| 1 | 2024-25 Construction of Community Hall in Pappankulam Village & Nallur Panchayat in ThirupparankundramBlock under Pandithar AyothithasharHabidation Improve - 2024 -2025 R 20.00 Lacs PKG 01 |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 3 | Basement filling for Conveyanced Earth filling complying with standard specification for filling in foundation and basement. |
| 4 | Supply and filling M. sand filling complying with standard specification for filling in foundation and basement. |
| 5 | Cement concrete 1:4:8 mix usin 40 mm HBGSmetal inculding cost and coveyance of allmaterials to site including labour for mixing , laying,curing etc complete., |
| 6 | Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement |
| 7 | R Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and providing fixtures like fan clampsin the RCC floor or Roof wherever necessary and bearing surfaces of walls sides and bottom of slab, beam etc., shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12mm thick and with kraft paper without claming extra etc as directed by the departmental Officers complete complying with standard specification. |
| 8 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate.The binding wire shall be supplied by the Contractor. |
| 9 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna props of 10 cm to13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) |
| 10 | Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc |
| 11 | Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same |
| 12 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mmof approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification.(The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 13 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 14 | Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 15 | Supply and Fixingsteeldoor of size 1.80x2.10m including cost and conveyance of all materials to site of work and all labour charges etc complete. |
| 16 | Supply and Fixing door of size1.20x2.10m including cost and conveyance of all materials to site of work and all labour charges etc complete. |
| 17 | Supply and Fixing steel window of size1.20x1.30m including cost and conveyance of all materials to site of work and all labour charges etc complete. |
| 18 | Emulsion painting TWO coat with freshly burnt shell lime in all floors using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar |
| 19 | Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers. |
| 20 | Provision for Rain water pipe 110 mm PVC |
| 21 | Provision for Name Boardcharges etc., |
| 22 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |