Supply Of Material For Construction Of Kitchen Room For Government High School At Hunashyala P.Y Village Of Mudalagi Taluka. - Lumpsum Material,Add-01,Hom Of Welding And Grinding Machine.,,Mechanic Class Ii / Mechanic Hmp Grade I/Eme Grade,Enamel Paint,.,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint.,,Plastic Emulsion Paint-02,Add Brush, Putty Glue At 5% On Cost Of Paint,Whitening,.,Dry Distemper.,.,Mathi/Nandi Wood Scantling,,Vitrified Tiles 600 X 600 Mm,Add Hom Of Welding And Grinding Machine 2% On Material-02,Mason Class I (With Tools)-02,Fabricator-01,Add 15% Wastage For Glass-02,A 5.50 Mm Thick Plain Glass,Chrominum Plated Screws.,.,Cleat Angles_,Alluminium Handles - 15 Mm.,.,Alluminium Tower Bolt - 20 Cm.,.,Pvc Edge Beading.,Rubber Beading For Shutters Beading.,,Nylon Rollers,.,Aluminium Window Frame Section 1.20 Mm Thick,,Add Brush At 1% On Cost Of Paint.,,Enamel Metal Paint.,,Add Providing And Removing Scaffolding At 3% On Labour.,,Painter Class I.,,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint.,,Ready Mix Primer Paint (Ready Mix Red Lead Paint).,,Add Hom Of Welding And Grinding Machine At 4% On Material,,Fitter Class 1,Ms Flat,.,M.S Rods,,Hom Of Machinaries For Planing,.,Add Cutting And Other Wastage 5%,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Unit Cost As Per The Specification.,,Tools And Plants At 2% Of Material,Hom Of Cutting And Grinding Machine.,,Welder Grade I,,Add Sundries Charges At, 2 % On Material,Add Handling Loading And Unloading At 1% On Material.,,Casurina Poles 100 - 150 Mm.,,Burnt Bricks Class 35 (Non Modular).,,Corbon Electrodes.,,Rms Gusset Plate,,Ms Pipes Of 80 Mm To 100 Mm Dia,,Add Watering Charges At 1 % On Labour.,,Add Sundries Charges At 1 % On Labour.,,Add For Scaffolding 5 Per Cent Of Cost Of Labour And Material,Laboratory Asst. (Sslc Passed)/Mate/Supervisor,,Stone At Quarry-1,Mixer (Concrete Small Used In Culvert.),Bond Stone 20 X 20 X 45 Cm.,,Rubble Stones.,,Binding Wire,.,Tmt Bars Fe 500,.,Add Handling Loading And Unloading At 2% On Material.,,Casurina Poles 75 - 100 Mm Dia.,Jungle Wood Runners And Plank.,,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Hom Of Vibrator 0.71 Days.,,Plasticizer / Super Plasticizer.,.,Over Head, & Other Miscellaneous Charges,Add Sundries Charges At, 1 % On Material.,Add Watering Charges At 1 % On Material.,,Mixer (Concrete) - 1 Cum Capacity.,,Portland Cement,.,Coarse Sand (Zone Iii),,Broken Stone Aggregate 40 Mm Size,,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Broken Stone Aggregate 20 Mm Size,