}

Tender For Annual Maintenance Contract For Boiler Non Pressure Part Of Stage 1 Btps, hooghly-West Bengal

West Bengal Power Development Corporation Limited has published Tender For Annual Maintenance Contract For Boiler Non Pressure Part Of Stage 1 Btps. Submission Date for this Tender is 18-09-2024. Blowers Tenders in hooghly West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

44913872
Corrigendum : Tender For Annual Maintenance Contract For Boiler Non Pressure Part Of Stage 1 Btps
Tender
Indian
West Bengal
Hooghly
18-09-2024

Tender Details

Tender For Annual Maintenance Contract For Boiler Non Pressure Part Of Stage 1 Btps-- 1 Maintenance of Boiler pressure parts Unit 2 2 ECONOMISER TUBE JOINTTube OD 51 mm, Thickness 4.8 mm, Material: SA 210 GR.C orequivalent 3 INSERT AT FURNACE WALL, GOOSE NECKS-PANNEL & ROOF TUBE (1 insert = 02 nos. joint) Tube OD:63.5 mm TO 69.9 mm, Thickness from 5.1 to 6.3 mm, Material:SA 210 GR. A or equivalent 4 JOINT AT SATURATED SCREENROOF & SIDE WALL, SCREEN TUBE, PRIMARYSUPERHEATER TUBE, SECONDARY SUPERHEATER TUBE.(OD: 63.5 mm, Thickness: 5 mm upto 6.9 mm, Material:SA213T11 OR EQUIVALNT) 5 JOINT AT REHEATER TUBE/INSERT AT FURNACE WALL, GOOSE NECK, S-PANEL &ROOF TUBE. 6 Second pass scaffolding 7 Economiser coil liftingrepairing,fitting & jointing with proper alignment for unit2 (ifrequired for preventive checking beyond leakage area) 8 Primary & secondary superheater coilpulling, inspection and proper alignment of coil & panelwith clit and support welding of unit2 (if checkingrequired for preventive inspection) 9 Maintenance of Boiler Pressure Parts Unit 5 10 LP water CleaningEconomizer Zone, PSH & PRH 11 Joint for lnsertion of water wall tube,cage rear wall below main cavity & baffle wall tube below maincavity,Size: 63.5X5.4, Mat: BS3059/45S2 or 5A210Gr.C. 12 Insertion joint for division wall tubeSize: 82.5X7, Mat: BS3059/45S2; or SA210Gr.C 13 Joint for lnsertion of furnace roof,cage rear wall & baffle wall tube above main cavity, Size:63.5X4.8, Mat: BS3059/620S2 or SA213T11 14 Joint for Insertion of economiser tubeSize: 38.1X3.6, Mat: BS3O59/45S2 or SA210Gr.C 15 Insertion joint of PSH bottom & middleSize:57.1X6, Mat: BS3059/620S2 or SA213T11 16 Joint for Insertion of PSH top bank tubetube, Size: 63.5X3.6, Mat: BS3059/33S2 orSA210Gr.C 17 Insertion joint of PRH bottom & middleSize: 57X3.2, Mat: BS3059/620S2 or SA213T11 18 Joint for lnsertion of PRH top bank tubeSize: 57X3.2, Mat: BS3059/620S2 or SA213T11 19 Joint for lnsertion of PLSH and FSHinlet tube, Size: 44.5X7, Mat: SA213T22 20 Joint for lnsertion of FSH & FRH tubeSize: 50.8X3.6, Mat: SA213T91 21 Economiser/PSH/PRH coil lifting,inspection repairing and fitting with proper alignment (if requiredfor preventive inspection beyond the leakage area) 22 Platen SH, FSH, FRH coil pullinginspection and proper alignment of coil and panel with clit andsupport welding 23 Second pass scaffolding Per 6 Meter 24 Servising of Wall blower 25 Common work for Unit 2 & Unit 5 26 Stress Relieving 27 Radiography 28 Removal and refitting of refractory 29 Replacement of high pressure valve size upto 2 30 Replacement of high pressure line(1/2 to 4) (Unit of 01 Number includes two joints) 31 Deinsulation & insulation with claddingof wall, casing and pipe and other area of boiler 32 HP Valve Welding from 50 NB upto 100 NBpipe 33 HP valve gland packing replacementupto 6 34 HP valve servicingincluding gland packing & bonnet seal replacement upto 4 35 D-metering of boiler tubeat any area of boiler for thickness measurement (minimum survey150 nos./day) 36 Minimum mobilization chargeif total executed job value less than Rs.15000.00 37 Vertical scaffoldingfor approaching Roof Tube/ Reheater/ Secondary SH (Per 6 MeterVertical) for Stage I & for approaching Furnace/ Roof Tube/Pendent Reheater/ Platen/FSH & Division wall (Per 6 MeterVertical) for Stage II 38 Horizontal scaffolding for approaching Platen SH/SCW/ Roof Tubes/Furnace (Per 6Meter horizontal) for Stage I & for approaching RH/ platen SH /Final SH / Divisional wall/SCW/ Roof Tubes/ Furnace (per 6 meter horizontal)for Stage II 39 Guard Tube and Guard PlateRemoval, Fabrication and Fitting 40 Build up in eroded Tubesas per requirement 41 Repairing of skin casing 42 Fabrication of bends of any degree of any boiler tube 43 Fitting and welding of tube attachment wherever require 44 Membrane strip fitting & welding 45 Fabrication and erection of Steel itemsby MS plate/ MS Angle/ MS channel/ I Beam etc. 46 Boiler metal temp TC & mounting replace 47 Thermowell replacement in HP line

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 14-09-2024 TENDERTITLEMODIFICATION Other 18-09-2024

Key Value

Document Fees
Refer document
Tender Value
INR 21.71 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail