Power Government Departments Closing in 0 days TDR #45028096

Tender For Replacement Of Jarjar Vcb, Control Panel, Installation New Distribution. Transformer And Other Work Under Edd Budhana And Khatauli, Under Business Plan Work 2024-25 Replacement Of Jarjar Vcb, Control Panel, Isolator, Fuse Set, And Placed New Vc

Issued by Government Departments · budhana, Uttar Pradesh
Tender Value
3 Lakhs
Estimated cost
Bid Submission
07 Sep 2024
0 days left
EMD
3000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
budhana → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

tender for Replacement Of Jarjar Vcb, Control Panel, Installation New Distribution. transformer And Other Work Under Edd Budhana And Khatauli, Under Business Plan Work 2024-25 Replacement of Jarjar Vcb, Control Panel, Isolator, Fuse set, and Placed New VCB, on33/11 KVJaula,Fugana, Kurthal, Dungar, Moh.pur Rai singh, Chandhadi, Sarnawali, Tisang and Installation of New 25 & 100 KVA transformer of Shri Rampal, Mata Ki Johadi, on Budhana Rural S/S In Area of of EDD Budhana, 1 Safe cartage of 25KVA, 63 KVA,100 KVA Transformer and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 2 Safe cartage of 33KV And 11KV VCBfrom central store to 33KV Sub Station ( Including Loading, Unloading in all Respect) 3 Safe Cartage of 11 Kv / 33 KV Fuse Set and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 4 Safe Cartage of Control Penal Centerlized Item and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 5 Dismentling of old Control penal from Control Room including opening of all Connection and placed Safe place 6 Shifting of New Control Penalfrom out side to inside the control room with the help of heavy duty crene and its instalationvProperly Connection with grouting with anchor bolts. 7 Shifting of 11KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect. 8 Dismentling of old 33KV VCb including opening of all Connection and carriage of VCB from Switch Yardto out side on Safe place 9 Shifting of 33KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect. 10 Safe cartage of PCC Pole 8.5 Mtr.Long from Centeral Store to site work Including Loading, unloading at both end. 11 Safe cartage of Bus/Line Isolater and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 12 Digging and Erection pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) 13 Digging and Erection polewith grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) 14 Installation of 25KVA, 63 KVA,100 KVAT/F on Dp in all respect and energize after complete all work as RESPO Norms. 15 Safe cartage of ABCfrom Central Store to site work Including Loading, unloading at both side & Laying LT Ab Cable of size 3x120+1x95+1x16/3x95+1x71+1x16 Sq MM and erection and complete work asRESPO norms including of all accessories.(Decentralized Item As Dead End Clamp, Suspence Clamp, Holding, Nut bolt etc will be provide by Contractor) 16 Received Back oldVCB from Site to Store (Including Loading, Unloading, Cartage in all respect) 17 Proper Earthing As Reshpo Norms 18 Proper Grauting of Pole As Reshpo Norms 19 Instalation of LT Protection fuse set 20 Instalation of 11KV Fuse Set as Reshpo Norms 21 Instalation of 33KV Fuse Set as Reshpo Norms 22 Instalation of 33KV Fuse Set as Reshpo Norms 23 Receive back of Damaged 33kv VCB and Control Penal to PVVNL Store 24 Receve Back of Scrap Mterial to PVVNL Store.

BOQ

Name of Work:Under Business Plan Work 2024-25 Replacement of Jarjar Vcb, Control Penel,Isolater, Fuse set, and Placed New VCB, on33/11 KVJaula,Fugana, Kurthal, Dungar, Moh.pur Rai singh, Chandhadi, Sarnawali, Tisang and Instalation of New 25 & 100 KVA T/F of Shri Rampal, Mata Ki Johadi, on Budhana Rural S/S In Area of of EDD Budhana
Sl. No. Item Description
1Safe cartage of 25KVA, 63 KVA,100 KVA Transformer and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect)
2Safe cartage of 33KV And 11KV VCBfrom central store to 33KV Sub Station ( Including Loading, Unloading in all Respect)
3Safe Cartage of 11 Kv / 33 KV Fuse Set and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect)
4Safe Cartage of Control Penal Centerlized Item and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect)
5Dismentling of old Control penal from Control Room including opening of all Connection and placed Safe place
6Shifting of New Control Penalfrom out side to inside the control room with the help of heavy duty crene and its instalationvProperly Connection with grouting with anchor bolts.
7Shifting of 11KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect.
8Dismentling of old 33KV VCb including opening of all Connection and carriage of VCB from Switch Yardto out side on Safe place
9Shifting of 33KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect.
10Safe cartage of PCC Pole 8.5 Mtr.Long from Centeral Store to site work Including Loading, unloading at both end.
11Safe cartage of Bus/Line Isolater and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect)
12Digging and Erection pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor)
13Digging and Erection polewith grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor)
14Installation of 25KVA, 63 KVA,100 KVAT/F on Dp in all respect and energize after complete all work as RESPO Norms.
15Safe cartage of ABCfrom Central Store to site work Including Loading, unloading at both side & Laying LT Ab Cable of size 3x120+1x95+1x16/3x95+1x71+1x16 Sq MM and erection and complete work asRESPO norms including of all accessories.(Decentralized Item As Dead End Clamp, Suspence Clamp, Holding, Nut bolt etc will be provide by Contractor)
16Received Back oldVCB from Site to Store (Including Loading, Unloading, Cartage in all respect)
17Proper Earthing As Reshpo Norms
18Proper Grauting of Pole As Reshpo Norms
19Instalation of LT Protection fuse set
20Instalation of 11KV Fuse Set as Reshpo Norms
21Instalation of 33KV Fuse Set as Reshpo Norms
22Instalation of 33KV Fuse Set as Reshpo Norms
23Receive back of Damaged 33kv VCB and Control Penal to PVVNL Store
24Receve Back of Scrap Mterial to PVVNL Store.

AI Tender Summary

OUR REF NO 45028096
AUTHORITY Government Departments
TENDER VALUE 3 Lakhs
LAST DATE 07-09-2024
Authority
Authority Name Paschimanchal Vidyut Vitran Nigam Limited
Work Description tender for Replacement Of Jarjar Vcb, Control Panel, Installation New Distribution. transformer And Other Work Under Edd Budhana And Khatauli, Under Business Plan Work 2024-25 Replacement of Jarjar Vcb, Control Panel, Isolator, Fuse set, and Placed New VCB, on33/11 KVJaula,Fugana, Kurthal, Dungar, Moh.pur Rai singh, Chandhadi, Sarnawali, Tisang and Installation of New 25 & 100 KVA transformer of Shri Rampal, Mata Ki Johadi, on Budhana Rural S/S In Area of of EDD Budhana, 1 Safe cartage of 25KVA, 63 KVA,100 KVA Transformer and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 2 Safe cartage of 33KV And 11KV VCBfrom central store to 33KV Sub Station ( Including Loading, Unloading in all Respect) 3 Safe Cartage of 11 Kv / 33 KV Fuse Set and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 4 Safe Cartage of Control Penal Centerlized Item and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 5 Dismentling of old Control penal from Control Room including opening of all Connection and placed Safe place 6 Shifting of New Control Penalfrom out side to inside the control room with the help of heavy duty crene and its instalationvProperly Connection with grouting with anchor bolts. 7 Shifting of 11KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect. 8 Dismentling of old 33KV VCb including opening of all Connection and carriage of VCB from Switch Yardto out side on Safe place 9 Shifting of 33KV New VCB from out side to inside the control room/Switch yard with the help of heavy duty crene and its instalation with grouting with anchor bolts with all respect. 10 Safe cartage of PCC Pole 8.5 Mtr.Long from Centeral Store to site work Including Loading, unloading at both end. 11 Safe cartage of Bus/Line Isolater and instalation centralised material from central store to JE Store/ Work Site ( Including Loading, Unloading in all Respect) 12 Digging and Erection pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) 13 Digging and Erection polewith grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor) 14 Installation of 25KVA, 63 KVA,100 KVAT/F on Dp in all respect and energize after complete all work as RESPO Norms. 15 Safe cartage of ABCfrom Central Store to site work Including Loading, unloading at both side & Laying LT Ab Cable of size 3x120+1x95+1x16/3x95+1x71+1x16 Sq MM and erection and complete work asRESPO norms including of all accessories.(Decentralized Item As Dead End Clamp, Suspence Clamp, Holding, Nut bolt etc will be provide by Contractor) 16 Received Back oldVCB from Site to Store (Including Loading, Unloading, Cartage in all respect) 17 Proper Earthing As Reshpo Norms 18 Proper Grauting of Pole As Reshpo Norms 19 Instalation of LT Protection fuse set 20 Instalation of 11KV Fuse Set as Reshpo Norms 21 Instalation of 33KV Fuse Set as Reshpo Norms 22 Instalation of 33KV Fuse Set as Reshpo Norms 23 Receive back of Damaged 33kv VCB and Control Penal to PVVNL Store 24 Receve Back of Scrap Mterial to PVVNL Store.
Basic Detail
Tender No 180R2/2023-24/EDCIIMZN
Bidding Type Tender
Location
City budhana
State Uttar Pradesh
Key Dates
Publish Date 02 Sep 2024
Submission Date 07 Sep 2024
Open Date 07 Sep 2024
Finance
Tender Value 3 Lakhs
Tender Fee 1180
EMD 3000
Exemption Not Available
Document List
a84af082-fe69-4a6e-98e8-aa5408e401c8.html
BOQ_1651039.xls
T180.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 02, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 07, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 07, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

a84af082-fe69-4a6e-98e8-aa5408e401c8.html

xls

BOQ_1651039.xls

pdf

T180.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail