|
| 1 | Material and labour for Servicing split type AC 1.5/2/2.5/3TR/ Capacity including cleaning of filters to remove dust and debris, cleaning of evaporator coils, checking of refrigerant levels, checking of all electrical connections and tighten any loose wires, test the thermostat for porper operation, checking of the drain line and clear itand keepingthe AC unit in satisfactory working condition including small nut bolts, washers complete all as specified and as directed by Engineer-in-Charge. Note :- 1. Replacement of defectivespares will be measured & paidseparately under relevant items and Labour charges for fixing of defective sparesshall deemed to be included in unit rate quoted. |
| 2 | -Ditto- all as per item Ser No 01 above but for Servicing of Window type AC any type capacity |
| 3 | -Ditto- all as per item Ser No 01 above but for Servicing of Cassette type AC any type capacity |
| 4 | S & F as in repairs ofRunning capacitor as per existing MFD and type for window / split AC of capacity 1.5/2/2.5/3 ton as per exiting type Complete all and as specified and directed by Engineer-in-Charge. |
| 5 | S & F as in repairs of Starting capacitor as per existing MFD for window / split /Cassete AC of capacity 1.5/2/2.5/3 ton Complete all as as per exiting type and specified and directed by Engineer-in-Charge. |
| 6 | S & F as in repairs of Relayfor window / split/Cassete AC of capacity 1.5/2/2.5/3 ton Complete as per exiting type and capacity all as specified and directed by Engineer-in-Charge. |
| 7 | S & F as in repairs of Thermostat switch/sensor for window / split AC of capacity 1.5/2/2.5/3 ton MakeIndfass Complete as per exiting type and as specified and directed by Engineer-in-Charge. |
| 8 | S & F as in repairs ofCondenser fan blade for spilt/Cassete Type A.C Cap 1.5/2/2.5/3as per existing shape and size Complete all as specified and directed by Engineer-in-Charge. |
| 9 | M&L fortesting and repairing for replacement of old wornout/burnt wiring windowAC as per existing type of capacity and length complete all as directed |
| 10 | M&L fortesting and repairing for replacement of old wornout/burnt wiring Split AC as per existing type of capacity and length complete all as directed |
| 11 | Supply onlyRemote control for split AC Cap 1.5/2/2.5/3 Tonof any make as per site requirement Complete all as specified and directed by Engineer-in-Charge. |
| 12 | M & L, testing and commissioning ofMain printed circuit board (PCB) with electric accessories and sensors suitable for split AC capacity 1.5/2TonComplete all as specified and directed by Engineer-in-Charge. |
| 13 | M & L, testing and commissioning ofMain printed circuit board (PCB) with electric accessories and sensors suitable for split /Cassete AC capacity 2.5/3 TonComplete all as specified and directed by Engineer-in-Charge. |
| 14 | M & L forPlatic louvers for (Front panel)for Window AC 1.5/2 Ton as per existing at site Complete all as specified and directed by Engineer-in-Charge. |
| 15 | M & L forSelector switch for fan/cooling of Window AC 1.5/2 Ton Complete all as specified and directed by Engineer-in-Charge. |
| 16 | Supply only Suctionand discharge valve set for Split /Cassete AC 1.5/2/2.5/3 Ton capacity of any make as per exisiting Complete all as specified and directed by Engineer-in-Charge. |
| 17 | Supply and fix as in repairs service valve/Flair Nut of 1/2 inch all as per sample approved by Engr-in-charge. |
| 18 | Supply and fix as in repairs service valve/ Flair Nut of 1/4 inch all as per sample approved by Engr-in-charge. |
| 19 | Taking down carefully old unserviceable, burnt out sealed unit compressor from Window/split/casette type AC any type and size by means of unscrewing foundation nut bolts, disconnecting from suction & discharge side mechanically & electrically, of any make and keeping a side for further disposal as directed by Engr-in-Charge for the following :- |
| 20 | Supply, fixing, testing and commessioning of AC sealed unit compressor of 2 Ton Capacity with includingcleaning and removing dust/dirt from the cooling coil condenser coilwith necessary modification (caplary tube etc) &Charging of Gas F-22/R-134A all as directed by EIC. |
| 21 | All as per item No. 20 above but Air Conditioner of capacity 1.5 Ton |
| 22 | All as per item No. 20 above but Air Conditioner of capacity 2.5/3 Ton |
| 23 | Taking down carefully old unserviceable, burnt out fan motor from Window/split/casette type AC any type and size by means of unscrewing foundation nut bolts, disconnecting from suction & discharge side mechanically & electrically, of any make and keeping a side for further disposal as directed by Engr-in-Charge for the following :- |
| 24 | Supply, fixing, testing and commessioning of new blower fan motor unit of window /Split type AC 1.5/2 ton capacity as per existing type and model |
| 25 | -Ditto- all as per item Ser No 24 above but for Split /Cassete type AC 2.5/3 ton capacity of any make and type |
| 26 | Supply, fixing, testing and commessioning of blower fan motor unit after carefully disconnecting form mains and Taking out unserviceable swing fan motor of Split type AC upto to 3 ton capacity of any make and type from any location and supply, installingand testing ofnew swing fan motor as per existing capacity and model |
| 27 | Taking down carefully old unserviceable, burnt out condenser coil from Window/split/casette type AC any type and size by means of unscrewing foundation nut bolts, disconnecting from suction & discharge side mechanically & electrically, of any make and keeping a side for further disposal as directed by Engr-in-Charge for the following :- |
| 28 | Supply, fixing, testing and commessioning of new condenser coli of window Type AC Cap. 1.5 Ton/2 Ton of any make and type all as directed by Engr-in- Charge. |
| 29 | -Ditto- all as per item Ser No 28 above but for split AC /Cassete type AC 1.5 TR of any make and type |
| 30 | -Ditto- all as per item Ser No 28 above but for split AC /Cassete type AC 2 TR of any make and type |
| 31 | -Ditto- all as per item Ser No 28 above but for split AC /Cassete type AC 2.5/3 TR of any make and type |
| 32 | Taking down carefully old unserviceable, burnt out evaporator /cooling coil from Window/split/casette type AC any type and size by means of unscrewing foundation nut bolts, disconnecting from suction & discharge side mechanically & electrically, stroing of refrigerant, brazing, of any make and keeping a side for further disposal as directed by Engr-in-Charge for the following :- |
| 33 | Supply, fixing, testing and commessioning of Evaporator /Cooling coilcoil of window type AC of capacity 1.5 Ton /2 Tonall as per existing type /size existingmake and size all as per specified and directed by Engineer-in-Charge. |
| 34 | -Ditto- all as per item Ser No 33 above but for split /Cassete type AC 1.5/2 TR of any make and type |
| 35 | -Ditto- all as per item Ser No 33 above but for split /Cassete type AC 2.5/3 TR of any make and type |
| 36 | Material & Labour for painting the body of window type AC/Split type AC outer body unit capacity 1.5/2 TR of any make and capacity of colour asper existing. |
| 37 | Taking down unserviceable copper pipe of size 1/4\" and supply & fixing new copper pipe 1/4\" complete including brazing, welding, but bolts and screws of reqd size complete all as directed by Engr-in-Charge |
| 38 | Taking down unserviceable copper pipe of size 1/2\" and supply & fixing new copper pipe 1/2\" complete including brazing, welding, but bolts and screws of reqd size complete all as directed by Engr-in-Charge |
| 39 | Taking down unserviceable copper pipe of size 3/8 and supply & fixing new copper pipe 1/2\" complete including brazing, welding, but bolts and screws of reqd size complete all as directed by Engr-in-Charge |
| 40 | Material & labour for detecting the leakages of gas of window AC capacity 1.5/2 TR from any location and rectified/stopped the leakages by gas welding or by any other manner and make it functionngas directed by Engr-in-Charge |
| 41 | Material & labour for detecting the leakages of gas of split /Cassete type AC 1.5/2/2.5/3 TRfrom any location and rectified/stopped the leakages by gas welding or by any other manner and make it functionngas directed by Engr-in-Charge |
| 42 | Material and labour for Charging of only RefrigerantGas F-22/R-134a in window type /Split /CasseteType AC Unit of capacity 1.5 Ton including testing and commissioning complete in satisfactory working condition. |
| 43 | Material and labour for Charging of only RefrigerantGas F-22/R-134a in window type /Split /CasseteType AC Unit of capacity 2Ton including testing and commissioning complete in satisfactory working condition. |
| 44 | Material and labour for Charging of only RefrigerantGas F-22/R-134a in window type /Split /CasseteType AC Unit of capacity 2.5/3 Ton including testing and commissioning complete in satisfactory working condition. |
| 45 | M & L for Charging of only RefrigerantGas F-22/R-134a in Split /Cassete Type AC Unit of capacity 2.5 /3Ton including testing and commissioning complete in satisfactory working condition. |
| 46 | Material and labour for taking downof split type AC any type and Capacityduly storing of its refrigerant, disconnecting its both the copper tubes from indoor and out door unit carefully, taking its inner and outer unit and refixing the same in other side of wall/location as directed by EIC , duly filling of make up refrigerant as per desired pressure, minor brazing/welding in copper tubing, making all elect connections as before and testing all as spd and direted by EIC |
| 47 | Material and labour for taking downold UNSV AC Stand and refixing of new stand for outer unit of Split AC (set of 02) as per the existing size for split type AC 1.5/2/2.5/3TR Capacity duly fixing it on wall with nut,bolt and washer as per desired pressure, minor brazing/welding all as spd and direted by EIC |
| 48 | Material and labour for taking downold UNSV insulation pipe of split AC from inlet and out let copper tubing by storing the Referigerant incl and after fixing of new insulation restore the referigerant as earlier by making connection as before all as spd and direted by EIC |
| 49 | Supply and fixing of Single pole and neutral enclosure with a two pin and earth plug and socket complete with all as spd and directed in EIC. |
| 50 | Material and labour for sub main wiring with two single core PVC insulated unsheathed copper conductorcable 4 sqmm drawing in and existing PVC conduit along with one additional PVC wire of copper conductor of 2.5 sqmm for earth continuity conductor of any length and making good the disturbed surface complete all as specified and directed by EIC. |
| 51 | M&L in replacement of air filter made out of nylon wire mesh moulded in plastic complete suitable for existing old filter\"s size and shape, as directed for 1.5/2 TR capacity of split type AC |
| 52 | Removing of old UNSV outdoor unit and supply and fixing as in replacement new outdoor AC unit with one new out door unit of 2 TR capacity duly assembled the following items :- consisting a 2-ton split air conditioner (AC) outdoor unit, consisting of a Compressor2 TR capacity, duly charged with refrigerant gas, Condenser Coil to dissipate the heat from the refrigerant into the outside air, a Fan and Motor matching the 2 TR capacity, a Expansion Valve of suitable size to match the 2 TR capacity, Refrigerant Lines to connect the indoor and outdoor units suitable for a 2 TR system, all compontent to be duly connect with each as a required manner along with Electric Panel and Wiring, Printed Circuit Board (PCB), Mounting Brackets and Hardware, Necessary material for securely fixing the unit, Drain Pipe of suitable capacity to carry away condensation,Insulation Material for refrigerant lines to ensure efficiency all control box and Relays for managing the operation of the outdoor unit, Vibration Absorbe to minimize noise and vibration ,the whole items to be protected and placed in a suitable size unit/outer cover complete all as spd and directed by EIC. |
| 53 | Taking downfor servicing of Door air courtain any type and size including cleaning of blower / fan motor, air filter, nozzle or air outlet, motor for powers the blower or fan, control panel, internal wiring and keepingthe door curtain unit in satisfactory working condition including small nut bolts, washers complete all as specified and as directed by Engineer-in-Charge. Note :- 1. Replacement of defectivespares will be measured & paidseparately under relevant items and Labour charges for fixing of defective sparesshall deemed to be included in unit rate quoted.for this item |
| 54 | M & L for testing and commissioning ofMain printed circuit board (PCB) with electric accessories and sensors suitable for door air curtain any type and size Complete all as specified and directed by Engineer-in-Charge. |
| 55 | Supply, fixing, testing and commessioning of blower fan motor unit after carefully disconnecting form mains and Taking out unserviceable fan motor/ blower motorof door air curtain any type and size from any location and supply, installingand testing of new fan motor as per existing capacity and model |
| 56 | Taking downfor servicing of walk-in-cold room of any Capacityand make including cleaning of insulated panesl, compressor, evaporator, condenser unit, door , lighting , temperature control system such as thermostats , defrost system, drainage system and keepingthe AC unit in satisfactory working condition including small nut bolts, washers complete all as specified and as directed by Engineer-in-Charge. Note :- 1. Replacement of defectivespares will be measured & paidseparately under relevant items and Labour charges for fixing of defective sparesshall deemed to be included in unit rate quoted.for this item |
| 57 | Supply onlyThermostat switch for walk in cold room system of any capacityComplete all as specified and directed by Engineer-in-Charge. |
| 58 | Supply onlyCondenser fan blade for walk in cold room system of any capacity as per existing shape and size Complete all as specified and directed by Engineer-in-Charge. |
| 59 | Supply only Copper filter double capillary pencil type for walk in cold room system of any capacityComplete all as specified and directed by Engineer-in-Charge. |
| 60 | Supply onlyWiring kit for walk in cold room system of any capacityComplete all as specified and directed by Engineer-in-Charge. |
| 61 | Supply onlyMain printed circuit board (PCB) with electric accessories and sensors suitable for walk in cold room system of any capacity Complete all as specified and directed by Engineer-in-Charge. |
| 62 | Disconnecting from mains and Taking out existing unserviceable sealed unit from the walk in cold sotrage unit of capacity 2/2.5 TR , of any make any type from any locationandSupply , Installingand testing of new sealed unit compressor withincludingcleaning and removing dust/dirt from the cooling coil condenser coilwith necessary modification (caplary tube etc) &Charging of Gas F-22/R-134A and commisioning as directed by Engg-in-Charge , Note :- Transportation Charges From siteto trade workshop and back to original location after repair shall be deemed to be included in unit rate quoted. |
| 63 | Disconnecting from mains and Taking out existing unserviceable sealed unit from the walk in cold sotrage unit of capacity 4 TR , of any make any type from any locationandSupply , Installingand testing of new sealed unit compressor withincludingcleaning and removing dust/dirt from the cooling coil condenser coilwith necessary modification (caplary tube etc) &Charging of Gas F-22/R-134A and commisioning as directed by Engg-in-Charge , Note :- Transportation Charges From siteto trade workshop and back to original location after repair shall be deemed to be included in unit rate quoted. |
| 64 | S&F in replacement of indoor discharge fan with for walk-in cooler complete as per existing type of following size as directed by Enginner- in-charge:- |
| 65 | (a) Size 10\" |
| 66 | (b) Size 12\" |
| 67 | S&F in replacement of HP/LP cut off, KP-15 Make - Danfoss/Indfoss for Walk-in-Cooler of any type |
| 68 | S & F in replacement of Digital Sub-zero thermostat suitable for the cold storage & programe the thermostat for auto cut-off including all wiring complete as directed |
| 69 | Disconnecting form mains and Taking out unserviceable fan motor/ blower motorof Walk in cold storage unit any type and size from any location and supply, installingand testing it by new fan motor as per existing capacity and model |
| 70 | Disconnecting from mains and Taking out unserviceablecondenser coil of Walk in cold storage unit any type and size from any location and supply, installing and testing it by new condneser coil as per existing capacity and makeas directed by Engr-in- Charge. |
| 71 | Supply and fixingin replacementofEvaporator /Cooling coil of Walk in cold storage unit any type and size from any location all as directed by Engr-in- Charge. |
| 72 | Material & labour for detecting the leakages of gas of Walk in cold storage unit any type and size from any location and rectified/stopped the leakages by gas welding or by any other manner and make it functionngas directed by Engr-in-Charge |
| 73 | Charging only RefrigerantGas F-22/R-134a in Walk in cold storage unit any type and size from any location of capacity 2/2.5 Ton including testing and commissioning complete in satisfactory working condition. |
| 74 | Removing after disconnecting all electric and refrigerent connection of old and UNSV wall mounted blower unit/fan coil unit and supply fixing , testing and commissioning of new wall mounted blower unit/fan coil unit of capacity 2 TR split AC, comprising the following :- Evaporator Coil ,Blower/Fan, Air Filter, Thermostat, Swing Motor to Controls the direction of the airflow,Electric Control Panel and Wiring, Display Panel Showing the operating status and settings, Control Box and Relays for managing the operation of the indoor unit, Insulation Material for refrigerant lines to ensure efficiency, Copper Tubing to Connects the indoor unit to the outdoor unit, Drain Pan and Pipe, Mounting Brackets and Hardware for necessary for securely fixing the unit the all accessories to be mounted and connected properly in a suitable size AC Indoor unit casing complete all as spd and directed by EIC. |
| 75 | Disconnecting from mains and Taking downfor servicingof Refrigerator/Deep freezerofCapacity 165 to 310 Ltrs including detecting the leakage of gas and refilling,cleaning of cooling coil, condenser, compressors, with vacuum cleaner OR cleaning solution includingcheckingthe servicibility of electrical/electronic circuits relays, wiring kit, thermostat switches knobs, etc., andkeepingthe Refrigerator unit in satisfactory working condition all as specified and as directed by Engineer-in-Charge.Note :- 1. Replacement of defectivespares for refrigerator /deep freezer will be measured & paidseparately under relevant items and Labour charges for fixing of defective spare parts shall deemed to be included in unit rate quoted of for this item. |
| 76 | Supply onlyThermostat switch used with refrigerator/deepfreezer with Knob |
| 77 | Supply only Starting relay 1/6 H.P.Open type used with refrigerator/deepfreezer with O.L.P. |
| 78 | Supply onlyStarting relay 1/8 H.P. open type used with refrigerator/deepfreezer with O.L.P. |
| 79 | Supply only copper filter single capillary pencil type used with refrigerator/deepfreezer. |
| 80 | Supply only Door Lock for refrigerator 200to 310 ltrs |
| 81 | Supply only Door switch for refrigerator 200 to 310 ltrs |
| 82 | Supply onlyInterior light fittings with bulb used with refrigerator/deepfreezer. |
| 83 | Supply only Door handle suitable for 200 to 310 Ltrs used with refrigerator/deepfreezer. |
| 84 | Supply only compartment Glass used with refrigerator/deepfreezer. |
| 85 | Disconnecting from mains and taking down the unserviceable compressor sealedunit of Refrigerator of any make and type and providing and fixing New Compressor suitable for 165 to 310 Ltr Refrigerator/deefreezer& testing and charging of therefrigent gas F-22 , R-134A and all other copper tubes, capillary and filter and put in working condition all as directed by Engineer-in-Charge. Note :-The Unit Rate quoted by the Contr shall include cleaning of condenser, Nuts & bolts and making necessary connection and testing complete. |
| 86 | Material and labour for Charging only of gas refrigerant F 22 R-134A after detecting or rectify the leakages including cutting welding for Deepfreezer & Refrigerant capacity 165 Ltrs to 310 Ltrsof any Make complete all as specified and directed by Engr-in-charge. |
| 87 | Supply and Fixing Voltage Stablizer for automatic operation single Phase naturally air cooled indoor type and design and input variation between170 volt to 250 volt with output voltage stablized at 230volt with accuracy +/- 2.5% and of capacity 4 KVA complete , V Guard VG 400 or equvilent all as specified and as directed |
| 88 | Supply and Fixing Voltage Stablizer for automatic operation single Phase naturally air cooled indoor type and design and input variation between170 volt to 250 volt with output voltage stablized at 230volt with accuracy +/- 2.5% and of capacity 5 KVA complete , V Guard VG 500 or equvilent all as specified and as directed |
| 89 | Disconnecting from mains and Taking downfor servicingofWater Cooler ofCapacity upto 150 Ltrs including cleaning of cooling coil, air filters , condenser, compressors, fan motor etc with vacuum cleaner OR cleaning solution includingcheckingthe servicibility of electrical/electronic circuits relays, wiring kit, thermostat switches knobs,fan andblower, etc., andkeepingthe Water coolerunit in satisfactory working condition all as specified and as directed by Engineer-in-Charge.Note :- 1. Replacement of defectivespares will be measured & paidseparately under relevant items and Labour charges for fixing of defective spare partsshall deemed to be included in unit rate quoted for this item. |
| 90 | Supply only Over load protect device for 40 to 150 Lts Cap. Water cooler |
| 91 | Supply onlyStarting relay open type/Box type suitable for 40 to 150 Ltr water cooler |
| 92 | Supply onlyStarting Capacitor 80-100 MFD for Water cooler . |
| 93 | Supply onlyRunning Capacitor 25 MFD for water cooler. |
| 94 | Supply only DrainHose pipe 40mm for water cooler. |
| 95 | Supply onlyCondenser fan blade duly match with the existing system for fan Motor 1/10/1/16 HP for water cooler. |
| 96 | Supply onlyCopper filter penciltype single / Double Capillary for water cooler. |
| 97 | Supply onlySelf closing/pushtaps CP for water cooler Cap 40 to 150 Ltr |
| 98 | Disconnecting the electric and Water connections and taking out the existing unserviceable compressor of any make from Water Cooler storage type capacity40 to 150 Lts from any location andsupply and installing it by the company made new sealed unit compressorof similar cap, cleaning of condenser by machine doing vacum the fully system and supply and charging of oil and gas and other necessary lubricants including reconnecting the electric and water connections& testing as directed by Engr-in-charge. |
| 99 | Disconnecting the electric mains and Taking out unserviceable condenser fan motor 1/10, 1/16 HP from water cooler cap.40 to 150 Ltr and supply and replace with new motor single phase AC 220 V of same Cap including reconnecting the electric connections and testing . complete all as specified and directed by Engineer-in-Charge. |
| 100 | Disconnecitng the mains and Taking out the unserviceable condenser coil fins type and S&F new condenser coil fins type as per existing size & patterns for Water Coolers 40 to 150Ltrs Cap. |
| 101 | Dismantling the evaporator/cooling coil of water cooler capacity 40 to 150 Ltrs, checking the leakages of gas and rectify the leakages by gas welding or as other mannerand refixing complete all as specified and directed by Engineer-in-Charge. |
| 102 | Material and labour for Charging only of Gas F-22/R134a for the water cooler Cap. 40 to 150 ltrs including testing and satisfactory commissioning |
| 103 | Taking out the Water Cooler Tank from water cooler 40 to 150ltrs cap.& repair the tank with brazing welding etc to stop the leakage of tank incl provn the insulating material as per existing type and size etc and repair to cooling coil and refixing as per original position & testing and commissioning |
| 104 | Cleaning & removing the existing paint ofWater Coolers Cap.40 Ltrs by rubbing & preparing the surface smooth & applying one coat of primer and two coats of synthetic enamel paint by spray gun of colour as approved by E-in-Charge. |
| 105 | M & L for repair of Topdoor made out of stainless steel with the existing guage sheet with handle and locking arrangement with double keys including door gasket and recommended insulation material and PVC inner sheet of suitable thickness for 40 to 150 Ltr capacity water cooler as per eixsiting size and shape, welding work nuts bolts & washerscomplete all as specified and directed by Engineer-in-Charge. |
| 106 | Supply and Fixing of PVC connections 15 mm dia bore with PTMT nuts of length 600 mm including taking down the unserviceable PVC connections. |
| 107 | Supply and FixingStop vlave cast copper alloy screw down high pressure with crutch or butterfly handle screwed both ends for iron pipe 15 mm dia boreincluding taking down old unsv /rusted stop valve of any size/make complete all as specified and directed by Engr-in-charge. |
| 108 | M&L for removing of old unserviceable stabilizer of capacity upto 3 KVA from the site, transporting it to the workshop, replacement of unserviceable spares such as control transformer, main transformer, voltmeter, relay, control board, etc as required and getting back the stabilizer at site and fiixing at the same position and checking it for its workablility as specified and directed |
| 109 | M&L for removing of old unserviceable stabilizer of capacity 4/5 KVA from the site, transporting it to the workshop, replacement of unserviceable spares such as control transformer, main transformer, voltmeter, relay, control board, etc as required and getting back the stabilizer at site and fiixing at the same position and checking it for its workablility as specified and directed |
| 110 | Routine maintenance services of central air conditioning plant of any capacity by checking and cleaning Air filters, adust thermostat settings, tighten of all electric connection, check and cleanning of condensate drain blockage, monitoring of refrigerant levels and check of leaks, clean evoporaor and condenser coils, inspect belts and pulley for wear and proper tension and replacement, checking of insulation on refrigerant linges, checking and maintainance of compressor assembly, cleaning of air handling unit complete all as spd and directed. All small nut, bolts, washers , belts any type and size will be included in the Monthly job. Note :- All other spare parts such as refrigerent, Oil etc will be measured and paid seperately. |
| 111 | Charging of RefrigerantGas F-22/ in air conditioner plant including testing and commissioning complete in satisfactory working condition all as spd and dir by EIC. |
| 112 | Replacement of compressor oil including drain out existing oil, testing & labour for filling oil ,non freezing in AC plant complete all as specified and as directed. Note- (b) Only qty of filled oilaccounted as per compressor capacity shall be considered for payment purposes.(b) While filling , if any leakage/wastage of oil noticed/occured, payment for that qty shall not be accounted for. |