| 1 | Earth work in excavation (for earthing pits): Labour only for earth work in excavation for earthpitetc., not exceeding 1.50 m wide and not exceeding 1.5 min depth getting out in hard or dense soil as ordered by EIC/SIC. |
| 2 | Removal of spoil: Labour only for removal of spoil mixed with excavated earth, damaged tarfelt, damaged plaster, broken bricks, concrete rubbish and debris, broken glasses etc. from work site to a distance of 1.50 km. outside the factory or as directed by the EIC/SIC (20% deduction in measurement will be made from the volume of spoil ). |
| 3 | P.C.C. (1:2:4) : M & L for providing plain cement concrete type-B1, 1:2:4 mix ( using 12.5 mm graded stone aggregate ) as in sub-base, filling and mass concrete, topping of floor as ordered by EIC/SIC. |
| 4 | Liquid water proofing compound: Supply & mixing of Liquid water proofing compound like Sika/ Dr. fixit / Shalimar or substantially equvalant make water proofing admixture or any approved BIS standard LWPC, mixed with cement concrete or cement morter @0.20 Lit /bag of cement complete as ordered by EIC & SIC. |
| 5 | Bitumastic Gola: M & L for using hard bitumastic gola,with 80/25 bitumen and coarse sand mixture. 1:3 by weight, 8cm x 8cm at the junction of roofing to vertical / horizontal surfaces for sealing the gaps or holesor as directed by EIC & SIC. |
| 6 | Repairing Cracks: M & L for cutting out cracks to V-section in existing roofs or terracing, cleaning out, wetting, grouting with cement and sand slurry 1:3 complete as ordered by EIC/SIC. |
| 7 | Cutting grooves : Labour only for cutting grooves in brick wall, 75 mm wide and 65 mm deep and shaping horizontal face of groove making good with cement mortar (1:3) complete as ordered by EIC/SIC. |
| 8 | APP: S & F of APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) after applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m including cleaning surfaces after necessary preparetory work,the layer of APP shall be laid using butane torch and sealing all joints properly complete all. [The firm has to submit warranty of Seven Years ( from the date of completion) in respect ofthis item @ 2% ofthe value of this item in the form of Bank guarantee/TDR before claiming final payment . In case of any leakage through the roof area done by this item, firm has to rectify the samewithin 7 days otherwise the same will be forfeited.] |
| 9 | Taking down Plastering: Labour only for taking down cement plastering or bedding layer on brick or stone walls,roof etc. including raking out joints, hacking for key,scrubbing down with water, etc. to received new bedding layer in any position complete as ordered by EIC/SIC. |
| 10 | Bedding layer (1:6) :M & L for rendering average 20 mm thick cement plaster 1:6in screed bed over existing concrete surface etc. of any description as ordered by EIC/SIC. |
| 11 | Ceiling plastering (1:4) : M & L for rendering 10 mm thick cement plaster 1:4 mix in ceiling or concrete surfaces of any description as ordered by EIC/SIC |
| 12 | Cement plaster(1:6): M & L for providing 12 mm thick cement plaster 1:6 mix on fair faces of brick work or concrete surfacesas ordered by EIC/SIC. |
| 13 | Washable distempering in ceiling :M & L for applying two coats of washable distemper of 1st quality make- Asian / Berger / ICIor substantially equivalent make and approvedshadeafter necessary preparatory workwithprimer to distempering in ceiling as ordered by EIC/SIC. |
| 14 | PVC rain water pipe 110mm dia : S & F 110mm dia. bore PVC (SWR)single socketed[Make: Oriplast / Supreme / Finolex or substantially equivalent ], in any length with rubber ring joints, properly fixed in wall, trenches or in floors as ordered by EIC/SIC. |
| 15 | PVC door \"T\" junction 110mm : S & F 110mm dia. PVC (SWR) \"T\" junction,[Make: Oriplast / Supreme / Finolex or substantially equivalent ] equal or unequal to fixed in position as ordered by EIC/SIC. |
| 16 | Air-termination Copper rod: Supply and fixing of Air-Termination copper rod 12 MM dia and 300 MM long, single pointed at the top and rigid connection to the down conductor all as ordered. |
| 17 | Earthing: Material and labour for earthing complete with medium class G.I. Pipe electrode 40 MM dia. 2.5 meters length, buried directly and preferably vertically in ground with top edge not less than 1.25 metres below ground level connected earthing lead by using 25 x 4 mm galvanised iron strip upto the test point and making of pit as shown in plate-2 alongwith alternative layer of charcoal and salt including testing of all as ordered. |
| 18 | Dismantling & Refixing of AL/G.I. Flat type conductor: Dismantling & refixing of AL/G.I. Flat type conductor all as ordered. |
| 19 | Earth continuity conductor: S & F earth continuity conductor to wall or buried in ground or any other indicated situation for earthing of size 25mm x 3mm Al strip all as ordered. |
| 20 | Dismanting of brick work: Labour only for dismantling of brick work or stone/boulder masonry of any typebuilt in cement morter including all quoins, arches, pillars etc as order. |
| 21 | Water proofing treatment: S & F of polymeric bituminous water proofing membrane of 2 mm thick (approx.) of wt. 2.25 kg./ sqm to be laid over ( after applying)one layer of blown bitumen on existing surface after necessary preparetory work and then another layer of blown bitumen to be applied over the newly laid water proofing membrane ( bitumen Grade for both the layers should be 30/40 and total quantity of bitumen on both layers should be minimum @ 2.4 kg / sqm )all complete as orderedby EIC/SIC.[The firm has to submit warranty of Four Years ( from the date of completion) in respect of this item @ 2% ofthe value of this item in the form of Bank guarantee/TDR before claiming final payment . In case of any leakage through the roof area done by this item, firm has to rectify the samewithin 7 days otherwise the same will be forfeited.] |
| 22 | Taking out damaged old Tarfelt: Labour only for taking out existing old damaged tarfelt from the roof surface and cleared the same from work site to place nearby ground area as ordered by SIC / EIC. |
| 23 | Uprooting of plants : Labour only for complete uprooting of plants of any girth and any description after thatm & l for using acid/copper sulphate in the root position of plants and making good the dismantled area by using cement mortar 1:3 complete all as ordered by EIC/SIC. |
| 24 | Insulator for running of lightening conductor: Supply and fixing of insulator for running of lightening conductor through the wall or roof all as ordered. |