| 1 | 1)PROVIDINGNEW BORE WELLAND MOTOR AND SPL\"S AND RCC TANK@ILLODU (KARANANTHAL) |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depthexcept in hard rock requiring blasting but inclusive of shoring struttingif required forthe sides of foundation. |
| 3 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, |
| 4 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. |
| 5 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.) |
| 6 | Rainforcement Cement Concrete 1:1.5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 7 | Dadooing Walls with Colour Designed Ceramic Glazed Tiles of size300 mm x 200 m x 6 mmof any shape and quality laidcement mortor 1 : 2over 10 mm base layer in all floors and the Top Pointed with the white cement 0.40 kg mixed with the same colouring Pigments etc complete |
| 8 | Painting Two coat approved Exterior Emulsion over the plastered surface including cost and all other charges etc., |
| 9 | Towards cost for Fixing of RCC Man Hole |
| 10 | Provision for New BoreWell And Motor and Spl\"s |
| 11 | Provision for EB CHARGES |
| 12 | Labour welfare fund @ 1.0% |
| 13 | Provision forName board charges |
| 14 | Provision for Photographic charges |
| 15 | 2)Construction ofCement Concrete Drainage53M and Vertical Filter@KARANANTHAL PILLIYAR KOIL STREET IN ILLODU -1 |
| 16 | Earth work excavating and depositing on bank with initial lead of 2m in hard stiff clay,stiff black cotton,hard red earth ,shales,murrum,gravel stoney earth and earth mixed with smallsize boulders as per ss 20A (For ordinary soil) |
| 17 | Cement Concrete mix in Cm 1:4:8 mix using 40 mm ISS metal including ciost and conveyance of all materials to site and all labour charges for mixing ,laying, and curing etc complete., |
| 18 | Centering below G.L supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC footing column plinth beam,beams,roof slabs, staircase steps,bed blocks,critical pier etc mild steel sheets of size 90 x 60- cm and 10 guage stiffened , welded with mild steell angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak scantlings of size 10 cm x 6.5 cm spaced ofabout 90 cm centre to centre and supported by casurina props of 10cm x 6.5 cm spaced at 75 cm centre to centre complete complying with std specs and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.., |
| 19 | Cement Concrete mix in Cm 1:3:6 mix using 40 mm ISS metal including ciost and conveyance of all materials to site and all labour charges for mixing ,laying, and curing etc complete., |
| 20 | Supplying and fixing of 900 mm dia for Leach pit including all charges etc complete.., |
| 21 | Supplying and fixing PVC rainwater down fall pipe of 110 mm dia with necessary shoes,bends and clamps etc., |
| 22 | Filling the soak pit with 225 mm boulders as per specfication |
| 23 | Filling the soak pit with 40 mm metal as per specification |
| 24 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.., |
| 25 | Filling the soak pit with 20 mm metal as per specification |
| 26 | LWF |
| 27 | Provision for Citizen Name board charges |
| 28 | provision for photographic charges |
| 29 | 3)Construction ofCement Concrete Drainage53M and Vertical Filter@KARANANTHAL PILLIYAR KOIL STREET IN ILLODU -2 |
| 30 | Earth work excavating and depositing on bank with initial lead of 2m in hard stiff clay,stiff black cotton,hard red earth ,shales,murrum,gravel stoney earth and earth mixed with smallsize boulders as per ss 20A (For ordinary soil) |
| 31 | Cement Concrete mix in Cm 1:4:8 mix using 40 mm ISS metal including ciost and conveyance of all materials to site and all labour charges for mixing ,laying, and curing etc complete., |
| 32 | Centering below G.L supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC footing column plinth beam,beams,roof slabs, staircase steps,bed blocks,critical pier etc mild steel sheets of size 90 x 60- cm and 10 guage stiffened , welded with mild steell angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak scantlings of size 10 cm x 6.5 cm spaced ofabout 90 cm centre to centre and supported by casurina props of 10cm x 6.5 cm spaced at 75 cm centre to centre complete complying with std specs and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.., |
| 33 | Cement Concrete mix in Cm 1:3:6 mix using 40 mm ISS metal including ciost and conveyance of all materials to site and all labour charges for mixing ,laying, and curing etc complete., |
| 34 | Supplying and fixing of 900 mm dia for Leach pit including all charges etc complete.., |
| 35 | Supplying and fixing PVC rainwater down fall pipe of 110 mm dia with necessary shoes,bends and clamps etc., |
| 36 | Filling the soak pit with 225 mm boulders as per specfication |
| 37 | Filling the soak pit with 40 mm metal as per specification |
| 38 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete.., |
| 39 | Filling the soak pit with 20 mm metal as per specification |
| 40 | LWF |
| 41 | Provision for Citizen Name board charges |
| 42 | provision for photographic charges |
| 43 | 4)Repairs toAnganwadiBuildingin ILLODU Panchayat. |
| 44 | Chipping the concrete & roughning the surface for roof pressed tiles including all labour charges etc, |
| 45 | Dismantling the Damaged plastering in cement mortar For Wall Surfaceincluding all labour charges etc, |
| 46 | Plastering cm 1;5 -12mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 47 | Plastering cm 1;3 -10mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 48 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations . |
| 49 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete |
| 50 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" and conveyance of all materials to site and all labour charges etc complete -10 cum |
| 51 | Finishing the Top of Roof withSolar reflected Tiles of size 30 5mm x 305 mm x 7 mm laid incement mortor 1 : 3 mix usingM.Sand and Pointingwith the same mortor mixed with water proof compoundincluding cost conveyance of all materials and labour charges etc complete |
| 52 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete |
| 53 | Distempering two coat using oil bound Distemper including cost of distemper and labour charges, etc, complete. |
| 54 | Painting Two coat approved Exterior Emulsion over the plastered surface including cost and all other charges etc., |
| 55 | Manufacturing, supplying and fixing in position of steel windows with Steel Windows with Double Leaves Shutters etc.,complete |
| 56 | Painting TWO coats of old iron works such as steel doors, windows,ventilators, window bars, balustrades etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with stan |
| 57 | Painting TWO coats of new iron works such as steel doors, windows,ventilators, window bars, balustrades etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete complying with stan |
| 58 | door 0.9x2.10 m |
| 59 | Window0.90 x 1.200 m |
| 60 | Wiring with 2 x 1.50 sqm ( 22/0.3) PVC insulated SC unsheathedCu Conductor of 1100 v Grade in suitable PVC Rigid Pipe Concealed in wall and ceiling with PVC accesseries,in flush with wall , with TW box 150 mm x 100 mm x 113 mm TW Switch box with 3 mm thick Hylem sheet coverfor 5A3 Pin non inter locking CS plug with painting of suitable colour with contionues earth wire connection of 14 SWG TC Wire and making good of the concealed portion with suitable colour for Concealed etc., complete Light point |
| 61 | Plugpoint |
| 62 | CFL Fittings |
| 63 | Fan |
| 64 | Provision for Labour charges for fixing Door and Windows etc, |
| 65 | Provision for Painting Cartoons in hall and letters, pictures and boardAnd Bala Painting |
| 66 | Providing Self arrangements |
| 67 | ProvidingWater supply arrangements |
| 68 | Providing Rain Water Pipe |
| 69 | Providing Rain Water Harvesting Strutre |
| 70 | Provision for Name Board charges |
| 71 | Provision forPhotograph charges |
| 72 | Labour welfare fund 1% |
| 73 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |