Name of Work: Construction of Pipe Culvertat Thirumanancheri - Kurumbivayal Joint road in Thirumanancheri Panchayat
Sl. No.
Item Description
1
Construction of Pipe Culvertat Thirumanancheri - Kurumbivayal Joint road in Thirumanancheri Panchayat
2
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20A for as per TWAD board officersfoundation etc complete
3
Cement Concrete in 1 :4: 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
4
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)for column
5
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum.
6
Supply of NP3 Class RCC Pipe confirming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including ding,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications
7
Labour Charges for of 900mm dia NP3 RCC Pipe Fixing chargesincluding cost and conveyance of all charges etc
8
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.