Bids Are Invited For Network Devices Shifting And Installation Work 1 32 Hpe Rack Server Shifting And Installation , Dell Rack Server Shifting And Installation. , Cisco Router Shifting And Installation. , Firewall Shifting And Installation. , 24 Port Network Switch Shifting And Installation. , Monitor, Mouse, Keyboard Shifting And Installation. , Antivirus Server Desktop Shifting And Installation. , Spss Server Desktop Shifting And Installation. , Bsnl Modem Shifting And Installation. , Nic Modem Shifting And Installation. , Pri Device And Power Backup Shifting And Installation. , Fiber Junction Box Shifting And Installation. , 8 Kva Ups, Batteries With Stand Shifting And Installation. , Ac Shifting And Installation , All Connecters, Cables Shifting Installation And Installation , 12 Core Fiber Optic Cable , Fiber Optic Joint Enclosure , Fiber Duct Or Dwc Pipes For Fiber Optic Cable , 4 Core Fiber Optic Cable , Hdpe Plb Duct Pipe , Giga Sfu , Media Converter , 24 Port Giga Manageable Switch , 24 Port Patch Panel , Patch Cord 1M , Patch Cord Pigtail , Jumper Wires , Rj45 Connectors , 6 U Rack , 8 Port Giga Manageable Switch , 8 Port Patch Panel , 8 Port Fiber Patch Panel Liu , Server Room Door Access System , Server And Network Switches Configuration Active Directory, Local Domain, Separate Network , All Network Cable Testing, Mapping Of All Network And Flow Diagrams , Other Required Installations, Connecters, Cables, Electrical Work , Digging, Filling Of Pits, Fiber Optic Cable Laying And Connect Form Admin Building To Lab Building Approx. 200M And 3 Or 4 Chambers Works. , Digging, Fiber Cable Laying Underground From Lab Building To Main Gate Approx. 30M Total Quantity : 1252