Tender For E.T.P Operation And Audit Report Works For Season 2024-25, Etp Plants Installed In The Mill During The Session 2024-25 And Uppcb To Develop Sulphate Removeable Plant Scientifically Through Cpcb The Work Of Operation As Per The Standards Set A
Tender Overview
Project Description
Tender For E.T.P Operation And Audit Report Works For Season 2024-25, ETP plants installed in the mill during the session 2024-25 and UPPCB to develop Sulphate Removeable Plant scientifically through CPCB The work of operation as per the standards set at time-2. to the contractor Getting the ETP operated by an engineer skilled in environmental science and Environmental installed in effluent testing mill as per requirement Minimum 3 years of experience in lab. B. Tech/Environmental Engg./Chemical Engg./M.Sc. (Environmental Science) qualification And three workers are ITI trained (one worker per shift) and Three workers are from ITI to run the sulphate removal plant. trained (One worker per shift) will be required to be employed permanently. ETP and Operation of Sulphate Remove Plant under the supervision of Environmental Engineer. P.C.B.U.P.P.C.B. Will have to conform to the standards. During the session 2024-25, getting the samples of water going to ETP and after treatment tested from MoEF/NABL authorized body lab and getting water consent from UPPCB for the calendar year 2024. To prepare the environmental audit report for the financial year 2023-24 and prepare the environmental management plan for the year 2024-25 and submit it to UPPCB within the stipulated time. The work of getting it done and submitting it to UPPCB within the stipulated time.
BOQ
| Sl. No. | Item Description |
| 1 | E.T.P OPERATION AND AUDIT REPORT WORK |
| 2 | l= 2024&25 ds nkSjku fey esa LFkkfir bZ0Vh0ih0 la;U=ksa ,oa lYQsV fjewcy IykUV dk cSKkfud rjhds ls] ;wihihlhch @lhihlhch ds le;^&2 ij fu/kkZfjr ekudksa ds vuq:i lapkyu dk dk;ZA Bsdsnkj dks bUok;jesUVy lkbUl esa fuiq.k bUth0 ls bZ0Vh0ih0 lapkyu djkuk ,oa vko”;drk vuqlkj b¶yq,UV dh VSfLVax fey esa LFkkfir bUok;jesUVy ySc esa djus gsrq de ls de 3 o’kZ dk vuqHkoh]ch-VSd@bUok;jesUVy bath0 @dSfedy bUth0@,e-,l-lh-¼bUok;jesUVy lkbal½ ;ksX;rk /kkjh gks o rhu deZdkj&vkbZ0Vh0 vkbZ0 izf”kf{kr ¼izfr ikyh ,d deZdkj½ ,oa lYQsV fjewcy IykUV dks pykus ds fy, rhu deZdkj]vkbZ-Vh-vkbZ-izf”kf{kr ¼izfr ikyh ,d deZdkj½ LFkkbZ :i ls yxkuk vko”;d gksxkA bZ0Vh0ih0o lYQsV fjewcy IykUV dk lapkyu bUok;jesUVy bUth0 dh ns[kjs[k esa lh-ih-lh-ch-@;w-ih-ih-lh-ch-ds ekudksa ds vuq:i djuk gksxkA |
| 3 | l= 2024&25 ds nkSjku bZ0Vh0 ih0 dks tkus okys rFkk “kks/ku mijkUr ty ds lSEiy dk ijh{k.k MoEF/NABL ls vf/kd`r ckg~; ySc ls djkus o dySUMj o’kZ 2024 gsrq ;wihihlhch ls ty lgefr izkIr djkukA |
| 4 | foRrh;o\"kZ 2023&24 dh bUok;jesUVy vkWfMV fjiksV rS;kj djkus rFkk bUok;jesUVy eSustesUV Iyku o’kZ 2024&25 gsrq rS;kj djkus ,oa ;wihihlhch dks fu/kkZfjr le; esa izLrqr djus dk dk;Z |
| 5 | foRrh; o’kZ 2024&25 gsrq bUok;jesUVy eSustesUV Iyku rS;kj djkus ,oa ;wihihlhch dks fu/kkZfjr le; esa izLrqr djus dk dk;Z |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender