of 3 Phase Meter , Dismantling Of Single Phase Meter , Dismantling Of 3 Phase Meter
BOQ
| Sl. No. | Item Description |
| 1 | SUPPLY OF SILICAGEL BLUE |
| 2 | 0.6KVA UPS |
| 3 | BACKCLAMP SUITABLE FOR 9.00MTR 300KG PSC POLE |
| 4 | STAY CLAMP SUITABLE FOR 9.00MTR 300KG PSC POLE |
| 5 | Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr |
| 6 | LT BRASS BUSHING ROD 20 MM |
| 7 | LT BRASS BUSHING ROD 30 MM |
| 8 | HT BUSHING ROD 12 MM |
| 9 | Stay pit |
| 10 | in ordinary soil [0.95 x 0.6 x 1.2m] |
| 11 | semi rocky soil |
| 12 | Stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned EE] |
| 13 | Erection of poles & stays (Including refilling of excavated earth) |
| 14 | Erection of 7.5m / 8.0m poles [RCC / PSC] |
| 15 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles |
| 16 | Stay set |
| 17 | Erection stay set complete |
| 18 | Stay erection without rod and pit |
| 19 | Replacement of stay rod only. (Including stay pit excavation & refilling & erection) |
| 20 | Replacement of guy shackle only in existing stay |
| 21 | Erection of LINE MATERIALS |
| 22 | Fixing of LT 1 ph \"X\" Arm |
| 23 | Fixing of LT/HT TI Fitting |
| 24 | Fixing of LT 3 ph \"X\" Arm |
| 25 | Fixing of 3[1/2]\" \" V` X \" arm |
| 26 | Fixing of4[1/2]\" V` X \" arm |
| 27 | Fixing of 5\" V X arm |
| 28 | Fixing of tapping channel / guarding \"X\" arm |
| 29 | Providing of line spacers in LT lines 1 phase |
| 30 | Providing of line spacers in LT lines 3 phase |
| 31 | Erection of AB Switch with PT insulator & Jumpering complete |
| 32 | Erection of centre rotating Switch AB Switch complete |
| 33 | FIXING OF HT PIN INSULATOR / STRAIN DISC |
| 34 | 11 KV Pin insulator with pin |
| 35 | 11 KVstrain disc / polymer disc with hardware |
| 36 | 22 KV Pin insulator with pin |
| 37 | 22 KV Strain disc / polymer disc with hardware |
| 38 | 33 KV Pin insulator with pin |
| 39 | 33 KV PinStrain disc/polymer discwith hardware |
| 40 | Fixing of LT Pin insulator with pin |
| 41 | LT Shakle with hardware |
| 42 | Fixing of Aluminium knob |
| 43 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run |
| 44 | Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm |
| 45 | ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm |
| 46 | ACSR 7/4.09 mm |
| 47 | Above 7/4.09 mm ACSR & DOG conductor |
| 48 | Earthing wiring and connection including transporting of earth pipe and excavation of pit] |
| 49 | Transformer structure earthing 10ft depth - 3 nos of pipe throughTubes |
| 50 | DP earthing including all works [double side earthing] |
| 51 | Erection of 4th Earth pipe including earthing |
| 52 | Earthing of poles |
| 53 | Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. |
| 54 | Replacement of detoriated earth pipe per location |
| 55 | Concreting with Mixture 1:3:6 [including All materials]. |
| 56 | Mass Concreting for centre support for 2 feet including all materials |
| 57 | Mass concreting for pole0.6x0.6x1.25M.with coping |
| 58 | Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping |
| 59 | Sleeve concreting for stay set 0.3 m & 0.75 long |
| 60 | Erection of Distribution Transformer Structure Complete |
| 61 | Excavation of structure pole Pits 0.9 X0.9 X 1.83 Mtr |
| 62 | Transporting of pole to pit location 2 Nos. |
| 63 | Erection of poles 2 Nos |
| 64 | Excavation of stay pit 4 Nos |
| 65 | Erection of stay set (4 sets) |
| 66 | Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos. |
| 67 | Erection of 22 KV AB Switch |
| 68 | Ttransformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes |
| 69 | Erection of Top Channel |
| 70 | Bed Channel [2 nos channel] Erection |
| 71 | Cross with stud for bed channel Erection |
| 72 | Erection of belting angle / HG fuse angle |
| 73 | Erection ofHG fuse Set |
| 74 | Erection of HT LAS with jumpering and earthing |
| 75 | Erection of LT LAS with jumbering and earthing |
| 76 | Erection of Jumpering [HT Side] |
| 77 | Transformer wiring in LT side including Jumpering Bus bar etc. |
| 78 | Erection LT open type fuse unit arrangement single |
| 79 | Erection LT open type fuse unit arrangementDouble |
| 80 | Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint). |
| 81 | Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint) |
| 82 | Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] |
| 83 | Painting name of SS at seating channel including paint. |
| 84 | Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint. |
| 85 | DT metering arrangement (without materials) |
| 86 | Erection of distribution Transformer /dismantling of DT |
| 87 | Upto 100 KVA |
| 88 | above 100 KVA and Upto 250 KVA |
| 89 | 500 KVA |
| 90 | Colour washing of RCC / PSC poles |
| 91 | Numbering of poles including cost of paint / loc [black background and yellow letters] |
| 92 | Painting of SC details in the meter board / Agl boxes / Hut SCs including paint. |
| 93 | SERVICE CONNECTION |
| 94 | Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling |
| 95 | Transporting of required materials from road side to work spot and erection of 250 WS.V. lamp / Mercury lamp/LED Yard Light Fittingincluding wiring, clamping of pipe, serial board assembling etc. |
| 96 | Fixing of street light fitting with 2 CFL/ 4 CFL |
| 97 | Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc. |
| 98 | Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot |
| 99 | Erection/dismantling of metering set 11 KV / 22 KV/33 KV |
| 100 | Fabrication Works. |
| 101 | Labour charges for alteration of back clamp / stay clamp to suitable for works. |
| 102 | Providing of Holes. |
| 103 | All size angles / channel upto 5/8\" |
| 104 | All size angles / channel above 5/8\" |
| 105 | Slot holes in flat / angles / channel upto 3/4\" |
| 106 | Slot holes in flat / angles / channel above 3/4\" |
| 107 | Fabrication of centre support only for DT structure |
| 108 | Cutting of RS Joist / Angles / MS Channels |
| 109 | Welding of RS Joist / Angles / MS Channels |
| 110 | GENERAL |
| 111 | Set right the leaning pole in both HT & LT[ pin point ] location |
| 112 | Set right the leaning pole in both HT & LT[ cut point ] location |
| 113 | Resagging of lines for all sizes cut point location |
| 114 | Converting pin point into cut point HT lines |
| 115 | Converting pin point into cut point LT lines |
| 116 | Clearing tree branches ofcoconut tree |
| 117 | Clearing tree branches of Neem, tamarind, countrytree etc., |
| 118 | Releasing and erection 1 ph SC wire [during conductor or support change] |
| 119 | Releasing and erection 3 ph SC wire [during conductor or support change] |
| 120 | Destruction of pole concerting at site. |
| 121 | Retrieving grill from detoriated pole [grill separate from damaged pole] |
| 122 | Re earthing of structure completely including earthpipe changing if any 3nos earth pipe |
| 123 | Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) |
| 124 | Guarding Arrangement :- |
| 125 | Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ] |
| 126 | Flat guarding with 4 wire |
| 127 | Split Netural Guarding |
| 128 | LOADING AND UNLOADING : |
| 129 | Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ] |
| 130 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] |
| 131 | Unloading of PSC / RCC / Metal Poles |
| 132 | TRANSPORTING FROM ROAD SIDE TO WORKSPOT |
| 133 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km |
| 134 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof[ certified by AEE ] |
| 135 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km |
| 136 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof |
| 137 | TRANSPORT OF LINE MATERIALS |
| 138 | Transport of line Materials [ minimum 1 MT ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading Upto 8 kms |
| 139 | Transport of line Materials [ minimum 1 MT ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM |
| 140 | TRANSPORT OF EQUIPEMENTS |
| 141 | Transporting of Distribution Transformer/Metering set by using private vehicleload of one No.MinimumUp to 30 Km |
| 142 | .Transporting of Distribution Transformer/Metering set by using private vehicleload of one No.Minimum above 30 Km for every addl .1 KM |
| 143 | DISMANTLING WORKS |
| 144 | Dismantling of 7.5m / 8.0m poles [RCC / PSC] |
| 145 | Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles |
| 146 | Dismantling stay set complete |
| 147 | Dismantling of LT 1 ph \"X\" Arm / LT/HT TI Fitting |
| 148 | Dismantling of LT/HT TI Fitting |
| 149 | Dismantling of LT 3 ph \"X\" Arm |
| 150 | Dismantlingof 3[1/2]\" V` X \" arm |
| 151 | Dismantlingof Tapping channel and Guarding X Arm |
| 152 | Dismantling of 11 KV strain disc/polymer disc with hardware |
| 153 | Dismantling of 22 KV Pin insulator with pin |
| 154 | Dismantling of 22 KVStrain disc with hardware |
| 155 | Dismantling of 33 KV Pin insulator with pin |
| 156 | Dismantling of 33 KVStrain disc with hardware |
| 157 | Dismantlingof LT Pin insulator with pin |
| 158 | Dismantlingof LT Shackle with hardware |
| 159 | Dismantling of Aluminium knob |
| 160 | Dismantling of Conductor7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm |
| 161 | Dismantling of ConductorACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm |
| 162 | Dismantling of ConductorACSR 7/4.09 mm |
| 163 | SINGLE PHASE METER &3 PHASE METER |
| 164 | Fixing of single phase meter |
| 165 | Fixing of 3 phase meter |
| 166 | Dismantling of single phase meter |
| 167 | Dismantling of 3 phase meter |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed