Tender For Replacement Of Jarjar Vcb, Control Panel, Installation New Distribution. Transformer And Other Work Under Edd Budhana And Khatauli, Under Business Plan Work 2024-25 Replacement Of Jarjar Vcb, Control Panel, Isolator, Fuse Set, And Placed New Vc
Tender Overview
Project Description
tender for Replacement Of Jarjar Vcb, Control Panel, Installation New Distribution. transformer And Other Work Under Edd Budhana And Khatauli, Under Business Plan Work 2024-25 Replacement of Jarjar Vcb, Control Panel, Isolator, Fuse set, and Placed New VCB, on33/11 KVJaula,Fugana, Kurthal, Dungar, Moh.pur Rai singh, Chandhadi, Sarnawali, Tisang and Installation of New 25 & 100 KVA transformer of Shri Rampal, Mata Ki Johadi, on Budhana Rural S/S In Area of of EDD Budhana, 1 Safe cartage of 25KVA, 63 KVA,100 KVA Transformer and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 2 Safe cartage of 33KV And 11KV VCBfrom central store to 33KV Sub Station ( Including Loading, Unloading in all Respect) 3 Safe Cartage of 11 Kv / 33 KV Fuse Set and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 4 Safe Cartage of Control Penal Centerlized Item and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 5 Dismentling of old Control penal from Control Room including opening of all Connection and placed Safe place 6 Shifting of New Control Penalfrom out side to inside the control room with the help of heavy duty crene and its instalationvProperly Connection with grouting with anchor bolts. 7 Shifting of 11KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect. 8 Dismentling of old 33KV VCb including opening of all Connection and carriage of VCB from Switch Yardto out side on Safe place 9 Shifting of 33KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect. 10 Safe cartage of PCC Pole 8.5 Mtr.Long from Centeral Store to site work Including Loading, unloading at both end. 11 Safe cartage of Bus/Line Isolater and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 12 Digging and Erection pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) 13 Digging and Erection polewith grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) 14 Installation of 25KVA, 63 KVA,100 KVAT/F on Dp in all respect and energize after complete all work as RESPO Norms. 15 Safe cartage of ABCfrom Central Store to site work Including Loading, unloading at both side & Laying LT Ab Cable of size 3x120+1x95+1x16/3x95+1x71+1x16 Sq MM and erection and complete work asRESPO norms including of all accessories.(Decentralized Item As Dead End Clamp, Suspence Clamp, Holding, Nut bolt etc will be provide by Contractor) 16 Received Back oldVCB from Site to Store (Including Loading, Unloading, Cartage in all respect) 17 Proper Earthing As Reshpo Norms 18 Proper Grauting of Pole As Reshpo Norms 19 Instalation of LT Protection fuse set 20 Instalation of 11KV Fuse Set as Reshpo Norms 21 Instalation of 33KV Fuse Set as Reshpo Norms 22 Instalation of 33KV Fuse Set as Reshpo Norms 23 Receive back of Damaged 33kv VCB and Control Penal to PVVNL Store 24 Receve Back of Scrap Mterial to PVVNL Store.
BOQ
| Sl. No. | Item Description |
| 1 | Safe cartage of 25KVA, 63 KVA,100 KVA Transformer and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) |
| 2 | Safe cartage of 33KV And 11KV VCBfrom central store to 33KV Sub Station ( Including Loading, Unloading in all Respect) |
| 3 | Safe Cartage of 11 Kv / 33 KV Fuse Set and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) |
| 4 | Safe Cartage of Control Penal Centerlized Item and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) |
| 5 | Dismentling of old Control penal from Control Room including opening of all Connection and placed Safe place |
| 6 | Shifting of New Control Penalfrom out side to inside the control room with the help of heavy duty crene and its instalationvProperly Connection with grouting with anchor bolts. |
| 7 | Shifting of 11KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect. |
| 8 | Dismentling of old 33KV VCb including opening of all Connection and carriage of VCB from Switch Yardto out side on Safe place |
| 9 | Shifting of 33KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect. |
| 10 | Safe cartage of PCC Pole 8.5 Mtr.Long from Centeral Store to site work Including Loading, unloading at both end. |
| 11 | Safe cartage of Bus/Line Isolater and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) |
| 12 | Digging and Erection pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) |
| 13 | Digging and Erection polewith grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) |
| 14 | Installation of 25KVA, 63 KVA,100 KVAT/F on Dp in all respect and energize after complete all work as RESPO Norms. |
| 15 | Safe cartage of ABCfrom Central Store to site work Including Loading, unloading at both side & Laying LT Ab Cable of size 3x120+1x95+1x16/3x95+1x71+1x16 Sq MM and erection and complete work asRESPO norms including of all accessories.(Decentralized Item As Dead End Clamp, Suspence Clamp, Holding, Nut bolt etc will be provide by Contractor) |
| 16 | Received Back oldVCB from Site to Store (Including Loading, Unloading, Cartage in all respect) |
| 17 | Proper Earthing As Reshpo Norms |
| 18 | Proper Grauting of Pole As Reshpo Norms |
| 19 | Instalation of LT Protection fuse set |
| 20 | Instalation of 11KV Fuse Set as Reshpo Norms |
| 21 | Instalation of 33KV Fuse Set as Reshpo Norms |
| 22 | Instalation of 33KV Fuse Set as Reshpo Norms |
| 23 | Receive back of Damaged 33kv VCB and Control Penal to PVVNL Store |
| 24 | Receve Back of Scrap Mterial to PVVNL Store. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender