Educational and Research Institute Local Bodies Closing in 0 days TDR #45030194

Tender For Supply Of Laboratory Equipment/Kit/Component For Ee Department

Issued by Local Bodies · coochbehar, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
01 Oct 2024
0 days left
EMD
80000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
coochbehar → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Supply Of Laboratory Equipment/Kit/Component For Ee Department- 1 Equipment & setup required for Electrical Machines I laba. Study of the characteristics of a compound D.C generator (short shunt) [See annexure-1A for detail specification]b. Measurement of the speed of a D.C series motor as a function of load torque [See annexure-1B for detail specification]c. Polarity test on a Single- Phase Transformer [See annexure-1C for detail specification]d. Study of parallel operation of single-phase transformer. [See annexure-1D for detail specification]e. Determination of temperature rise and efficiency of the transformer (back to back test) [See annexure-1E for detail specification]f. Study of three-phase transformer connections. [See annexure-1F for detail specification] 2 Equipment & setup required for Electrical Machines II lab.a. Different method of starting of 3- Phase Sq. cage induction motor & their comparison (DOL starter, Star-Delta Starter, Auto transformer Starter). [See annexure-2A for detail specification]b. Study of Performance of Wound Rotor Induction Motor under load. [See annexure-2B for detail specification]c. Determination of iron loss, friction loss and windage loss of 3-phase induction motor [See annexure-2C for detail specification]d. Speed control of three phase slip ring Induction motor by rotor resistance control. [See annexure-2D for detail specification]e. Determination of regulation of synchronous machine by (i) Potier reactance method.(ii) Synchronous Impedance method. [See annexure-2E for detail specification]f. Determination of equivalent circuit parameters of a single phase Induction motor. [See annexure-2F for detail specification]g. Load test on single phase Induction motor to obtain the performance characteristics. [See annexure-2G for detail specification]h. To determine the Direct axis reactance (Xd) & Quadrature axis reactance (Xq) of three phase synchronous machine by slip test. [See annexure-2H for detail specification]i. Parallel operation of 3 phase Synchronous generators. [See annexure-2I for detail specification]j. V-curve of Synchronous motor. [See annexure-2J for detail specification]k. Load test on wound rotor induction motor to obtain the performance characteristics. [See annexure-2K for detail specification]l. To make a connection diagram of a full pitch & fractional slot winding of an 18 slot Sq. cage induction motor for 6 pole and 4 pole operation. [See annexure-2L for detail specification]m. To study the performance of the Induction generator. [See annexure-2M for detail specification] 3 Equipment & setup required for Power System I lab.a. Study of distribution system by DC network analyzer [See annexure-3A for detail specification]b. Measurement of earth resistance by earth tester [See annexure-3B for detail specification]c. Determination of dielectric strength of insulating oil. [See annexure-3C for detail specification]d. Determination of breakdown strength of solid insulating material [See annexure-3D for detail specification]e. Study of active and reactive power control of alternator. [See annexure-3E for detail specification]f. Determination of dielectric constant, tan delta, resistivity of transformer oil. [See annexure-3F for detail specification] 4 Equipment & setup required for Power System II lab.a. Study on the characteristics of on load time delay relay andoff load time delay relay [See annexure-4A for detail specification]b. Test to find out polarity, ratio and magnetization characteristics of CT and PT [See annexure-4B for detail specification]c. Test to find out characteristics of (a) under voltage relay (b) earth fault relay [See annexure-4C for detail specification]d. Study of different characteristics of over current relay. [See annexure-4D for detail specification] 5 Equipment & setup required for Control System lab.a. Linear System Simulator [See annexure-5A for detail specification] 6 Equipment & setup required for Power Electronics lab.a. Study of different triggering circuits of an SCR [See annexure-6A for detail specification]b. Study of performance of PWM bridge inverter using MOSFET as switch with R and R-L load [See annexure-6B for detail specification]c. Study of firing circuits suitable for triggering SCR in a single phase full controlled bridge [See annexure-6C for detail specification]d. Study of the operation of a single phase full controlled bridge converter with R and R-L load [See annexure-6D for detail specification]e. Study of performance of single phase half controlled symmetrical and asymmetrical bridge converters. [See annexure-6E for detail specification]f. Study of performance of step down chopper with R and R-L load with Digital display. [See annexure-6F for detail specification]g. Study of the characteristics of an SCR.V-I characteristics with digital 3 nos meters [See annexure-6G for detail specification]h. Study of the characteristics of a Triac.V-I characteristics with digital meters. [See annexure-6H for detail specification] 7 Equipment & setup required for Electrical Design lab.a. Design a controller for speed control of DC Machine [See annexure-7A for detail specification]b. Design a heating element with specified wattage, voltage and ambient temperature. [See annexure-7B for detail specification]c. Familiarization of construction of single phase Fand. Design and fabrication of small single phase transformer, 100VA, 220/12 V [See annexure-7C for detail specification]e. Hand held LCR meter – 3 nos [See annexure-7Dfor detail specification]f. AC/DC Clamp Meter- 3nos [See annexure-7E for detail specification]g. Megger- 3 nos. 8 Equipment & setup required for Electrical Drives laba. Study of speed control of Chopper fed DC Drive [See annexure-8A for detail specification]b. Study of speed control of single phase motor using TRIAC & DIAC. [See annexure-8B for detail specification]c. Study of V/f control of 3phase Induction motor drive [See annexure-8C for detail specification]d. Study of speed control of Thysistor controlled DC Drive [See annexure-8D for detail specification]e. Study of PC/PLC based AC/DC motor control operation [See annexure-8E for detail specification] 9 Note:1) All the above rates should be quoted inclusive of all taxes & duties as applicable.2) Total is rounded off to the nearest rupees.

BOQ

Name of Work: Supply of Laboratory equipment/kit/component for EE department
Sl. No. Item Description
1Equipment & setup required for Electrical Machines I laba. Study of the characteristics of a compound D.C generator (short shunt) [See annexure-1A for detail specification]b. Measurement of the speed of a D.C series motor as a function of load torque [See annexure-1B for detail specification]c. Polarity test on a Single- Phase Transformer [See annexure-1C for detail specification]d. Study of parallel operation of single-phase transformer. [See annexure-1D for detail specification]e. Determination of temperature rise and efficiency of the transformer (back to back test) [See annexure-1E for detail specification]f. Study of three-phase transformer connections. [See annexure-1F for detail specification]
2Equipment & setup required for Electrical Machines II lab.a. Different method of starting of 3- Phase Sq. cage induction motor & their comparison (DOL starter, Star-Delta Starter, Auto transformer Starter). [See annexure-2A for detail specification]b. Study of Performance of Wound Rotor Induction Motor under load. [See annexure-2B for detail specification]c. Determination of iron loss, friction loss and windage loss of 3-phase induction motor [See annexure-2C for detail specification]d. Speed control of three phase slip ring Induction motor by rotor resistance control. [See annexure-2D for detail specification]e. Determination of regulation of synchronous machine by (i) Potier reactance method.(ii) Synchronous Impedance method. [See annexure-2E for detail specification]f. Determination of equivalent circuit parameters of a single phase Induction motor. [See annexure-2F for detail specification]g. Load test on single phase Induction motor to obtain the performance characteristics. [See annexure-2G for detail specification]h. To determine the Direct axis reactance (Xd) & Quadrature axis reactance (Xq) of three phase synchronous machine by slip test. [See annexure-2H for detail specification]i. Parallel operation of 3 phase Synchronous generators. [See annexure-2I for detail specification]j. V-curve of Synchronous motor. [See annexure-2J for detail specification]k. Load test on wound rotor induction motor to obtain the performance characteristics. [See annexure-2K for detail specification]l. To make a connection diagram of a full pitch & fractional slot winding of an 18 slot Sq. cage induction motor for 6 pole and 4 pole operation. [See annexure-2L for detail specification]m. To study the performance of the Induction generator. [See annexure-2M for detail specification]
3Equipment & setup required for Power System I lab.a. Study of distribution system by DC network analyzer [See annexure-3A for detail specification]b. Measurement of earth resistance by earth tester [See annexure-3B for detail specification]c. Determination of dielectric strength of insulating oil. [See annexure-3C for detail specification]d. Determination of breakdown strength of solid insulating material [See annexure-3D for detail specification]e. Study of active and reactive power control of alternator. [See annexure-3E for detail specification]f. Determination of dielectric constant, tan delta, resistivity of transformer oil. [See annexure-3F for detail specification]
4Equipment & setup required for Power System II lab.a. Study on the characteristics of on load time delay relay andoff load time delay relay [See annexure-4A for detail specification]b. Test to find out polarity, ratio and magnetization characteristics of CT and PT [See annexure-4B for detail specification]c. Test to find out characteristics of (a) under voltage relay (b) earth fault relay [See annexure-4C for detail specification]d. Study of different characteristics of over current relay. [See annexure-4D for detail specification]
5Equipment & setup required for Control System lab.a. Linear System Simulator [See annexure-5A for detail specification]
6Equipment & setup required for Power Electronics lab.a. Study of different triggering circuits of an SCR [See annexure-6A for detail specification]b. Study of performance of PWM bridge inverter using MOSFET as switch with R and R-L load [See annexure-6B for detail specification]c. Study of firing circuits suitable for triggering SCR in a single phase full controlled bridge [See annexure-6C for detail specification]d. Study of the operation of a single phase full controlled bridge converter with R and R-L load [See annexure-6D for detail specification]e. Study of performance of single phase half controlled symmetrical and asymmetrical bridge converters. [See annexure-6E for detail specification]f. Study of performance of step down chopper with R and R-L load with Digital display. [See annexure-6F for detail specification]g. Study of the characteristics of an SCR.V-I characteristics with digital 3 nos meters [See annexure-6G for detail specification]h. Study of the characteristics of a Triac.V-I characteristics with digital meters. [See annexure-6H for detail specification]
7Equipment & setup required for Electrical Design lab.a. Design a controller for speed control of DC Machine [See annexure-7A for detail specification]b. Design a heating element with specified wattage, voltage and ambient temperature. [See annexure-7B for detail specification]c. Familiarization of construction of single phase Fand. Design and fabrication of small single phase transformer, 100VA, 220/12 V [See annexure-7C for detail specification]e. Hand held LCR meter – 3 nos [See annexure-7Dfor detail specification]f. AC/DC Clamp Meter- 3nos [See annexure-7E for detail specification]g. Megger- 3 nos.
8Equipment & setup required for Electrical Drives laba. Study of speed control of Chopper fed DC Drive [See annexure-8A for detail specification]b. Study of speed control of single phase motor using TRIAC & DIAC. [See annexure-8B for detail specification]c. Study of V/f control of 3phase Induction motor drive [See annexure-8C for detail specification]d. Study of speed control of Thysistor controlled DC Drive [See annexure-8D for detail specification]e. Study of PC/PLC based AC/DC motor control operation [See annexure-8E for detail specification]
9Note:1) All the above rates should be quoted inclusive of all taxes & duties as applicable.2) Total is rounded off to the nearest rupees.

AI Tender Summary

OUR REF NO 45030194
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 01-10-2024
Authority
Authority Name Department of Higher Education
Work Description Tender For Supply Of Laboratory Equipment/Kit/Component For Ee Department- 1 Equipment & setup required for Electrical Machines I laba. Study of the characteristics of a compound D.C generator (short shunt) [See annexure-1A for detail specification]b. Measurement of the speed of a D.C series motor as a function of load torque [See annexure-1B for detail specification]c. Polarity test on a Single- Phase Transformer [See annexure-1C for detail specification]d. Study of parallel operation of single-phase transformer. [See annexure-1D for detail specification]e. Determination of temperature rise and efficiency of the transformer (back to back test) [See annexure-1E for detail specification]f. Study of three-phase transformer connections. [See annexure-1F for detail specification] 2 Equipment & setup required for Electrical Machines II lab.a. Different method of starting of 3- Phase Sq. cage induction motor & their comparison (DOL starter, Star-Delta Starter, Auto transformer Starter). [See annexure-2A for detail specification]b. Study of Performance of Wound Rotor Induction Motor under load. [See annexure-2B for detail specification]c. Determination of iron loss, friction loss and windage loss of 3-phase induction motor [See annexure-2C for detail specification]d. Speed control of three phase slip ring Induction motor by rotor resistance control. [See annexure-2D for detail specification]e. Determination of regulation of synchronous machine by (i) Potier reactance method.(ii) Synchronous Impedance method. [See annexure-2E for detail specification]f. Determination of equivalent circuit parameters of a single phase Induction motor. [See annexure-2F for detail specification]g. Load test on single phase Induction motor to obtain the performance characteristics. [See annexure-2G for detail specification]h. To determine the Direct axis reactance (Xd) & Quadrature axis reactance (Xq) of three phase synchronous machine by slip test. [See annexure-2H for detail specification]i. Parallel operation of 3 phase Synchronous generators. [See annexure-2I for detail specification]j. V-curve of Synchronous motor. [See annexure-2J for detail specification]k. Load test on wound rotor induction motor to obtain the performance characteristics. [See annexure-2K for detail specification]l. To make a connection diagram of a full pitch & fractional slot winding of an 18 slot Sq. cage induction motor for 6 pole and 4 pole operation. [See annexure-2L for detail specification]m. To study the performance of the Induction generator. [See annexure-2M for detail specification] 3 Equipment & setup required for Power System I lab.a. Study of distribution system by DC network analyzer [See annexure-3A for detail specification]b. Measurement of earth resistance by earth tester [See annexure-3B for detail specification]c. Determination of dielectric strength of insulating oil. [See annexure-3C for detail specification]d. Determination of breakdown strength of solid insulating material [See annexure-3D for detail specification]e. Study of active and reactive power control of alternator. [See annexure-3E for detail specification]f. Determination of dielectric constant, tan delta, resistivity of transformer oil. [See annexure-3F for detail specification] 4 Equipment & setup required for Power System II lab.a. Study on the characteristics of on load time delay relay andoff load time delay relay [See annexure-4A for detail specification]b. Test to find out polarity, ratio and magnetization characteristics of CT and PT [See annexure-4B for detail specification]c. Test to find out characteristics of (a) under voltage relay (b) earth fault relay [See annexure-4C for detail specification]d. Study of different characteristics of over current relay. [See annexure-4D for detail specification] 5 Equipment & setup required for Control System lab.a. Linear System Simulator [See annexure-5A for detail specification] 6 Equipment & setup required for Power Electronics lab.a. Study of different triggering circuits of an SCR [See annexure-6A for detail specification]b. Study of performance of PWM bridge inverter using MOSFET as switch with R and R-L load [See annexure-6B for detail specification]c. Study of firing circuits suitable for triggering SCR in a single phase full controlled bridge [See annexure-6C for detail specification]d. Study of the operation of a single phase full controlled bridge converter with R and R-L load [See annexure-6D for detail specification]e. Study of performance of single phase half controlled symmetrical and asymmetrical bridge converters. [See annexure-6E for detail specification]f. Study of performance of step down chopper with R and R-L load with Digital display. [See annexure-6F for detail specification]g. Study of the characteristics of an SCR.V-I characteristics with digital 3 nos meters [See annexure-6G for detail specification]h. Study of the characteristics of a Triac.V-I characteristics with digital meters. [See annexure-6H for detail specification] 7 Equipment & setup required for Electrical Design lab.a. Design a controller for speed control of DC Machine [See annexure-7A for detail specification]b. Design a heating element with specified wattage, voltage and ambient temperature. [See annexure-7B for detail specification]c. Familiarization of construction of single phase Fand. Design and fabrication of small single phase transformer, 100VA, 220/12 V [See annexure-7C for detail specification]e. Hand held LCR meter – 3 nos [See annexure-7Dfor detail specification]f. AC/DC Clamp Meter- 3nos [See annexure-7E for detail specification]g. Megger- 3 nos. 8 Equipment & setup required for Electrical Drives laba. Study of speed control of Chopper fed DC Drive [See annexure-8A for detail specification]b. Study of speed control of single phase motor using TRIAC & DIAC. [See annexure-8B for detail specification]c. Study of V/f control of 3phase Induction motor drive [See annexure-8C for detail specification]d. Study of speed control of Thysistor controlled DC Drive [See annexure-8D for detail specification]e. Study of PC/PLC based AC/DC motor control operation [See annexure-8E for detail specification] 9 Note:1) All the above rates should be quoted inclusive of all taxes & duties as applicable.2) Total is rounded off to the nearest rupees.
Basic Detail
Tender No CGEC/NIT-11(a)/2024-25
Bidding Type Tender
Location
City coochbehar
State West Bengal
Key Dates
Publish Date 02 Sep 2024
Submission Date 01 Oct 2024
Open Date 04 Oct 2024
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 80000
Exemption Available
Document List
6979cbf4-95c9-415e-bff4-458aa7273f8c.html
BOQ_1637593.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 02, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 01, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 04, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

6979cbf4-95c9-415e-bff4-458aa7273f8c.html

xls

BOQ_1637593.xls

pdf

Tendernotice_1.pdf

TenderDetail
Loading tenders