|
| 1 | Shifting of SFJB from Jallian and Re-installing at Cheeran Chamber and Replacing Necessary Nut,Bolts,guard and rebates Complete Job |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator)in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil : |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etcupto floor V level, including curing but excluding the cost of centring, shutteringand finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 6 | Foundations, footings, bases of columns etc. for mass concrete. |
| 7 | Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc. |
| 8 | Dumping stone including cost of stones. On Horizontal on level. |
| 9 | Carriage of material by M.T inclloading/unloading& stacking complete |
| 10 | Sand/Stone agg. below 40 mm nominal size avg. lead 25 km by MT |