Tender For Repair To Drain, Grass Cutting Brush Cutter And Certain Maintenance Etc At Shoulders Of Runway Taxi Track At Afs Kumbhirgram
Tender Overview
Project Description
Repair To Drain, Grass Cutting Brush Cutter And Certain Maintenance Etc At Shoulders Of Runway Taxi Track At Afs Kumbhirgram
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 05-Sep-2024 | Corrigendum No 1 | BOQ | 12-Sep-2024 |
| 2 | 12-Sep-2024 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 19-Sep-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | Taking down cement plaster on brick walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. |
| 2 | Demolition of concrete (Un-reinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. |
| 3 | Material and labour for PCC type B1 using 20mm graded crushed stone agg as in benching, coping for drain, etc including necessary form work, complete all as specified and directed. |
| 4 | Material and labour for plain cement concrete (1:3:6) type C2using 40mm graded crushed stone aggregate as in surface channel/drain, complerte all as specified and directed. |
| 5 | Material and labour 75 mm thick cement concrete (1:3:6) type C1 using 20mm graded stone aggregate in floors and finished cement concrete surface even and smoth without using extra cement etc complete all as specified and as directed. |
| 6 | Material and labour Cement Concrete(1;3:6) type C2 using 40mm grade stone aggragete in foundation complete all as specified and as directed. |
| 7 | Demolition of brick work built in cement mortor including all quoins, pillars etc complete all as specified and as directed. |
| 8 | Material and labour brick work with sub class \"B\" brick straight or curved on plan exc 6m mean radius built in CM 1:6 complete all as specified and directed. |
| 9 | All as per item no 08 here-in-before, but except bricks. |
| 10 | Demolition of brick work laid flat or on edge or brick tiles in floors, channels, Kerbs aprons etc laid bedded and pointed complete. |
| 11 | Material and labour for brick work with sub class \"B\" bricks laid flat in side of drain/channel, jointed and pointed in cement mortar (1:6), complete all as specified and as directed. |
| 12 | All as per item No 11 here-in-before, but except bricks. |
| 13 | Material and labour for brick work with sub class \"B\" laid onedge as in drains bedded and jointed in cement mortar 1:6complete all as specified and directed. |
| 14 | All as per item No 13 here-in-before, but except bricks. |
| 15 | Extra for forming fair finished drain or channel 30 cm inner girth in cement concrete, using extra cement, including forms moulds, mitred/stopped ends etc complete all as specified and directed. |
| 16 | Material and labour for 15mm thick rendering on fair faces of brick work or concrete surface in cement mortar 1:6 finished even and smooth without using extra cement, complete all ascomplete all as specified and directed. |
| 17 | Preparation of old painted plastered/concrete surfaces of any description over 10 cm width or girth and applying one coat of syntheticenamel paint (First quality) complete all as specified and directed. |
| 18 | Dressing of ground by cutting/removing vegetation, scrapping, cleaning of all grass, shrubs,bushes,weeds, trees and saplings not exceeding 30cm in girth (Measured at a height of one metre above the ground level) on either side of Runway, Taxi-track and other places by deploying Bush grass cutterwith operators including fuel and lubricant etc all as directed by Engineer-in-Charge. Grass/ bushes etc shall be removed from the site where directed but outside the periphery of area under clearance and useful materials shall be stacked andis property of the MES (one Bush grass cutter with one operator shall be measured as one unit ) Note:1. Minimum 03 units of Bush grass cutterwithoperators ( 3 ltrs petrol carry each bush cutting machine)shall be deployed at site. The requirement may vary as per quantum of work and the same will be communicated telephonically two days in advance.2All other notes as per contract provision will also be applicable |
| 19 | Dressing of ground by cutting/removing vegetation, scrapping, cleaning of all grass, shrubs,bushes,weeds, trees and saplings not exceeding 30cm in girth (Measured at a height of one metre above the ground level upto 10-15 feet around the light of Runway/ Taxi-track) at apron and other places as directed by Engineer-in-charge completely by manual labour deploying 04 Nos labour minimum per day (Labour may vary from 04 Nos to required nos depending upon the quantum of work ) including making up surface all as directed by Engineer-in-charge.Grass/ bushes etc shall be collected and removed from the site by mechanical transport where directed but outside the periphery of area under clearance and useful materials shall be stacked andis property of the MES . Note:1. Contractor\"s quoted rates are deemed to be inclusive of necessary tools to the labours as per working requirement2. All other notes as per contract provision will also be applicable3. Minimum 4 labour for drain cleaninig and 02 labour for grass cutting for Runway/Taxi track shoulders. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.