Package: C-3 Project Management Consultant (Pmc) For Tripura Power Generation Limited (Tpgl)Under Tripura Power Generation Upgradation & Distribution Reliability Improvement Project (51308-009)
Tender Overview
Project Description
Package: C-3 Project Management Consultant (PMC) for Tripura Power Generation Limited (TPGL)under Tripura Power Generation Upgradation & Distribution Reliability Improvement Project (51308-009)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Sep-2024 | ClarificationPMC001 | Other | 25-Sep-2024 |
| 2 | 17-Sep-2024 | ClarificationPMC002 | Other | 25-Sep-2024 |
| 3 | 23-Sep-2024 | ClarificationPMC003 | Other | 25-Sep-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | Competitive Components |
| 2 | Remuneration (Key Experts) |
| 3 | International Consultants |
| 4 | Project Manager / Team Leader |
| 5 | Mechanical Engineer (gas and steam turbines) |
| 6 | Mechanical Engineer (heat recovery steam generator and balance of plant) |
| 7 | Electrical Engineer |
| 8 | Instrumentation and Control Engineer |
| 9 | Chemical Engineer |
| 10 | National Consultants |
| 11 | Project Manager / DeputyTeam Leader |
| 12 | Mechanical Engineer (gas and steam turbines) |
| 13 | Mechanical Engineer (heat recovery steam generator and balance of plant) |
| 14 | Electrical Engineer |
| 15 | Substation and Power Transmission Engineer |
| 16 | Instrumentation and Control Engineer |
| 17 | Civil Engineer |
| 18 | Senior Environment Safeguard Specialist |
| 19 | Senior Health and Safety Specialist |
| 20 | Senior Ecologist |
| 21 | Senior Labour Specialist |
| 22 | Resident Health and Safety/Labor Expert |
| 23 | Residential Environmental Specialist |
| 24 | Residential Ecology Specialist |
| 25 | Social and Gender Specialist |
| 26 | Procurement Expert |
| 27 | Commissioning Engineer |
| 28 | Chemical Engineer |
| 29 | Finance Expert |
| 30 | IT Expert |
| 31 | Capacity Building and HR Expert |
| 32 | Remuneration ( Non Key Experts) |
| 33 | Full-Time Residential Expert 1 |
| 34 | Full-Time Residential Expert 2 |
| 35 | Full-Time Residential Expert 3 |
| 36 | Reimbursable Expenses / Out-of-Pocket Expenses (OPE) |
| 37 | Per Diem Allowance (International Expert) |
| 38 | Local Per Diem (National Experts) |
| 39 | International Air Travel |
| 40 | National Air Travel |
| 41 | Miscellaneous Travel Expenses |
| 42 | Land Transportation/Vehicle Hire |
| 43 | Communications |
| 44 | Report Preparation, Production and Transmission |
| 45 | Others: Establishment of Web-Based Project Management System |
| 46 | Others: Maintenance services for Web-Based Project Management System (including cloud hosting and communication charges) |
| 47 | Non Competitive Components |
| 48 | Provisional Sums (for Time-based contract only) |
| 49 | Equipment: Laptop for PMU, other equipment, furniture, etc. |
| 50 | Seminars, Workshops, Training (including Survey and Studies) |
| 51 | Contingency (for Time-based contract only) |
| 52 | Contigency |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender