| 1 | Poultry, Goatery, Rice & Dal Mill Project |
| 2 | FoundationFor 2500 Sqft Area |
| 3 | Brick Wall – Two WallsWith Cement Plaster and Painting.240 x 2= 480Sqft |
| 4 | Fabrication Work Round Pipe, Grouting, Wall Plate,Purlins, Rafter, Ridge Board, Truss, Cement Sheets Roof |
| 5 | Chaining Net Fitting 1600 Sqft. |
| 6 | PCC – Area-2500SqftMurum Filling , Levelling, Compaction 4” PCC – M15 |
| 7 | Chicks Drinker Small |
| 8 | Chicks Feeder Small |
| 9 | Adult Hen/Cock Drinker |
| 10 | Adult Hen/Cock Feeder |
| 11 | Feeder And Drinker Rope For Hanging |
| 12 | 1000 Ltr Water Tank For Water Supply with Plumbing |
| 13 | Feed Storage Stand 10 x 3 |
| 14 | Cost for 2000 Broiler Chicks |
| 15 | Feed For the Birds for 45 DaysIt Includes Pre-Starter, Starter and Finisher |
| 16 | Medicines per Bird |
| 17 | Vaccination per Bird for 6 Months |
| 18 | Waste Management4 Pit of Size-10 x 10 with Brick wall And Cement Plaster for Waste Management.Pit will be used for collection of Manure and waste Material of the Farm. |
| 19 | To establish hatching units of 7,500 egg setter and 2500 Hatcher capacity.Construction of hatchery Room Room Size – 20’ x 15’ Varanda – 20’ x 5’ (Asbestos Roofing With Ceiling, Damp Proof Flooring) |
| 20 | Construction of washing tank with drainage facility within the hatcher room 5x5 |
| 21 | Dug well, overhead tank of 500 liter capacity, 0.5 HP pump with pipeline fixation |
| 22 | Electrification along with electrical fittings |
| 23 | Diesel Genset 50 kva |
| 24 | Incubator and Hatcher 7500 Incubator and 2500 hatcher capacity |
| 25 | Installation Charges |
| 26 | Hatching Eggs Receiving CounterEmployees delivering hatching eggs to the hatchery must not enter the hatchery in the course of their duties.Eggs should be delivered to the hatchery through a specialized door. |
| 27 | Fumigation room The fumigation room should be as small as possible in order to reduce the amount of fumigant used. A fan should be used to circulate the air and exhaust the fumigant. |
| 28 | Shower roomTo maintain bio-security it is essential that all persons entering the premises shower and change into clean clothing in an adjoining room.It is the only entrance and exit, and the hatchery becomes an isolated unit as far as human beings are concerned. |
| 29 | Egg holding (egg-cooler) roomEgg holding room should be about 8 ft high, insulated, slowly ventilated, with complete air movement, cooled, and humidified. The room must be refrigerated to maintain a temperature of 650c A forced-air type of refrigeration unit is required in order to keep a uniform temperature throughout the room. |
| 30 | SetterRoomSetters (incubators) are kept in this room.The size of the setter room will depend on the make of the equipment used.The incubating equipment takes relatively little floor space.The exact room size involves the aisle and working area necessary to move the eggs and chicks in and out of the machines.A minimum space of 3 ft should be allotted between the sides of adjacent setters and from wall to sides or back of the setters.Similarly, minimum of 10 ft should be allotted in front of two setters when kept face-to-face arrangements. |
| 31 | Egg Candling Dark Room This room is usually constructed in between setter and hatcher room for candling eggs.Candling is usually practiced when eggs are transferred from setter to hatcher. Provisions should be made to dark the room to facilitate easy candling. |
| 32 | Hatcher roomHatchers are kept in this room.Here sufficient spaces are to be allowed around hatcher similar to that of setter room.Since it is prone for contamination with fluffs and debris at the time of hatching, the door towards setter room is to be tightly closed unless the necessity arises (at the time of egg transfer). |
| 33 | Chick holding roomNext to hatcher room, chick-holding room is present.A relative humidity of 65% is maintained to prevent excessive chick dehydration.Here, the chicks are sex-separated, graded,vaccinated and placed in chick boxes. |
| 34 | Wash RoomAfter chicks are boxed, the trays are washed in a tray washer in the washroom.Necessary pipelines with high-pressure pumps are kept in this room. |
| 35 | Clean RoomAfter the trays are washed, they are placed in their trolleys and moved to the adjacent clean room. |
| 36 | All Equipments Set |
| 37 | Mini Feed Mill MachineCapacity- 2-4 Ton Per HourType – AutomaticFrequency – 50 HZPhase – Single PhaseMaterial- Mild SteelVoltage – 220V |
| 38 | Shed For The Feed Mill |
| 39 | Housing ForGoat Farming The houses will be semi-closed type & orientation will be East- West direction. There will be sloppy roof for the comfort of the goats. 1. Maximum length of shed = 100 ft. 2. Width of the shed = 15-20 ft. 3. Central height=3 mtrs., Side height= 2 mtrs. 4. Height of North & South side walls=1 mtr.( 50% of side height) There will be separate houses for keeping different category of goats such as - (dry, pregnant, lactating, sick bucks & kids). Shed premises will have sufficient plantation which protects the animals from direct wind & scorching sun during summer. At least 2 trees in each paddock will be planted.Housing will be constructed on a raised platform (about 1 meter height from ground level). Pakka building by establishing concrete pillars will be constructed for durability. Elevated platform will be made of wooden material/ fiber slat. Side walls will be made up of concrete wall and wire mesh. Roof will be of asbestos sheets. Average floor space per adult female is 10 sq.ft, that of adult male is 20 square ft and that of kid is 4 square ft. Floor should have at least 1 cm space between bamboos/wooden planks to allow passage. |
| 40 | Feeding Mangers: Concrete/brick partition with GI pipe at a distance of 30 cm would be will be constructed |
| 41 | Watering Storage1. For adult: - made of concrete/bricks. Size: ID: 4.80x0.90x0.37m. 2. For young animals (3-6 Months) : 3.60x0.75x0.30 m. 3. For kids (0-3 months) : Plastic tubs of 8-10 litre capacity will be used |
| 42 | Feed & Fodder cultivation Fertile land with assured irrigation facilities is available so that fodder crops could be successfully raised and abundant good quality green fodders will be made available for animal feeding throughout the year. |
| 43 | Veterinary aidVeterinary aid facilities for the goats |
| 44 | Feeding Equipments |
| 45 | Chaff Cutter |
| 46 | Rope Chains |
| 47 | Wiring And Electrification |
| 48 | Concentrate feeds for 02 months @7.5 Kg/ animal/month |
| 49 | Cost of concentrate feed for kids @3 Kg/month/kid |
| 50 | Cost Of Female Goat |
| 51 | Cost Of Male Goat |
| 52 | Waste Management4 Pit of Size-10 x 10 with Brick wall And Cement Plaster for Waste Management.Pit will be used for collection of Manure and waste Material of the Farm |
| 53 | RO PlantCapacity – 1000 ltrCarbon FilterSand Media FilterMicron Cartridge FilterCartridge HousingHigh Pressure PumpMembrane Flow Meter |
| 54 | Mini Urad Dal Processing MachineryURAD DAL SKIN REMOVER 100 Kg/ hr Capacity Millet De-husking Machine with Aspirator and 3 HP three Phase motor with starter With complete set Cleaning Machine with De- Stoner , Aspirator blower |
| 55 | URAD DHAL SPLITTING MACHINE Capacity 100 kg/hr Motor: 3 hp |
| 56 | POLISHER Capacity 100 KG per hour Motor 2 HP Model MS body |
| 57 | DRUM TYPE OIL MIXER/ BLENDER S.S. Mixer Machine 100KG per hour without Motor 2HP Electric Motor 220V Crompton for mixer Machine Motor Pulley & V Belt for Mixer Mach |
| 58 | RICE MILLING MACHINE Contact part fully SS, 5 inch impact Pulverizer Power Required:25-30 Hp Capacity:-100 kg per hour Without motor |
| 59 | RICE DE STONER & De- Huller :- Capacity 100kg/hr, number of deck-2, size -2*2, motor capacity -3 hp single phase, automatic stone discharging path, grader no of deck -2, output-3 port, fan eaf-04, fan speed-1440 rpm , grader deck size-3*2*1 ft. |
| 60 | CLEANING AND GRADING MACHINE 100 Kg/ hr Capacity Millet De- husking Machine with Aspirator and 5 HP three Phase motor with starter With complete set Cleaning Machine with De- Stoner , Aspirator blower |
| 61 | GST charges 18% |
| 62 | Toothbrush |