Tender For Upgradation Of Keran Bala Road
Tender Value
19.44 Lakhs
Estimated cost
Bid Submission
20 Aug 2024
0 days left
EMD
38690
Bank guarantee accepted
Document Fee
800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
kralpora → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Upgradation Of Keran Bala Road
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth, as directed by Engineer-in-Charge upto all leads and lifts in all kinds of soil complete |
| 2 | Supply and filling of Nallah Muck in layers of 15cm to the required camber and gradient incl dressing, watering and Consolidation with PRR of 8-10 tonne capacity to the the required density including all costs, loading, unloading,manual or mechanical carriages of materials involved upto all leads and lifts to the site of work complete job |
| 3 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish upto all leads and lifts in all kinds of soil complete |
| 4 | Supply and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm, Stone screening of size 13.2 mm nominal size (Type A) and binding material incl Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density including all costs, loading, unloading,manual or mechanical carriages of materials involved upto all leads and lifts to the site of work complete job |
| 5 | Earth work in excavation by manual/ mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed upto all leads and lifts in all kinds of soil complete |
| 6 | P/L of dry stone soling duly hand packed in foundation trenches and under floors incl dressing watering and compacting with hand rammersincluding all costs, loading, unloading, manual or mechanical carriages of materials involved upto all leads and lifts to the site of work complete job |
| 7 | P/L in position cement concrete of specified grade excl. the cost of centering and shuttering with 1:4:8 (1 cement 4: coarse sand 8 graded stone crushed agg.40mm nominal size) incl cost of curing all work upto plinth level including all costs, loading, unloading, manual or mechanical carriages of materials involved upto all leads and lifts to the site of work complete job |
| 8 | Providing/laying in position cement concrete of specified grade excluding the cost of centering & shuttering in 1:3:6 (1 Cement: 3 Coarse Sand: 6 graded stone aggregate 20mm nominal size- crushed.) including all costs, loading, unloading, manual or mechanical carriages of materials involved upto all leads and lifts to the site of work complete job |
| 9 | Centring and shutteringincluding strutting proping and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 10 | Providing and laying 18\" dia Non-pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. incl earthwork in excavation and lying of Pipes in proper grade and slope with cushioning over pipes with approved granular materialincluding all leads, lifts Cost & Carriage of Materials involved upto site of work complete jobc. |
| 11 | Providing and laying 36\" dia Non-pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. incl earthwork in excavation and lying of Pipes in proper grade and slope with cushioning over pipes with approved granular materialincluding all leads, lifts Cost & Carriage of Materials involved upto site of work complete job |
AI Tender Summary
Tender Timeline
Aug 13, 2024
11:30 IST
Tender Published
Tender notice published.
CompletedAug 20, 2024
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 21, 2024
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender