| 1 | Detail of Work |
| 2 | Safely cartage of25 KVA T/F from ESC, SRE to site of work including loading & unloading at both ends. (Dist.Up to 40 Km.) |
| 3 | Safely cartage ofPCC poles 8.5 Mtr. long from ESC, SRE/JE store to site of work at various sites including loading & unloading at both ends. (Dist.Up to 40 Km.) |
| 4 | Safely cartage ofSTP poles 11 Mtr. long from ESC, SRE/JE store to site of work at various sites including loading & unloading at both ends. (Dist.Up to 40 Km.) |
| 5 | Safely Carriage of Fuse setfrom ESC SRE to site of work including loading and unloading at both ends |
| 6 | Safely Carriage of 11 KV Metering Cubical& 11 KV CT/PT Unit from ESC SRE to Site of work including loadign and unloading at both ends. |
| 7 | Safely cartage of other complete line material(Except PCC/ST Poles) from ESC, SRE/JE store to site of work at various sitesincluding loading, unloading at both ends.( Dist.Upto 40 Km.) |
| 8 | Safely Installation of CT/PT Unit and connection properly. |
| 9 | Safely Installation of Metering cubical and connection properly. |
| 10 | Erection of single support onPCC/ST poles up to 8.5/11 MtrLong with complete fitting of all accessories of11 KV/LT line.as per RESSPO specification. |
| 11 | Safely Installation of Fuse Set and connection properly |
| 12 | Providing of MS nuts & bolts & washers off size |
| 13 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Weasel Conductor for 11KV/LT Lineincluding complete. |
| 14 | Guarding work |
| 15 | Laying lifting and stringing proper sagging ABC cable of size 3x50 sq.mm including fixing of all type clamp and connector providing all accessories. |
| 16 | Grouting of STP 11 Mtr long with cement concreting in bolck of 600X600X1500 MM. in ratio 1:4:8 with cement, sand and brick ballast size 1\"\"x1.5\"\" with plinth. |
| 17 | Safely Installation of Fuse Set and connection properly |
| 18 | Earthing of Pole by earthing Rod |
| 19 | Laying of 11 KV XLPE cable 3x70 Sqmm |
| 20 | Making and fixing cable jointing kit size 3x70 sq.mm O/D & I/D Type. |
| 21 | Providing and fixing of All type clamp |
| 22 | Providing and fixing of Stone Pad |
| 23 | Providing and fixing of Holding Clamp |
| 24 | Providing and fixing of Stay Clamp |
| 25 | Providing and fixing of J-hook with clamp |
| 26 | Grouting and Fixing of stay rods by digging of pits in block 600x600x300 MM & cementconcreting in ratio 1:4:8 with cement, sand and brick ballast and nozzling of stay wire 7/10 SWG and fitting the same on the pole including fixing of stay insulator in stay wire. |
| 27 | Fabrication and erection of double pole on 8.5 Mtr. long PCC Poles/11 Mtr Long STP Pole with complete fitting e.g channel bracings etc. including fitting of Disc/Pin insulators duly grouted with cement concreting in block of 450x450x1500mm.in ratio 1:4:8 with cement, sand and brick ballast size 1\"x1.5\". with plinth as per RESPO specifications |
| 28 | Safe installation of 25KVA T/F on the D/p with complete fittings including making HT connections and commissioning. |
| 29 | Laying of LT/XLPE cable 3.5x70 sq.mm as per respo specification. |