Supply Of Materials Required For The Construction Of Sanjeevini Shed At Bandiganahalli Village Doddabemmati Gp Under The Mgnreg Scheme For The Year 2023-24 Arakalgud Taluk - Stone Aggregate (Single Size ) 10Mm Nominal Size (Sanjevini.Shed),Stone Aggregate (Single Size ) 20Mm Nominal Size (Sanjevini.Shed),Handling Loading And Unloading 3% On Materials (Sanjevini.Shed),Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material (Sanjevini.Shed),Polyenthylene Water Storage Tank Of Specified Capacity L (Sanjevini.Shed),Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint (Sanjevini.Shed),Enamel Paint (Sanjevini.Shed),Painter Class I (Sanjevini.Shed),Add Brush, Putty, Glue At 5% On Cost Of Paint (Sanjevini.Shed),Whitening (Sanjevini.Shed),Dry Distemper (Sanjevini.Shed),White Cement (Sanjevini.Shed),Ceramic Tiles 30 X 30 Mm (Sanjevini.Shed),Teak Wood Beading 20 X 20 Mm (Sanjevini.Shed),Add 15% Wastage (Sanjevini.Shed),Reeded Glass 3Mm Thick (Sanjevini.Shed),Add 5% Wastage Charges (Sanjevini.Shed),Mathi/Nandi Wood Scantling For Styles And Rails 25Mm Thickplanks For Panels 25Mm Thick (Sanjevini.Shed),Mathi/Nandi Wood Scantling For Styles And Rails 30Mm Thickplanks For Panels 25Mm Thick (Sanjevini.Shed),Honne Wood Planks For Panels 20Mm Thick (Sanjevini.Shed),Honne Wood (Sanjevini.Shed),Hom Of Machinaries For Planing (Sanjevini.Shed),Add Cutting And Other Wastage 5% (Sanjevini.Shed),Mathi/Nandi Wood Planks For Panels 25Mm Thick (Sanjevini.Shed),Vetrified Tiles 600X600mm (Sanjevini.Shed),Add Providing And Removing Scafolding At 3% On Labour (Sanjevini.Shed),Burnt Bricks Class 35 (Non Modular) (Sanjevini.Shed),Add Handling, Loading And Unloading At 1% On Material (Sanjevini.Shed),Brick (Sanjevini.Shed),Add Sundries Charges At 2% On Materials (Sanjevini.Shed),Casurina Poles 100 To 150 Mm (Sanjevini.Shed),Add Handling, Loading And Unloading At 2% On Material (Sanjevini.Shed),Casurina Poles 75-100 Mm Dia (Sanjevini.Shed),Jungle Wood Runners And Planks (Sanjevini.Shed),Silver Oak Or Equivalent Planks 38 Mm Thick (Sanjevini.Shed),Add Watering Charges At 1% On Labour (Sanjevini.Shed),Add Sundries Charges At 1% On Labour (Sanjevini.Shed),Stone Chistler Class Ii (Sanjevini.Shed),Mason Class Ii (With Tools) (Sanjevini.Shed),Mason Class I (With Tools) (Sanjevini.Shed),Mixer (Concrete Small Used In Culvert) (Sanjevini.Shed),Boulders (Sanjevini.Shed),Bond Stone 20 X 20 X 45 Cms (Sanjevini.Shed),Size Tone 20 X 20 X 25 Cms (Sanjevini.Shed),Binding Wire (Sanjevini.Shed),Tmt Bars Fe 500 (Sanjevini.Shed),Hom Of Vibrator 0.71 Days (Sanjevini.Shed),Plasticizer /Super Plasticizer (Sanjevini.Shed),Add Sundries Charges At 1% On Materials (Sanjevini.Shed),Add Watering Charges At 1% On Materials (Sanjevini.Shed),Mixer (Concrete) 1 Cum Capacity (Sanjevini.Shed),Portaland Cement (Sanjevini.Shed),Coarse Sand (Zone Iii) (Sanjevini.Shed),Broken Stone Aggregate 12 Mm To 10Mm Size (Sanjevini.Shed),Broken Stone Aggregate 20 Mm Size (Sanjevini.Shed),Broken Stone Aggregate 40 Mm Size (Sanjevini.Shed)