|
| 1 | Erection of Double pole Transformer structure complete set |
| 2 | Erection of Transformer inclucing loading and unloading 100KVA/22KV DT |
| 3 | Transporting of Distribution transformer 100KVA/22KV DT |
| 4 | Erection of Busbar arrangement |
| 5 | Erection of single pole Transformer structure complete set |
| 6 | Loading & unloading of 16 KVA DT |
| 7 | Erection of Transformer 16 KVA/22KV DT |
| 8 | Transporting of distribution transformer 16KVA/22KV DT |
| 9 | Erection of Double pole Tapping structure complete set |
| 10 | Loading & unloading of9mtr PSC Pole |
| 11 | Excavation of normal groundand Erection of 9mtr PSC Pole |
| 12 | Transporting of 9mtr PSC Pole from Road Side to Pole pit |
| 13 | Erection of 4\".6\"V cross arm |
| 14 | Erection of Tapping channel cross arm |
| 15 | Erection of HT TI fitting |
| 16 | Fixing of 11KV Polymer Disc with metal parts |
| 17 | Erection of HT pin insulator |
| 18 | HT Line Stringing,Sagging binding of conductor7/3.15 AAAC including transporting of materials from Road side to site with LC 50% |
| 19 | Erection of LT Side arm |
| 20 | Erection of 3phase cross arm |
| 21 | Erection of Sphase cross arm |
| 22 | Erection of LT Pin insulator |
| 23 | Erection of LT Shackle with metal parts |
| 24 | LT Line Stringing,Sagging binding of conductor7/2.59 ACSR |
| 25 | Changing of pin point into cut point LT |
| 26 | Alteration of Clamp |
| 27 | Excavation & Erectionof stay set normal ground |
| 28 | Dismantling of Double pole Transformer structure complete set |
| 29 | Dismantling of Transformer inclucing loading and unloading 100KVA/22KV DT |
| 30 | Erection of DT Centre Support |
| 31 | Dismantlingof 9M PSC Pole |
| 32 | Dismantlingof 8M PSC Pole |
| 33 | Dismantlingof4\".6\"V cross Arm |
| 34 | Dismantlingof HT Pin insulator |
| 35 | Dismantlingof HT Disc |
| 36 | Dismantlingof Tapping channel |
| 37 | Dismantlingof HT TI Fitting |
| 38 | Dismantlingof 3 Phase Cross Arm |
| 39 | Dismantlingof LT Pin & insulator |
| 40 | Dismantling of LT Shackle with metalpart |
| 41 | Dismantlingof ACSR conductor 7/2.59 |
| 42 | Dismantlingof ACSR conductor 7/3.15 |
| 43 | Dismantlingof Stay set complete |
| 44 | Dismantlingof Alumunium knob |
| 45 | Dismantling of Bus Bar arrangement |
| 46 | Grill Seperation |
| 47 | GST.@18% should be Entered by the Bidder |