|
| 1 | Excavation in foundation in ordinary soil (Loam clay, or sand) including filling lift upto 1.5 meter and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge upto a distance of 30m from the foundation trenches. S.I. No.-251 |
| 2 | Providing and laying Cement concrete 1:4:8 (1 cement : 4 coarse sand :8 graded stone ballast 40mm nominal size) including supply of all materials Labour and T&P etc. required for proper completion of the work and curing complete also including cost of form work in foundation and floorsS.I.NO. 281 |
| 3 | Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered). Depth exceeding 1.5 m but not exceeding 3 m. As per D.S.R. 2.17.2 (Rate = 169.35-17.55% = 139.60) |
| 4 | RCC work in 1:1.5:3 in cement , approved course sand&20mm Gauge approved stone Grit excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G. G.I. binding wire and including neccessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item. S.I. No.- 286 b |
| 5 | Mildsteel or iron in plan work shch as reinforced concrete or reinforced brick work(when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and includingsupply of steel its wastage bend hooks and authorized overlapping shall be measured up to floor two level. S.I. NO.- 504 |
| 6 | S/F 110 mmdia pvc pipe for weep holes in (R.C.C.) wall at site with all labour T&p etc. all complete |
| 7 | Refilling of Earth back side of wall (trunches filling) with excavated available earthincluding all labour T&P SI. NO. 253 |
| 8 | Disposal of surplus earth up to 3 k.m. distance etc. |
| 9 | De- watering of nala by water lifting pump during construction of nala including hire & fuel charge complete with all T&P etc. required preoper completion of work as per direction of E/I/C. |
| 10 | P/F Barricating WITH WOODEN BULLY FOR AVIOD ACCIDENTETC ALL COMPLETE. at AS PER DIRECTION OF . E.I.C. |
| 11 | M-150 class brick work 1:4 cement ,c. sand mortar in foundation etc all completeS.I.NO 305(b) |
| 12 | 12mm thick cement plaster 1:3 cement ,c. sand mortar etc all completeS.I.NO. 580 |
| 13 | Providing Restoration for water Pipe line etc during excusion of work, necessary Sign board, Coution Board etc. |
| 14 | Restoration charge for S.D.B.C. main road. |
| 15 | Restoration charge for C.C. work. |
| 16 | Restoration charge for Rubber moulded Inter Locking road. |
| 17 | Providing and fixing inauguration and Sign board. |