Tender For Erode District Retender For Improvements Of The Road In Package No. Tn 12-185 Of Sathyamangalam Block Under Pmgsy Iii 2023-24 Batch I
Tender Value
2.65 Crore
Estimated cost
Bid Submission
18 Sep 2024
0 days left
EMD
5.32 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
sathyamangalam → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Erode District Retender For Improvements Of The Road In Package No. Tn 12-185 Of Sathyamangalam Block Under Pmgsy Iii 2023-24 Batch I
BOQ
| Sl. No. | Item Description |
| 1 | Name of Work : Improvements to the road from MRL06-Pavalakuttai to Karalayam road km 3/400-7/000 (MSS using Plastic Waste) |
| 2 | Clearing and Grubbing Road LandClearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. In Area of Thorny Junglekm 3/400-7/000 |
| 3 | Picking BT Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical specification clause 301.4 |
| 4 | Excavation in Soil using Hydraulic Excavatorand Tippers with disposal upto 1000 mExcavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 5 | Km 3/400-4/000 |
| 6 | Km 4/000-5/000 |
| 7 | Km 5/000-6/000 |
| 8 | Km 6/000-7/000 |
| 9 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth) |
| 10 | Km 3/400-4/000 |
| 11 | Km 4/000-5/000 |
| 12 | Km 5/000-6/000 |
| 13 | Km 6/000-7/000 |
| 14 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Using Borrow pits earth) |
| 15 | Km 3/400-4/000 |
| 16 | Km 4/000-5/000 |
| 17 | Km 5/000-6/000 |
| 18 | Km 6/000-7/000 |
| 19 | Gravel ShoulderConstruction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meetrequirement of tables 300.1 and 300.2 as per Technical specification Clause 301.5 |
| 20 | Km 3/400-4/000 |
| 21 | Km 4/000-5/000 |
| 22 | Km 5/000-6/000 |
| 23 | Km 6/000-7/000 |
| 24 | WET MIX MACADAM :Providing, laying, spreaing and compacting graded stone aggregate to wet mix macadam specification including premixing the amterial with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/ base course on a well prepared surface and compacting with vibratory roller to achieve the desired density |
| 25 | Km 3/400-4/000 |
| 26 | Km 4/000-5/000 |
| 27 | Km 5/000-6/000 |
| 28 | Km 6/000-7/000 |
| 29 | PRIMER COAT:Providing and applying Prime coat with bitumen emulsion (SS-1) on prepared surfce of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical as per Technical Specification Clause 502. |
| 30 | Km 3/400-4/000 |
| 31 | Km 4/000-5/000 |
| 32 | Km 5/000-6/000 |
| 33 | Km 6/000-7/000 |
| 34 | TACK COAT :Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 |
| 35 | Km 3/400-4/000 |
| 36 | Km 4/000-5/000 |
| 37 | Km 5/000-6/000 |
| 38 | Km 6/000-7/000 |
| 39 | MIX SEAL SURFACE (using Waste Plastic)Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 |
| 40 | Km 3/400-4/000 |
| 41 | Km 4/000-5/000 |
| 42 | Km 5/000-6/000 |
| 43 | Km 6/000-7/000 |
| 44 | Provision of Rumble strips with premix Bituminous carpetProvision of 15nos. Rumble strips covered with promix bituminus carpet. 15-20mm high at centre. 250mm wide placed at 1m centre-to- centre at approved locations to control speed, marked with white strips of road marking paint. |
| 45 | Km 3/400-4/000 |
| 46 | Km 4/000-5/000 |
| 47 | Km 5/000-6/000 |
| 48 | Km 6/000-7/000 |
| 49 | Providing and fixing Name Board |
| 50 | Providing and fixing Logo Board of PMGSY Project |
| 51 | Providing and fixing Citizen Information Board of PMGSY Project |
| 52 | Providing and fixing Maintanence Information Board of PMGSY Project |
| 53 | Providing and fixing of cautionary, mandatory and informatory sign boardProviding and fixing of Retro Reflectorised Cautionary, Mandatory signs with definition plate made out of High Intensity Grade prismatic sheeting conforming to IRC-67:2010 & ASTM D 4956-09, Type IV specification and Fixed over 1.50mm thick Aluminium sheet Fixed on back support frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cm x 45cm x 60cm below Ground level etc Complete including 7 years warranty for the Retro Reflective sheeting as per clause 6.90 of IRC 67-2010 |
| 54 | 60 Cm Equilateral triangle (Cautionary) Sign Board |
| 55 | 60 Cm Circular (Mandatory) Sign Board |
| 56 | Chevron Signs 90 Cm Octogon (Curves) |
| 57 | Reflector ( near culverts & trees ) |
| 58 | Road marking with hot applied thermo plastic compound |
| 59 | Km 0/000-6/180 |
| 60 | KM StoneReinforced cement concrete M15 grade kilometer stone\local stone of standard design as per IRC:8 fixing in position including painting and printing etc as per drawing and Technical Specication clause 1703 |
| 61 | Ordinary KM stone (Precast) |
| 62 | 200m stone (Precast) |
| 63 | Guard stone (Precast) |
| 64 | Construction of Hard Bed @ Ch.4000 m. |
| 65 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 66 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 67 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 68 | Construction of granular sub base by providing well graaded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 4.02 |
| 69 | Providing, laying, spreaing and compacting graded stone aggregate to wet mix macadam specification including premixing the amterial with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/ base course on a well prepared surface and compacting with vibratory roller to achieve the desired density |
| 70 | Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to linesand grade as per drawing and Technical Specification Clause 1501 |
| 71 | Construction of 1.50 span RCC Slab Culvert @ Ch.4040m. |
| 72 | Dismantling of existing structure like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whereever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical specification clause |
| 73 | Dismantling of existing structures like culvers, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all list and lead of 1000m as per Technical specification Clause 202. |
| 74 | Removing all types of Hume pipes and stacking within a lead of 1000m including Earthwork and Dismantling of Masonry works as per technical Specification clause 202 |
| 75 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 76 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed watered and compacted complete complying with standard specification |
| 77 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 78 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 79 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Above sill) |
| 80 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (20mm metal) |
| 81 | Cement concrete 1:1.5:3 mix using 20mm & 10mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabrication charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claming extra as directed by the departmental officers complete complying with standard specifications |
| 82 | Supplying and Fabricating and placing in position TMT steel or Ribbed Tor Steel for all Reinforced cement concreteworks as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (TMT or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate), the binding wire shall be supplied by the contractor |
| 83 | Providing and fixing20mm thick Compressible fiber board in expansion joint complete as per Drawing and MORD Technical specification. |
| 84 | Providing and fixingTar Paper for bearing Between Bed Block & Deck slab |
| 85 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 |
| 86 | Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer |
| 87 | Construction of 1.50 span RCC Slab Culvert @ Ch.4057m. |
| 88 | Dismantling of existing structure like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whereever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical specification clause |
| 89 | Dismantling of existing structures like culvers, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all list and lead of 1000m as per Technical specification Clause 202. |
| 90 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unreinforced cement concrete |
| 91 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 92 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed watered and compacted complete complying with standard specification |
| 93 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 94 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 95 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Above sill) |
| 96 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (20mm metal) |
| 97 | Cement concrete 1:1.5:3 mix using 20mm & 10mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabrication charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claming extra as directed by the departmental officers complete complying with standard specifications |
| 98 | Supplying and Fabricating and placing in position TMT steel or Ribbed Tor Steel for all Reinforced cement concreteworks as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (TMT or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate), the binding wire shall be supplied by the contractor |
| 99 | Providing and fixing20mm thick Compressible fiber board in expansion joint complete as per Drawing and MORD Technical specification. |
| 100 | Providing and fixingTar Paper for bearing Between Bed Block & Deck slab |
| 101 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 |
| 102 | Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer |
| 103 | Construction of 1.50 span RCC Slab Culvert @ Ch.4172m. |
| 104 | Dismantling of existing structure like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whereever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical specification clause |
| 105 | Dismantling of existing structures like culvers, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all list and lead of 1000m as per Technical specification Clause 202. |
| 106 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unreinforced cement concrete |
| 107 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 108 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed watered and compacted complete complying with standard specification |
| 109 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 110 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 111 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Above sill) |
| 112 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (20mm metal) |
| 113 | Cement concrete 1:1.5:3 mix using 20mm & 10mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabrication charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claming extra as directed by the departmental officers complete complying with standard specifications |
| 114 | Supplying and Fabricating and placing in position TMT steel or Ribbed Tor Steel for all Reinforced cement concreteworks as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (TMT or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate), the binding wire shall be supplied by the contractor |
| 115 | Providing and fixing20mm thick Compressible fiber board in expansion joint complete as per Drawing and MORD Technical specification. |
| 116 | Providing and fixingTar Paper for bearing Between Bed Block & Deck slab |
| 117 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 |
| 118 | Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer |
| 119 | Construction of 3.0 span RCC Slab Culvert @ Ch.4660m. |
| 120 | Dismantling of existing structure like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whereever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical specification clause |
| 121 | Dismantling of existing structures like culvers, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all list and lead of 1000m as per Technical specification Clause 202. |
| 122 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unreinforced cement concrete |
| 123 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 124 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed watered and compacted complete complying with standard specification |
| 125 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 126 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 127 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Above sill) |
| 128 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (20mm metal) |
| 129 | Cement concrete 1:1.5:3 mix using 20mm & 10mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabrication charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claming extra as directed by the departmental officers complete complying with standard specifications |
| 130 | Supplying and Fabricating and placing in position TMT steel or Ribbed Tor Steel for all Reinforced cement concreteworks as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (TMT or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate), the binding wire shall be supplied by the contractor |
| 131 | Providing and fixing20mm thick Compressible fiber board in expansion joint complete as per Drawing and MORD Technical specification. |
| 132 | Providing and fixingTar Paper for bearing Between Bed Block & Deck slab |
| 133 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 |
| 134 | Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer |
| 135 | Construction of 1.50span RCC Slab Culvert @ Ch.5380m. |
| 136 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 137 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed watered and compacted complete complying with standard specification |
| 138 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 139 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 140 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Above sill) |
| 141 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (20mm metal) |
| 142 | Cement concrete 1:1.5:3 mix using 20mm & 10mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabrication charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claming extra as directed by the departmental officers complete complying with standard specifications |
| 143 | Supplying and Fabricating and placing in position TMT steel or Ribbed Tor Steel for all Reinforced cement concreteworks as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (TMT or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate), the binding wire shall be supplied by the contractor |
| 144 | Providing and fixing20mm thick Compressible fiber board in expansion joint complete as per Drawing and MORD Technical specification. |
| 145 | Providing and fixingTar Paper for bearing Between Bed Block & Deck slab |
| 146 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 |
| 147 | Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer |
| 148 | Construction of 2 span RCC Slab Culvert @ Ch.6585m. |
| 149 | Dismantling of existing structure like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whereever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical specification clause |
| 150 | Dismantling of existing structures like culvers, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all list and lead of 1000m as per Technical specification Clause 202. |
| 151 | Removing all types of Hume pipes and stacking within a lead of 1000m including Earthwork and Dismantling of Masonry works as per technical Specification clause 202 |
| 152 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 153 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed watered and compacted complete complying with standard specification |
| 154 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 155 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 156 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Above sill) |
| 157 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (20mm metal) |
| 158 | Cement concrete 1:1.5:3 mix using 20mm & 10mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabrication charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claming extra as directed by the departmental officers complete complying with standard specifications |
| 159 | Supplying and Fabricating and placing in position TMT steel or Ribbed Tor Steel for all Reinforced cement concreteworks as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (TMT or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate), the binding wire shall be supplied by the contractor |
| 160 | Providing and fixing20mm thick Compressible fiber board in expansion joint complete as per Drawing and MORD Technical specification. |
| 161 | Providing and fixingTar Paper for bearing Between Bed Block & Deck slab |
| 162 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 |
| 163 | Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer |
| 164 | Construction of 1.50 span RCC Slab Culvert @ Ch.6710m. |
| 165 | Dismantling of existing structure like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding whereever necessary, sorting the dismantled material, disposal of unerviceable material and stacking the serviceable material with all lift and lead of 1000m as per Technical specification clause |
| 166 | Dismantling of existing structures like culvers, bridges, retaining walls and other structures comprising of brick masonry including disposal of unserviceable material and stacking the serviceable material with all list and lead of 1000m as per Technical specification Clause 202. |
| 167 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unreinforced cement concrete |
| 168 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 169 | Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick well rammed watered and compacted complete complying with standard specification |
| 170 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 171 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 172 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Above sill) |
| 173 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (20mm metal) |
| 174 | Cement concrete 1:1.5:3 mix using 20mm & 10mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabrication charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick, and with kraft paper without claming extra as directed by the departmental officers complete complying with standard specifications |
| 175 | Supplying and Fabricating and placing in position TMT steel or Ribbed Tor Steel for all Reinforced cement concreteworks as per the design given including cost steel and binding wire in all floors etc, Complete complying with standard specification. (TMT or RTS bar will be supplied departmentally at section stores and cost will be recovered at issue rate), the binding wire shall be supplied by the contractor |
| 176 | Providing and fixing20mm thick Compressible fiber board in expansion joint complete as per Drawing and MORD Technical specification. |
| 177 | Providing and fixingTar Paper for bearing Between Bed Block & Deck slab |
| 178 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 |
| 179 | Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compcting etc complete complying with standard specifications and as directed by departmental officer |
| 180 | Construction of Hard Bed @ Ch.6905 m. |
| 181 | Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material |
| 182 | Cement concrete 1:2.5:5 mix usingHBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed |
| 183 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complying with standard specifications and as directed (Below sill) |
| 184 | Construction of granular sub base by providing well graaded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 4.02 |
| 185 | Providing, laying, spreaing and compacting graded stone aggregate to wet mix macadam specification including premixing the amterial with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/ base course on a well prepared surface and compacting with vibratory roller to achieve the desired density |
| 186 | Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to linesand grade as per drawing and Technical Specification Clause 1501 |
| 187 | Towards the charges for routlinemaintenance of the road work executedunder PMGSY including dressing of bermsby refilling the gully with the earth fromborrow pits, cleaning of wild seasonalgrowth on berms, destilting of side drainsand CD works, white washing guard stones,painting of KM, HM stones, parapets,cutting of branches of trees, refixingdisplaced guard stones, caution boards,speed limit boards etc., with the periodicityfor the above activities as prescribed in IRCSP-20:2002 and as directed by thedepartmental officers except for theconstructional defects which has to berectified by the contractor at his own cost |
| 188 | For the First Year from the date ofcompletion of work |
| 189 | For the Second Year from the date ofcompletion of work |
| 190 | For the Third Year from the date ofcompletion of work |
| 191 | For the Fourth Year from the date ofcompletion of work |
| 192 | For the Fifth Year from the date ofcompletion of work |
| 193 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Sep 02, 2024
11:30 IST
Tender Published
Tender notice published.
CompletedSep 18, 2024
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 18, 2024
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender